Cost Planning
Takashi Tanaka
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Price for Developing Country
Indian Market Vehicle
Toyota
Etios ①
Nissan
Datson
Honda
BRIO ②
Suzuki
Alto
Hyundai
Eon
Ford
Figo
Tata
Nano ③

$ 8,300
Mobius
VW

$ 5,000

Tata

Nano
Bajaj

Datson unveil on 2014
Asahi News Paper, DIGITAL 2012, 5, 24
2

Logan

$ 2,000

2013, 3, 25 NIKKEI BUSINESS

RE60
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

3

1

Explanation of Cost Planning

2

To execute Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Management

4

Development phase
(Month)

New automobile
development

-20
Planning

-10
Develop, Test

0
Prepare

Production

Design freeze

Accepting phase

Product
Cost

Cost
Planning

Cost reduction activity
Cost management

Cost sustaining
Cost improve
Cost Structure
Material

Example

Material

Metal sheet, paint, etc

Purchasing

Tire, audio, purchasing parts

Scrap, Defect

Material, defect parts, scrap

Production

Direct labor

Payment, bonus, etc

Depreciation, tax, insurance

Building, facility, tools

Indirect material

Tools, oil

Purchasing

Building, machine repair, maintenance

Other personnel expenses

Travel, transportation

Energy

In-direct

Labor & others

Total Product Cost/ Vehicle

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Detail

Electric, air
Production engineering

Development

5

In-direct

Design, development, evaluation & test
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Target Setting

6

Sales Price

Target Cost
-3%

Cost

Purchasing & Suppliers

-30%

Cost Planning

Current

New

(Added more new
features)
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Bad Cost Reduction Activity
Added Cost
(New feature)

VE

Low possibility.
Unclear results

Heavy
Work-load
VE

VE

Cost reduction
activity
VE: Value Engineering

Current
7

VE

Rough
estimation

Target Cost
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

8

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Sample Project
Background
• Design in Japan and US, then production in China

• Product reduction target for 50%
• OEM expect suggestion to be a long-term partner

Development phase:
• Planning phase
• Using Oobeya for collaborative development

9
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Physical Oobeya: Basic Layout

10

Cost

Invest
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Goal of Digital Cost Planning

11

 Reduce the time for DR: 5-days -> 2-hours
 Reduction of development lead-time
 Improve design quality
12

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

13

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
Systems Engineering

14

Entire
Vehicle

System decomposition

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Development Process
Requirement

Test

Function

Total

System
Mecha.

Sub-System

Electric

S/W

Evaluation

Logical
SubSystem

Integrate
Test

Requirement
Function

Evaluate

Logical

Functional
Mock-up

Component

Digital

Integrate
Physical

Actual
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Digital Design Review

15

Digital mock-up
Functional mock-up
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Definition of RFLP
R

Market
Expectation

Electric

L

F

unction

Function

ogical

Structure

P

hysical

Component

• Device
• Measures

Mechanical

Software

16

equirement

User’s view

• Quantified
specification
• Parameter
• Definition of Input/
Output

• Detail design

• Plan & Circuit
• Architecture
• Schema
• Collaboration with S/W

• 3D Wiring
• Tubing

• Architecture
• Interface

• Source code
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Decomposition of Sun-roof
R

equirement

Cost
Weight

unction

Safety

Light

L

ogical

Frame
Internal parts

Sun light

Handling

Glass

Shut out

・
・
・

Temperature
・
・
・

hysical

External parts

Control light

Cool

P

Drive

NVH
Open/Close

・
・
・

17

F
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

18

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

By Function- Cost, make Cost Reduction scenario
Sun-roof
フレーム
Frame

Current

After

20

110

50

20

20

20

100

220

90

10

10

10

10

20

20

Shut out

10

10

10

Temperature

5

5

10

10

$45

$145

Total $400

Total $200

Function

動
Drive

Safety

80

ガラス
Glass
10

NVH
Open/ close

120

Sun light
Control light

Cost

10

$210

-50% Reduction
19

•Shocked about safety cost
• Change design concept
• Simulation effectively

•Competitor is only $90,
Bench marking
• Completely new design
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Opportunity to Improve

20

 Over expectation of Drivability and Quality:
Change design concept completely

 Barrier of KEIRETSU:
New and open relationship with suppliers
Scenario of Demo
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

