Repair Floor Strip Room Rough in Plumbing &Electrical Repair Wall & Ceiling
Fume Hood Base Cabinet Chemical Sink Vinyl Flooring Walls Electrical Plumbing
 
 
 
 
Total float: Can change the successor activity times & bring new critical path Free Float: Can delay without any problem. No change in successor activities. Independent Float: Can delay  even if the previous activities are late
FLOATS :  Flexibility in delaying an activity 0
Critical Path In  project management , a  critical path  is the sequence of  project network  activities with the longest overall  duration , determining the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date (i.e. there is no  float  on the critical path)..
Critical Path A project can have several, parallel critical paths. An additional parallel path through the network with the total durations shorter than the critical path is called a  sub-critical or non-critical path and the activities are non-critical activities. If the float of activity is negaive: supercritcial activites; need more resources, Special attention. Originally, the critical path method considered only logical  dependencies  among terminal elements. Since then, it has been expanded to allow for the inclusion of resources related to each activity
Update CPM Diagram As the project progresses, the actual task completion times will be known and the network diagram can be updated to include this information. A new critical path may emerge, and structural changes may be made in the network if project requirements change.
Time Crashing Normally project is planned for the completion period of the network.  Increasing the duration of the project increase project costs. But, under some circumstances, may compel to reduce the completion time: To avoid delay which attract heavy penalty or loss of goodwill. To venture on another project To earn bonus for early completion, if found feasible. To transfer the resources needed elsewhere.
Project Cost Components
Direct & Indirect Costs Direct cost : For Accomplishing the work Indirect Cost : Related to control & direction of work, financial overheads, lost production, insurance claims
Direct project Cost
Variation of Cost with Time
Indirect Cost Only considering overheads and supervision
Indirect Cost If there is loss in profits Penalty due to delay OUTAGE LOSS
Indirect Cost (Overhead + Outage Loss)
Total Project Cost
CPM Cost Model In CPM- Time is related to cost ---- Therefore objective is to develop optimum time-cost relationship. The project duration can be reduced by reducing the duration of critical activities. By deploying more resources By relaxing the technical specifications
Cost Variation with Time
Normal & Crash Estimates Normal Estimate: Emphasis is on  cost  with time being associated with minimum cost. Crash Estimate: Absolute minimum  time  required for the job and the cost necessary to achieve it.
Cost –Time Curve Normal Time (t n ): Normal time is the standard time that an estimator would usually allow for an activity. Crash Time (t c ): Minimum possible time in which an activity can be completed by deploying extra resources. Normal Cost (C n ): This is the direct cost required to complete the activity in normal time duration Crash Cost (C c ) : This is the direct cost corresponding to the completion of the activity within crash time.
Generalized  direct  cost-time curve
Direct  Cost Curve
Total Project Cost & Optimum Duration Total Cost Curve Linear Approximation
Cost Slope The slope of each cost versus time trade-off for each activity as follows:
Time-Cost Model Assumptions The time-cost model described above relies on the following assumptions: The normal cost for an activity is lower than the crash cost.  There is a linear relationship between activity time and cost.  The resources are available to shorten the activity.
Project Crashing The activities having the lowest cost per unit of time reduction should be shortened first. In this way, one can step through the critical path activities and create a graph of the total project cost versus the project time.
Project Crashing Attention should be given to the critical path to make sure that it remains the critical path after the activity time is reduced. If a new critical path emerges, it must considered in subsequent time reductions. To minimize the cost, those activities that are not on the critical path can be extended to minimize their costs without increasing the project completion time.
Project Overhead costs are @ Rs  300/day Determine: Direct Cost-duration relationship Total cost –duration relationship and corresponding least cost plan Activity Normal Duration (Days) Normal Cost (Rs. ) Crash Duration (Days) Crash Cost (Rs.) 1-2 9 8000 6 9500 2-3 5 5000 3 5500 1 2 3 9 (6) 5 (3)
1. Find out the cost slope for each activity ? 2. Find out Normal Duration Direct Cost ?
3. Crash the activity with least cost slope ? 4. Find out the extra cost of crashing ? 5. Add to the normal direct cost of the project
6. Crash another activity ? 7. Find out the extra cost of crashing ? 8. Add to the normal direct cost of the project ?
 
