Material Requirement
Planning (MRP-1)
Course Outline
• Introduction to planning
* Capacity * Aggregate * Master
Production schedule and * Material
requirement planning
• MRP
* Objectives, * functions, * basic terminologies, * MRP
inputs, *MRP working, * MRP outputs, *benefits, and *drawbacks
• Conclusion
Introduction
• In organizations, planning is a management process,
concerned with defining goals for company's future direction
in achieving defined targets.
• Production planning is the planning of production and
manufacturing modules in a company or industry.
• It utilizes the resource allocation activities such as employees,
materials and production capacity, in order to serve different
customers.
• Based on time horizons, planning can be made in three ways,
* Capacity Planning (Long term planning)
* Aggregate Planning (Intermediate term planning)
* Master Production Scheduling (MPS) & Material
requirement planning (short term planning)
Capacity Planning
• First step before setting up any organization deciding to
produce new product or existing product or altogether.
• It includes,
* Planning for plant location, machineries and human
resources.
* Strategies for facility expansion, facility alterations & major
subcontract plans.
• These decisions normally taken by top management.
• Decisions can be made based on analysing economic,
technological and other competitive variables, viz., Break even
analysis and forecasting etc.,
Aggregate Planning
• It involves planning the best quantity to produce during time
periods/process of determining output levels in the
intermediate range horizon [next 6 to 18 months].
• Usually planning made based on demand forecasting.
• It includes,
* Employment plan
* Major machinery and process plan
* Machinery and utility plan
* Aggregate inventory plans
• These planning's are also known as tactical planning.
• It facilitates full loaded facilities and minimizes overloading
and under-loading
• Enhances amount of resources in times of scarce production
Market
environment Resource base &
Technology
Forecast &
customer order
Capacity (facilities,
material, labour
and capital)
Aggregate
production plan
Capacity
requirements
Master production
schedule (MPS)
Material
requirements
Long range (1-15 years) major
capacity additions, product and
process decisions.
Intermediate range (6-18
months) workforce, overtime
plans, inventory &
subcontracting levels, minor
capacity changes.
Short range (up to 6 months)
detailed scheduling,
routings, alternate work
centres, overtime etc.,
Fig: Flow chart of Aggregate plan and Master Production Schedule
Master Production Schedule (MPS)
• MPS sets the quantity of each end item (finished product) to
be completed in each time period of the short range planning
horizon.
• It developed by reviewing market forecasts, customer orders,
inventory levels, facility loading and capacity information
regularly.
• Main objective of MPS is to schedule end items to be
completed
• Functions of MPS;
* Dis-aggregating aggregate plans into specific end items.
* Evaluating alternative schedules.
* Generating material requirements
* Generating capacity requirements.
* Utilizing capacity effectively
Example
Week
Product
September
1 2 3 4
Product P6 70 100
Product P8 40 80 60
MPS for products P6 & P8
Week wise requirement of both P6 & P8 to generate end products could be;
First week: Product P8= 40 units
Second week: Product P6=70 units
Third week: Product P8= 80 units
Fourth week: Product P6= 100 units & Product P8= 60 units.
Material requirements planning
• For a manufacturing company to produce end items to meet
demands, the availability of sufficient production capacity must
be coordinated with,
* the availability of raw materials and
* purchased items from which, the end items to be produced
• There is a need to manage the availability of dependent demand
items.
• The technique to manage dependent demand items required to
produce end products as per the production schedule is known as
MRP.
• MRP is the scientific technique for planning the quantity to
be ordered, usage of materials at various levels of production
& for monitoring the stocks during these transactions.
• MRP includes activities of both inventory control and scheduling
techniques.
Objectives of MRP
• To improve customer service by meeting delivery schedule
promised & shortening delivery lead times.
• To reduce inventory costs by reducing inventory levels.
• To improve plant operating efficiency by better use of
production resources.
Functions of MRP
• Based on a Master production schedule, a material
requirements planning system:
* Creates schedules identifying the specific parts and materials
required to produce end items.
* Determines exact unit numbers needed.
* Determines the dates when orders for those materials should
be released, based on lead times.
Basic terminologies associated with MRP
• Independent demand item: It is a finished product demand,
whose demand occurs separately of demand for any other
item.
• Dependent demand item: Demand for an item that can be
linked to the demand for other item.
• Available inventory: Materials that are held in inventory or
which are on order, but are not either safety stock or allocated
to other uses.
• Allocated inventory: Materials that are held in inventory or
on order but which have been allocated to specific production
orders in the future.
• On hand inventory: The quantity of material, physically held
in inventory at a point of time. It may include safety stock and
allocated inventory except material on order.
Basic terminologies associated with MRP
••
• Bill of materials (BOM) file: It provides a list indicating the
all raw materials, parts, sub assemblies, and major assemblies
in units that go into an end product.
* It gives details of the build up of a product.
* It may also be called as indented parts list