1.Using a carried over
RFLP of Sun-roof

Function- cost
decomposition

But +20Kg by
using big
vehicle’s

Overturned by
simulation

Reduced 50%
cost

Only +5Kg

No problem by
simulation

2.New design
Function- cost
Consider differently

Design change

Confirm design of
sun-roof

21

Reduced 50%
cost
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Reduction Target: Break down
Input in CAD
R

equirement

R1

Common

F

unction

F1

F2

Trade-off

22

ogical

L1

L2

R2
R3

L

L3

P

hysical

P1
P2
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Reduction -50%
1.Reduced cost using a carried over of sun-roof

23
Simulation
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

1.Reduced cost using a carried over of sun-roof

Rem: Follow up later items is establish another file, GM checks w eekly.

Engine
Related

Face

Final
Order

Design Check Sheet

Eng Type
Factory Car Type
Distribute Other

Route: Design room -> Manager ->each CE
2- copy for group

Parts#
Name
Other

G

Depart
R
Outside design request #:
Design change #:

Requested section

Document, Memo

Cost

CE agree

Weight

GM

Leader

Establish

Order Final
M

Planning

Estimated

M

D

min

M

D

min

M

D

min Inspect drawing

Y-N

Y-N
Y-N
Final audit of draw ing
1. No problem

  Cost Planning

Change drawing

$
(+ -

Outside design
Recognized draw

g

  Outside

%)  (

) (+ -

%)

Background, Objective

Others

Count

  Research

Check   VA, VE

with leader

2. No confirmation, but no problem
3. There is issue, but go
  What is issue?

  Change spec   Commonalization
   Reduce weight

Durability, Reliability check
Item

D

  Purchase, Fin

Drawing

  Performance    Productivity
  Solution of Issue
   Service efficiency
   Others

If it needed,
distribute to
production
engineering
of each factory

Continue hi-speed
Full throttle U/D
Low sw eep U/D
Total pattern
Total temperature
Low temperature
Ex main temp.
Long drive
Hammering
Stresses
Resonance
Dirt course
Hi-speed reliability
Heat test
Body test
CAE Stress

Explain:
Contents of change, Problems by GM

Attachment Planning figure
Engineering check sheet
Required specification

Objective, reason by GM
  Performance   Solution of Issue

  NV improve
  contact issue   Others (

  Request from others (CE, Production)
  Commonalization

  Service efficiency

  Cost reduction  SOC problem   Others(

   

  

)

)

  Reduce weight

Cost
Contents of change

1.SOP phase
2.Target cost
3.Current
4.Supplier estimate
5.Gap

Anxious by change

Countermeasure

Reflect for test (Left table)

Reflect to production

6.Countermeasure

Prototype
1.Parts cost
2.Mold
3.Total

Weight
1.SOP phase
2.Target cost
3.Current
4.Supplier estimate

If necessary
internally,

Copy

 N

5.Gap

Later Recognized draw ing
OR Follow up ( Y - N )
Check grade

Plan ( /

)

Plan ( /
M

D

M

Item

D

)

6.Countermeasure
M

Check

D

M

D

Item

Check

Engineer 1
2GY   1

No issue

:

++

 

Regulation check require ( Y - N)

Conf irm with Material dep: rubber, plastic, paint

No guessing issue : +

Acceptance f or F/R, F/F

General name of material(                  )

Guessing issue : -

Parts list of OBD(On-board diagnosis)

Assembly and serv ice(Line tools, serv ice manual)

No countermeasure: -Not accept:

  Saf ety issue (FH, Crash, OR, Leak)

Blank Conf irmation Engineering check sheet

Row material, process with prod. Eng & supplier
Conf irm guideline of parts f itting (Internal E2-14)

Including all PPC items

    Drawing: parts table, request, label

The case of - and --,

Satisf ied required f unctions by reliability matrix

    Change Drawing: old parts, ov ersea,

Write f ollow up date

Keep dev elopment target by justif ication check sheet

    Parts table: Saf ety , regulation, maker option

Conf irmed by control design inf ormation matrix

    Pattent:requested (Y N), Fall f ault (Y N Analy )

Implement DRBFM

Deliv ery location, change(

Prohibited design change, conf irmed by real parts
  Conf lict of parts, distance, slack, f astened, seal