 
 
Critical Path
Normal Duration & Direct Cost
Cost Slope
First Stage crashing: Critical Activity with minimum cost -slope Not 3 weeks: (The path should remain critical)
Second-Stage crashing 2-3, 2-4 or 2-4, 3-4. minimum cost slope Simultaneously
Third Stage of Crashing: Activity 2-4 & 3-4
Fourth Stage of Crashing
33000
 
 
 

More Related Content

PPTX
Construction Management
PPT
Time cost optimisation
DOCX
Free float and total float - PMP/CAPM from PMI
PPSX
PPTX
Per tand project crashing
PDF
Difference between PERT and CPM
PPTX
Critical Path Method
ODP
Critical path method
Construction Management
Time cost optimisation
Free float and total float - PMP/CAPM from PMI
Per tand project crashing
Difference between PERT and CPM
Critical Path Method
Critical path method

What's hot (19)

PDF
Float in Projects
PDF
Critical Path Method
PPTX
PPTX
Critical Path Method/ Program Evaluation and Review Technique
PPTX
Critical path method
PDF
CPM-Updating
PPTX
Critical path method
PPTX
Pert cpm
PDF
Unit.6. network analysis with cpm and pert
PDF
Critical path method(cpm)
PDF
Lect-6&7: Network Diagrams, PERT and CPM
PDF
Cpm (critical path method)
PPT
Critical Path Analysis
PPT
Comparative characteristics of pert and cpm
PPTX
CPM - Critical Path Method
PPTX
Critical path method
PPT
06 pert cpm
PPTX
CPM - Critical Path Method
Float in Projects
Critical Path Method
Critical Path Method/ Program Evaluation and Review Technique
Critical path method
CPM-Updating
Critical path method
Pert cpm
Unit.6. network analysis with cpm and pert
Critical path method(cpm)
Lect-6&7: Network Diagrams, PERT and CPM
Cpm (critical path method)
Critical Path Analysis
Comparative characteristics of pert and cpm
CPM - Critical Path Method
Critical path method
06 pert cpm
CPM - Critical Path Method
Ad

Viewers also liked (9)

PDF
Solo Containment:May 2014 projects
PDF
Clean air-systems
PDF
Erlab Captair Seminar
PDF
Laboratory project/Laboratory furniture
DOCX
Working under the fume hood
PDF
Shape Memory Alloy Actuated Peristaltic Pump for Use in Microgravity
PDF
IRIS Radiopharmaceutical Injector | Comecer
PDF
Labscape Fume Hood Catalog
PDF
Firetrace Fume Hood Fire Protection
Solo Containment:May 2014 projects
Clean air-systems
Erlab Captair Seminar
Laboratory project/Laboratory furniture
Working under the fume hood
Shape Memory Alloy Actuated Peristaltic Pump for Use in Microgravity
IRIS Radiopharmaceutical Injector | Comecer
Labscape Fume Hood Catalog
Firetrace Fume Hood Fire Protection
Ad

Similar to vk1 (20)

PDF
time cost trade off
PPTX
LANQUIN-SIBAYAN-REPORT-ACME.pptx........
PPTX
Pert, cpm & gert
PDF
Unit 3-Analysis.pdf DOOBY DADA DOLI MAYAA
PPT
1.7 Project Management basics and techniques.ppt
PDF
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
PPTX
CPM AND PERT(critical path method) .pptx
PPT
Chapter 12(cpm pert)
PPT
A760535773_16727_28_2018_u6.ppt
PDF
Cpm n pert
PPSX
Critical path method & pert
PDF
Time-Cost Trade Off in the construction industry
PPTX
CONSTRUCTION MANAGEMENT CRITICAL PATH CPM & PERT- PWD.pptx
PPTX
Chapter 3.pptx
PPT
49091291-PERT and CPM topic of industrial .ppt
PPTX
Final Review
PPT
Project : formulation,evaluation and monitoring
PDF
pert and crm examples full class course.pdf
PPS
Critical Chain Project Management
PDF
05 Project Monitoring & Cost Control
time cost trade off
LANQUIN-SIBAYAN-REPORT-ACME.pptx........
Pert, cpm & gert
Unit 3-Analysis.pdf DOOBY DADA DOLI MAYAA
1.7 Project Management basics and techniques.ppt
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
CPM AND PERT(critical path method) .pptx
Chapter 12(cpm pert)
A760535773_16727_28_2018_u6.ppt
Cpm n pert
Critical path method & pert
Time-Cost Trade Off in the construction industry
CONSTRUCTION MANAGEMENT CRITICAL PATH CPM & PERT- PWD.pptx
Chapter 3.pptx
49091291-PERT and CPM topic of industrial .ppt
Final Review
Project : formulation,evaluation and monitoring
pert and crm examples full class course.pdf
Critical Chain Project Management
05 Project Monitoring & Cost Control