* BOM file can be revised every time if there is a change in
product design or specification.
• A bill of materials may contain the following information:
product code, description of the product; mechanical
characteristics of the product; vendor's name; size,
length, weight or other required physical characteristic of
the product; test results (shrinkage, lead, etc);
estimated/actual yield (allocation, quantity used); and
further processing required (sponging, dyeing, enzyme
bath, etc).
BOM
Product P8
Subassembly
1
Subassembly
2
X Y
Y
ZY
MRP Inputs
Customer
order Sales forecast
Master
production
schedule (MPS)
Engineering
changes
Bill of
Materials
(BOM)
Inventory
status file
MRP
System
Service parts
requirements
Inventory status file
• It provides a computerized record of each material physically
held in the system.
• There will be only one inventory status for individual material,
even if it is used at different levels of production or in different
end products.
• The file indicates,
* Material code
* Material name
* Inventory-on-hand (physically available)
* Inventory on order (ordered but yet to arrive)
* Customer order for item
• The file also contains information such as
* Lot size *Lead times * Safety stock level *Scrap-rate
Lead time in MRP
• In MRP, lead times are used to determine starting dates for
assembling final products and subassemblies, for producing
component parts & for ordering raw materials.
• Types:
* Ordering lead time: Time gap b/w start of purchasing process
to receipt from suppliers.
* Manufacturing lead time: Processing of part through the
machines specified on route sheet.
Order raw
material
Start of
production Place order for
subassembly 1
Subassembly 1
needed
Final
Product
1 2 3 4 5 6 7
offsetting
Independent and Dependent demand
A
B (4)
D (2) E (1)
C (2)
D (3) F (2)
Independent
Demand (end
item)
Dependent
demand
(components)
Independent v/s Dependent demand
• Independent Demand:
 Demand unrelated to demand of other products (ex: end
products/finished goods).
 Usually forecast.
 Conventional inventory control (EOQ) applicable.
• Dependent Demand:
 Demand directly related to demand of some other product (ex:
components, raw materials, subassemblies)
 Requirements derived from delivery schedule of end items.
 MRP is the appropriate tool for planning & control of
manufacture inventories.
Working of MRP
• Bucketing: At what time and in what quantity a product is
needed. MRP starts with consolidating period requirements for
different end products. These time periods are known as
“buckets”.
• Add service (spare) parts, which are not included in MPS.
• Part explosion- Each item exploded (divided) into constituent
materials.
• Offsetting: Displacing requirement by a product equal to the
lead time of the product.
• Aggregation: Find gross requirement for each component or
raw material.
• Netting: Involves modification of aggregated (gross) requirement.
+ Scheduled receipts]
• Procurement schedule: the requirement is now advanced by a lead-time for final assembly. Pertains to production process lead-time.
To expect the MRP run to schedule the procurement proposals correctly, we have to maintain the following in the master data's properly:
a) In-house production times (for in house manufacturing, maintained in the material master MRP 2 view as lot independent and as lot dependent in the work scheduling view),
b) Planned delivery times (for external procurement, maintained in the material master),
c) Interoperation times (optional for in house production, maintained in the material master or Task lists such as routing or recipes),
d) Planned goods receipt times (optional for external and internal procurement)
e) Set up times and tear down times (optional for in house production, maintained in the material master Work Scheduling view or in the task list such as routing or recipes)
• Lot sizing: this is used to consolidate the requirements in pre-specified lot sizes, so the economic order quantity may be ordered.
•
MRP Outputs
MRP
Order release
requirements (orders
to be released now)
Order Rescheduling
(expedite, de-expedite,
open orders)
Planned orders
(future)
• Order releases: Based on MPS report, inventory status and product
structure, MRP releases orders to procure items in tune with the due
date requirements at every level.
*Purchase orders (PO) sent to purchase department to
procure items from outside.
*Shop orders are released to produce/procure items from in
house workshops.
• Order rescheduling: Due to arise of alterations in production
schedules, few orders need to be expedite/few more get cancelled. MRP
package accommodate all such changes and gives reschedule for all
further orders.
• Planned orders release: The quantity of an item that is planned to be
ordered and planned time period for releasing this order, so that, the
item will be received when needed.
Benefits of MRP
• Understanding the effect of changes in future periods.
• Triggers a process to improve BOM, to guarantee reliable
inventory records and better management.
• Improved customer service.
• Reduction in lead time.
• Increase in productivity.
• Reduce purchasing cost.
• Improve production and supply schedules.
• Reduce manufacturing cost.
• Less scrap and rework.
• Higher production quality.
Drawbacks of MRP
• Incorrectness in suppliers’ lead time: MRP depends heavily on
correctness of lead time data.
• Incorrectness in inventory data: miscounting, unaccounted
scrap, items lost in transit etc.,
• Inaccurate manufacturing lead time: change in customers’
demand, change in workload of factory.
• Inaccuracies in BOM structure: change in design, component
substitution without recording.
Conclusion
• MRP is a…..
* Computerized inventory control
* Production planning system
that……..
* Schedules component items as needed
Which will……
* Track inventory and
* Help a company in many other aspects of business