)

Env ironmental condition & inf luence
  Oil, water & gas temperature, f rozen, f uel, etc

      Caulking, weld, press, insert choking

Information
Leader comments:

Roll out other model(Y N), Influence other organization(Y N), informed(Y N):

Total

24

(Revised '05 June)

#1: Each engine & using area has template
#2: Attach engineering check sheet

 

Check sub-design check sheet of back side
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Design Change
2.Change design concept completely, using a new design and reduced cost

L
Safety

80

Frame

Total

10

20

110
20

100

220

NVH
Open/Close

120

Sun light

10

Control Light

10

10

Tempere.

5

$210

10

10 導風開口面積と最大高さh

Shut out

Total

25

Drive

Glass

20

F

$45

75cm2 :80mm
100cm2 :130mm
125cm2:150mm

20
10

5

10

$145

$400
Simulation after design change
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

2.Change design concept completely, using a new design and reduced cost

サプライチェーンの見直しによる原価低減20%

26
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Expecting Target

27

Quality

 A bit higher price level

Target

Price

 Accomplish quality target
-Systems Engineering to reduce cost
-Using simulation effectively
-Quality into Process
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Summary

28

 Cost Planning to reduce product cost of >30%

 Change working behavior and habit
 Global and collaborative activity
 Functional design to reduce cost 50%
29

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

More Related Content

PPTX
Oscar mayer
PPTX
SM_McDonald's
PPTX
Mcdonald's IMC and its marketing strategy from the history. ...
PPTX
CASE Reebok NFL Replica Jerseys
PPTX
McDonalds ppt
PPTX
The "mi adidas" Mass Customization Initiative
PDF
Emobility supply chain expansion case study
PPTX
Jose’s authentic mexican restaurant
Oscar mayer
SM_McDonald's
Mcdonald's IMC and its marketing strategy from the history. ...
CASE Reebok NFL Replica Jerseys
McDonalds ppt
The "mi adidas" Mass Customization Initiative
Emobility supply chain expansion case study
Jose’s authentic mexican restaurant

What's hot (20)

PDF
First, let's fire all the managers
PPTX
Operations Strategy at Galanz
PPTX
Unilever case presentation
PPTX
Global supply chain case study team8_submit v2
PDF
Zomato: Strategic Advantage
PPTX
Agile ceremonies
PPTX
Overview on Agile, Scrum, Kanban, Extreme programming (XP) and Scaled Agile F...
PPSX
Xm satellite final0
PPSX
Brannigan Strategic Marketing Plan
PPTX
Amazon.com Supply chain management- case study
PPT
mcdonalds_strategicmanagementanalysis_15.ppt
DOCX
Barco case study team a final
PPT
Global Supply Simulation Presentation - Team 14
PPTX
Signode case Operations Strategy
PPTX
The Scrum Guide 2020.pptx
DOCX
New heritage doll company report
PPTX
Mind tree:A community of communities
PPTX
Pizza Hut Marketing Research Project
PDF
Situational Leadership Article
First, let's fire all the managers
Operations Strategy at Galanz
Unilever case presentation
Global supply chain case study team8_submit v2
Zomato: Strategic Advantage
Agile ceremonies
Overview on Agile, Scrum, Kanban, Extreme programming (XP) and Scaled Agile F...
Xm satellite final0
Brannigan Strategic Marketing Plan
Amazon.com Supply chain management- case study
mcdonalds_strategicmanagementanalysis_15.ppt
Barco case study team a final
Global Supply Simulation Presentation - Team 14
Signode case Operations Strategy
The Scrum Guide 2020.pptx
New heritage doll company report
Mind tree:A community of communities
Pizza Hut Marketing Research Project
Situational Leadership Article
Ad

Viewers also liked (20)