vk1

  • 1. Repair Floor Strip Room Rough in Plumbing &Electrical Repair Wall & Ceiling
  • 2. Fume Hood Base Cabinet Chemical Sink Vinyl Flooring Walls Electrical Plumbing
  • 3.  
  • 4.  
  • 5.  
  • 6.  
  • 7. Total float: Can change the successor activity times & bring new critical path Free Float: Can delay without any problem. No change in successor activities. Independent Float: Can delay even if the previous activities are late
  • 8. FLOATS : Flexibility in delaying an activity 0
  • 9. Critical Path In project management , a critical path is the sequence of project network activities with the longest overall duration , determining the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date (i.e. there is no float on the critical path)..
  • 10. Critical Path A project can have several, parallel critical paths. An additional parallel path through the network with the total durations shorter than the critical path is called a sub-critical or non-critical path and the activities are non-critical activities. If the float of activity is negaive: supercritcial activites; need more resources, Special attention. Originally, the critical path method considered only logical dependencies among terminal elements. Since then, it has been expanded to allow for the inclusion of resources related to each activity
  • 11. Update CPM Diagram As the project progresses, the actual task completion times will be known and the network diagram can be updated to include this information. A new critical path may emerge, and structural changes may be made in the network if project requirements change.
  • 12. Time Crashing Normally project is planned for the completion period of the network. Increasing the duration of the project increase project costs. But, under some circumstances, may compel to reduce the completion time: To avoid delay which attract heavy penalty or loss of goodwill. To venture on another project To earn bonus for early completion, if found feasible. To transfer the resources needed elsewhere.
  • 14. Direct & Indirect Costs Direct cost : For Accomplishing the work Indirect Cost : Related to control & direction of work, financial overheads, lost production, insurance claims
  • 16. Variation of Cost with Time
  • 17. Indirect Cost Only considering overheads and supervision
  • 18. Indirect Cost If there is loss in profits Penalty due to delay OUTAGE LOSS
  • 19. Indirect Cost (Overhead + Outage Loss)
  • 21. CPM Cost Model In CPM- Time is related to cost ---- Therefore objective is to develop optimum time-cost relationship. The project duration can be reduced by reducing the duration of critical activities. By deploying more resources By relaxing the technical specifications
  • 23. Normal & Crash Estimates Normal Estimate: Emphasis is on cost with time being associated with minimum cost. Crash Estimate: Absolute minimum time required for the job and the cost necessary to achieve it.
  • 24. Cost –Time Curve Normal Time (t n ): Normal time is the standard time that an estimator would usually allow for an activity. Crash Time (t c ): Minimum possible time in which an activity can be completed by deploying extra resources. Normal Cost (C n ): This is the direct cost required to complete the activity in normal time duration Crash Cost (C c ) : This is the direct cost corresponding to the completion of the activity within crash time.
  • 25. Generalized direct cost-time curve
  • 26. Direct Cost Curve
  • 27. Total Project Cost & Optimum Duration Total Cost Curve Linear Approximation
  • 28. Cost Slope The slope of each cost versus time trade-off for each activity as follows:
  • 29. Time-Cost Model Assumptions The time-cost model described above relies on the following assumptions: The normal cost for an activity is lower than the crash cost. There is a linear relationship between activity time and cost. The resources are available to shorten the activity.
  • 30. Project Crashing The activities having the lowest cost per unit of time reduction should be shortened first. In this way, one can step through the critical path activities and create a graph of the total project cost versus the project time.
  • 31. Project Crashing Attention should be given to the critical path to make sure that it remains the critical path after the activity time is reduced. If a new critical path emerges, it must considered in subsequent time reductions. To minimize the cost, those activities that are not on the critical path can be extended to minimize their costs without increasing the project completion time.
  • 32. Project Overhead costs are @ Rs 300/day Determine: Direct Cost-duration relationship Total cost –duration relationship and corresponding least cost plan Activity Normal Duration (Days) Normal Cost (Rs. ) Crash Duration (Days) Crash Cost (Rs.) 1-2 9 8000 6 9500 2-3 5 5000 3 5500 1 2 3 9 (6) 5 (3)
  • 33. 1. Find out the cost slope for each activity ? 2. Find out Normal Duration Direct Cost ?
  • 34. 3. Crash the activity with least cost slope ? 4. Find out the extra cost of crashing ? 5. Add to the normal direct cost of the project
  • 35. 6. Crash another activity ? 7. Find out the extra cost of crashing ? 8. Add to the normal direct cost of the project ?
  • 36.  
  • 37.  
  • 38.  
  • 40. Normal Duration & Direct Cost
  • 42. First Stage crashing: Critical Activity with minimum cost -slope Not 3 weeks: (The path should remain critical)
  • 43. Second-Stage crashing 2-3, 2-4 or 2-4, 3-4. minimum cost slope Simultaneously
  • 44. Third Stage of Crashing: Activity 2-4 & 3-4
  • 45. Fourth Stage of Crashing
  • 46. 33000
  • 47.  
  • 48.  
  • 49.