PDF
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
PDF
eBay: A lean & agile content case study by Michael B. Jones
PDF
Lean data center, a telco experience by Andrea Pinnola, Telecom Italia
PDF
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
PDF
Toyota kata – habits for continuous improvements by Hakan Forss
PDF
Built in Quality by Michael Ballé - Lean IT Summit 2013
PDF
Creating Value for the Poor with Lean IT by Dr. Khuloud Odeh
PDF
Leonardo Mattiazzi at the Lean IT Summit 2013
PDF
From push to pull in IT by Faurecia
PDF
Escaping the Legacy of Mass Production by Prof Daniel T Jones
PDF
Gemba walks in IT project management by Pina Allegretti
PDF
Learning from the fast developing practice of Lean IT by Steve Bell
PDF
IS delivering value to the business by Hakan Borglund Toyota MHE
PPSX
Leveraging Lean for IT and research transformation by Jeromy Markwort
PDF
Unleash your team's creativity with lean by Karim Aouadi
PPSX
Service Desk – VOC: the heart of Lean in IT using Oobeya to lead change by Da...
PDF
Lean & Agile by Régis Medina at the Lean IT Summit 2013
PDF
Improve software development speed beyond your customer’s dreams with Lean
PDF
Lean and ITIL: reaching to the (hidden) face of the moon by Nicolas Stampf, BP2i
PDF
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
eBay: A lean & agile content case study by Michael B. Jones
Lean data center, a telco experience by Andrea Pinnola, Telecom Italia
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
Toyota kata – habits for continuous improvements by Hakan Forss
Built in Quality by Michael Ballé - Lean IT Summit 2013
Creating Value for the Poor with Lean IT by Dr. Khuloud Odeh
Leonardo Mattiazzi at the Lean IT Summit 2013
From push to pull in IT by Faurecia
Escaping the Legacy of Mass Production by Prof Daniel T Jones
Gemba walks in IT project management by Pina Allegretti
Learning from the fast developing practice of Lean IT by Steve Bell
IS delivering value to the business by Hakan Borglund Toyota MHE
Leveraging Lean for IT and research transformation by Jeromy Markwort
Unleash your team's creativity with lean by Karim Aouadi
Service Desk – VOC: the heart of Lean in IT using Oobeya to lead change by Da...
Lean & Agile by Régis Medina at the Lean IT Summit 2013
Improve software development speed beyond your customer’s dreams with Lean
Lean and ITIL: reaching to the (hidden) face of the moon by Nicolas Stampf, BP2i
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
Ad

Similar to Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013 (20)

PPTX
Introduction into Mechanical Design - Reverse Engineering.pptx
PPT
DesignTech Systems - DCS presentation Oct 2017
PPTX
Quality and Cost Management: Methods and Results
PPSX
SOLIDWORKS Simulation Standard
PPTX
Design for x : Design for Manufacturing,Design for Assembly
PPTX
Pioneer Technologies, Pune
DOC
Concept development using Optimization, DFM & CAE - In DFSS Way
PPTX
42629 lecture 3 pt3
PDF
Grand Challenges of Advanced Computing for Energy Innovation
PPTX
Systems Engineering
PPT
Chapter 7 QFD.ppt
PPT
Presentation_12_5_05.ppt
PDF
Correlation of simulation_models_using_concept_modeling
PPT
design optimization for effective manufacturing
PDF
Continental MFC430T and ZF-TRW S-Cam 3 and Bosch–MPC2 reports - teardown reve...
PDF
Product design
PPT
Product Design and Development.ppt
PPT
Design for Assembly (DFA)
PDF
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
PDF
IRJET- Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Da...
Introduction into Mechanical Design - Reverse Engineering.pptx
DesignTech Systems - DCS presentation Oct 2017
Quality and Cost Management: Methods and Results
SOLIDWORKS Simulation Standard
Design for x : Design for Manufacturing,Design for Assembly
Pioneer Technologies, Pune
Concept development using Optimization, DFM & CAE - In DFSS Way
42629 lecture 3 pt3
Grand Challenges of Advanced Computing for Energy Innovation
Systems Engineering
Chapter 7 QFD.ppt
Presentation_12_5_05.ppt
Correlation of simulation_models_using_concept_modeling
design optimization for effective manufacturing
Continental MFC430T and ZF-TRW S-Cam 3 and Bosch–MPC2 reports - teardown reve...
Product design
Product Design and Development.ppt
Design for Assembly (DFA)
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
IRJET- Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Da...

More from Institut Lean France (20)

PPTX
Le "Scenario Planning" pour réagir en situation de crise
PDF
Le "Scenario Planning" pour réagir en situation de crise
PDF
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
PDF
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
PDF
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
PDF
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
PDF
Management practices for the digital era by Cecil Dijoux
PDF
Build hyper efficient team with TPS by Pierre Jannez
PDF
Lean organization framework by Pierre Masai
PDF
The high performance learning enterpris, by Steve Bell and Karen Whitley
PDF
Story of LeSS by Bas Vodde
PDF
True Continuous Improvement with Toyota Kata, Jesper Boeg
PDF
Getting to the heart of agile by Alistair Cockburn
PDF
Lean and agile software because or despite rising complexity by Yves Caseau
PDF
A transformation journey for a complex development organization
PDF
Can Lean help improve the Architecture Maturity of an entire Organization?
PDF
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
PDF
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
PDF
Présentation COGETIQ Lean Tour Blois 2018
PDF
Présentation BMI Lean Tour Blois 2018
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Management practices for the digital era by Cecil Dijoux
Build hyper efficient team with TPS by Pierre Jannez
Lean organization framework by Pierre Masai
The high performance learning enterpris, by Steve Bell and Karen Whitley
Story of LeSS by Bas Vodde
True Continuous Improvement with Toyota Kata, Jesper Boeg
Getting to the heart of agile by Alistair Cockburn
Lean and agile software because or despite rising complexity by Yves Caseau
A transformation journey for a complex development organization
Can Lean help improve the Architecture Maturity of an entire Organization?
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Présentation COGETIQ Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018

Recently uploaded (20)

PPTX
Internet of Everything -Basic concepts details
PDF
Comparative analysis of machine learning models for fake news detection in so...
PDF
Dell Pro Micro: Speed customer interactions, patient processing, and learning...
PPTX
GROUP4NURSINGINFORMATICSREPORT-2 PRESENTATION
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PDF
Connector Corner: Transform Unstructured Documents with Agentic Automation
PDF
EIS-Webinar-Regulated-Industries-2025-08.pdf
PDF
The-2025-Engineering-Revolution-AI-Quality-and-DevOps-Convergence.pdf
PDF
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
PDF
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
PDF
Early detection and classification of bone marrow changes in lumbar vertebrae...
PDF
Advancing precision in air quality forecasting through machine learning integ...
PDF
NewMind AI Weekly Chronicles – August ’25 Week IV
PPTX
MuleSoft-Compete-Deck for midddleware integrations
PDF
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
PDF
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
PDF
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
PPTX
agenticai-neweraofintelligence-250529192801-1b5e6870.pptx
PDF
Auditboard EB SOX Playbook 2023 edition.
PDF
Convolutional neural network based encoder-decoder for efficient real-time ob...
Internet of Everything -Basic concepts details
Comparative analysis of machine learning models for fake news detection in so...
Dell Pro Micro: Speed customer interactions, patient processing, and learning...
GROUP4NURSINGINFORMATICSREPORT-2 PRESENTATION
giants, standing on the shoulders of - by Daniel Stenberg
Connector Corner: Transform Unstructured Documents with Agentic Automation
EIS-Webinar-Regulated-Industries-2025-08.pdf
The-2025-Engineering-Revolution-AI-Quality-and-DevOps-Convergence.pdf
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
Accessing-Finance-in-Jordan-MENA 2024 2025.pdf
Early detection and classification of bone marrow changes in lumbar vertebrae...
Advancing precision in air quality forecasting through machine learning integ...
NewMind AI Weekly Chronicles – August ’25 Week IV
MuleSoft-Compete-Deck for midddleware integrations
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
agenticai-neweraofintelligence-250529192801-1b5e6870.pptx
Auditboard EB SOX Playbook 2023 edition.
Convolutional neural network based encoder-decoder for efficient real-time ob...

Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013

  • 1. 1 3DS_Document_2013 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Planning Takashi Tanaka
  • 2. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Price for Developing Country Indian Market Vehicle Toyota Etios ① Nissan Datson Honda BRIO ② Suzuki Alto Hyundai Eon Ford Figo Tata Nano ③ $ 8,300 Mobius VW $ 5,000 Tata Nano Bajaj Datson unveil on 2014 Asahi News Paper, DIGITAL 2012, 5, 24 2 Logan $ 2,000 2013, 3, 25 NIKKEI BUSINESS RE60
  • 3. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 3 1 Explanation of Cost Planning 2 To execute Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 4. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Management 4 Development phase (Month) New automobile development -20 Planning -10 Develop, Test 0 Prepare Production Design freeze Accepting phase Product Cost Cost Planning Cost reduction activity Cost management Cost sustaining Cost improve
  • 5. Cost Structure Material Example Material Metal sheet, paint, etc Purchasing Tire, audio, purchasing parts Scrap, Defect Material, defect parts, scrap Production Direct labor Payment, bonus, etc Depreciation, tax, insurance Building, facility, tools Indirect material Tools, oil Purchasing Building, machine repair, maintenance Other personnel expenses Travel, transportation Energy In-direct Labor & others Total Product Cost/ Vehicle 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Detail Electric, air Production engineering Development 5 In-direct Design, development, evaluation & test
  • 6. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Target Setting 6 Sales Price Target Cost -3% Cost Purchasing & Suppliers -30% Cost Planning Current New (Added more new features)
  • 7. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Bad Cost Reduction Activity Added Cost (New feature) VE Low possibility. Unclear results Heavy Work-load VE VE Cost reduction activity VE: Value Engineering Current 7 VE Rough estimation Target Cost
  • 8. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 8 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 9. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Sample Project Background • Design in Japan and US, then production in China • Product reduction target for 50% • OEM expect suggestion to be a long-term partner Development phase: • Planning phase • Using Oobeya for collaborative development 9
  • 10. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Physical Oobeya: Basic Layout 10 Cost Invest
  • 11. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Goal of Digital Cost Planning 11  Reduce the time for DR: 5-days -> 2-hours  Reduction of development lead-time  Improve design quality
  • 12. 12 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012
  • 13. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 13 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 14. Systems Engineering 14 Entire Vehicle System decomposition 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Development Process Requirement Test Function Total System Mecha. Sub-System Electric S/W Evaluation Logical SubSystem Integrate Test Requirement Function Evaluate Logical Functional Mock-up Component Digital Integrate Physical Actual
  • 15. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Digital Design Review 15 Digital mock-up Functional mock-up
  • 16. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Definition of RFLP R Market Expectation Electric L F unction Function ogical Structure P hysical Component • Device • Measures Mechanical Software 16 equirement User’s view • Quantified specification • Parameter • Definition of Input/ Output • Detail design • Plan & Circuit • Architecture • Schema • Collaboration with S/W • 3D Wiring • Tubing • Architecture • Interface • Source code
  • 17. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Decomposition of Sun-roof R equirement Cost Weight unction Safety Light L ogical Frame Internal parts Sun light Handling Glass Shut out ・ ・ ・ Temperature ・ ・ ・ hysical External parts Control light Cool P Drive NVH Open/Close ・ ・ ・ 17 F
  • 18. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 18 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 19. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 By Function- Cost, make Cost Reduction scenario Sun-roof フレーム Frame Current After 20 110 50 20 20 20 100 220 90 10 10 10 10 20 20 Shut out 10 10 10 Temperature 5 5 10 10 $45 $145 Total $400 Total $200 Function 動 Drive Safety 80 ガラス Glass 10 NVH Open/ close 120 Sun light Control light Cost 10 $210 -50% Reduction 19 •Shocked about safety cost • Change design concept • Simulation effectively •Competitor is only $90, Bench marking • Completely new design
  • 20. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Opportunity to Improve 20  Over expectation of Drivability and Quality: Change design concept completely  Barrier of KEIRETSU: New and open relationship with suppliers
  • 21. Scenario of Demo 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 1.Using a carried over RFLP of Sun-roof Function- cost decomposition But +20Kg by using big vehicle’s Overturned by simulation Reduced 50% cost Only +5Kg No problem by simulation 2.New design Function- cost Consider differently Design change Confirm design of sun-roof 21 Reduced 50% cost
  • 22. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Reduction Target: Break down Input in CAD R equirement R1 Common F unction F1 F2 Trade-off 22 ogical L1 L2 R2 R3 L L3 P hysical P1 P2
  • 23. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Reduction -50% 1.Reduced cost using a carried over of sun-roof 23
  • 24. Simulation 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 1.Reduced cost using a carried over of sun-roof Rem: Follow up later items is establish another file, GM checks w eekly. Engine Related Face Final Order Design Check Sheet Eng Type Factory Car Type Distribute Other Route: Design room -> Manager ->each CE 2- copy for group Parts# Name Other G Depart R Outside design request #: Design change #: Requested section Document, Memo Cost CE agree Weight GM Leader Establish Order Final M Planning Estimated M D min M D min M D min Inspect drawing Y-N Y-N Y-N Final audit of draw ing 1. No problem   Cost Planning Change drawing $ (+ - Outside design Recognized draw g   Outside %)  ( ) (+ - %) Background, Objective Others Count   Research Check   VA, VE with leader 2. No confirmation, but no problem 3. There is issue, but go   What is issue?   Change spec   Commonalization    Reduce weight Durability, Reliability check Item D   Purchase, Fin Drawing   Performance    Productivity   Solution of Issue    Service efficiency    Others If it needed, distribute to production engineering of each factory Continue hi-speed Full throttle U/D Low sw eep U/D Total pattern Total temperature Low temperature Ex main temp. Long drive Hammering Stresses Resonance Dirt course Hi-speed reliability Heat test Body test CAE Stress Explain: Contents of change, Problems by GM Attachment Planning figure Engineering check sheet Required specification Objective, reason by GM   Performance   Solution of Issue   NV improve   contact issue   Others (   Request from others (CE, Production)   Commonalization   Service efficiency   Cost reduction  SOC problem   Others(        ) )   Reduce weight Cost Contents of change 1.SOP phase 2.Target cost 3.Current 4.Supplier estimate 5.Gap Anxious by change Countermeasure Reflect for test (Left table) Reflect to production 6.Countermeasure Prototype 1.Parts cost 2.Mold 3.Total Weight 1.SOP phase 2.Target cost 3.Current 4.Supplier estimate If necessary internally, Copy  N 5.Gap Later Recognized draw ing OR Follow up ( Y - N ) Check grade Plan ( / ) Plan ( / M D M Item D ) 6.Countermeasure M Check D M D Item Check Engineer 1 2GY   1 No issue : ++   Regulation check require ( Y - N) Conf irm with Material dep: rubber, plastic, paint No guessing issue : + Acceptance f or F/R, F/F General name of material(                  ) Guessing issue : - Parts list of OBD(On-board diagnosis) Assembly and serv ice(Line tools, serv ice manual) No countermeasure: -Not accept:   Saf ety issue (FH, Crash, OR, Leak) Blank Conf irmation Engineering check sheet Row material, process with prod. Eng & supplier Conf irm guideline of parts f itting (Internal E2-14) Including all PPC items     Drawing: parts table, request, label The case of - and --, Satisf ied required f unctions by reliability matrix     Change Drawing: old parts, ov ersea, Write f ollow up date Keep dev elopment target by justif ication check sheet     Parts table: Saf ety , regulation, maker option Conf irmed by control design inf ormation matrix     Pattent:requested (Y N), Fall f ault (Y N Analy ) Implement DRBFM Deliv ery location, change( Prohibited design change, conf irmed by real parts   Conf lict of parts, distance, slack, f astened, seal ) Env ironmental condition & inf luence   Oil, water & gas temperature, f rozen, f uel, etc       Caulking, weld, press, insert choking Information Leader comments: Roll out other model(Y N), Influence other organization(Y N), informed(Y N): Total 24 (Revised '05 June) #1: Each engine & using area has template #2: Attach engineering check sheet   Check sub-design check sheet of back side
  • 25. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Design Change 2.Change design concept completely, using a new design and reduced cost L Safety 80 Frame Total 10 20 110 20 100 220 NVH Open/Close 120 Sun light 10 Control Light 10 10 Tempere. 5 $210 10 10 導風開口面積と最大高さh Shut out Total 25 Drive Glass 20 F $45 75cm2 :80mm 100cm2 :130mm 125cm2:150mm 20 10 5 10 $145 $400
  • 26. Simulation after design change 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 2.Change design concept completely, using a new design and reduced cost サプライチェーンの見直しによる原価低減20% 26
  • 27. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Expecting Target 27 Quality  A bit higher price level Target Price  Accomplish quality target -Systems Engineering to reduce cost -Using simulation effectively -Quality into Process
  • 28. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Summary 28  Cost Planning to reduce product cost of >30%  Change working behavior and habit  Global and collaborative activity  Functional design to reduce cost 50%
  • 29. 29 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012