More Related Content

PPT
Material Resource Planning
PPTX
Material Requirement Planning (mrp)
PPTX
MRP I and MRP II
PPTX
PPT
material requirement planning
PDF
What is master production schedule
PPT
Capacity Requirement Planning
PPT
Production Planning and Control
Material Resource Planning
Material Requirement Planning (mrp)
MRP I and MRP II
material requirement planning
What is master production schedule
Capacity Requirement Planning
Production Planning and Control

What's hot (20)

PPTX
Coding in material management
PPT
PPTX
manufacturing resource planning
PPTX
Material requirement planning, MRP.
PPT
Material Requirement Planning (MRP)
PPTX
MRP CASE STUDY
PPT
Supply Chain Integration
PPTX
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
PPTX
Production Planning and Control (Operations Management)
PPTX
Routing and scheduling
PPTX
Inventory management
 
PPTX
Inventory planning & control
PPTX
Manufacturing Resource Planning | Management
PPT
Work study - production and operations management
PPT
Plant layout
PPT
Work Study- Methods Study
PPT
production management, objectives ,PPC and its functions ,types of production...
PPTX
Production planning, routing, scheduling, Activating, Monitoring
PPTX
production planning and control
PPTX
Production Planning & Control
Coding in material management
manufacturing resource planning
Material requirement planning, MRP.
Material Requirement Planning (MRP)
MRP CASE STUDY
Supply Chain Integration
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
Production Planning and Control (Operations Management)
Routing and scheduling
Inventory management
 
Inventory planning & control
Manufacturing Resource Planning | Management
Work study - production and operations management
Plant layout
Work Study- Methods Study
production management, objectives ,PPC and its functions ,types of production...
Production planning, routing, scheduling, Activating, Monitoring
production planning and control
Production Planning & Control
Ad

Similar to Material requirement planning (mrp) (20)

PPTX
Module 3 - Aggregate Planning Tacticts2.pptx
PPTX
Erp chapter 3
PDF
Mrp systems & scheduling
PDF
MRP & ERP.pdf
PPTX
Production and operations management (POM)
PDF
Production planning and control - Basic concepts
PPTX
Presentation2 mrp
PPTX
PDF
Chapter-3-Operation management.pdf2024hahahaha
PPTX
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
PPTX
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
PPTX
AGGREGATE PLANNING AND MRP.pptx
PPT
SAP MM PP Material requirement planning
PPTX
7th Material Requirements Planning and ERP
PPT
Lect 6.ppt
PPTX
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
DOCX
Material Requirements planning system 01Page to 04 Page
PPTX
Material Requirement planning (factors,inputs,outputs,benifits)
PPTX
Production Planning And Control
PDF
Production planning and Control, Sale's forecasting
Module 3 - Aggregate Planning Tacticts2.pptx
Erp chapter 3
Mrp systems & scheduling
MRP & ERP.pdf
Production and operations management (POM)
Production planning and control - Basic concepts
Presentation2 mrp
Chapter-3-Operation management.pdf2024hahahaha
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
AGGREGATE PLANNING AND MRP.pptx
SAP MM PP Material requirement planning
7th Material Requirements Planning and ERP
Lect 6.ppt
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
Material Requirements planning system 01Page to 04 Page
Material Requirement planning (factors,inputs,outputs,benifits)
Production Planning And Control
Production planning and Control, Sale's forecasting
Ad

More from Somashekar S.M (20)

PPTX
Teamcenter AWS Login Background image customization
PDF
Operations Management VTU BE Mechanical 2015 Solved paper
PPTX
NX_CAM_Sales_Enablement.pptx
DOCX
Sheet metal design in Solid Edge.docx
PPTX
Digital Factory setup
PDF
Capital software installation procedure
DOCX
Inspire cast quiz
PDF
Operations management notes
PPTX
Understanding stakeholders
PPTX
Communications needs of global and virtual project teams
PPTX
Scope definition
PPTX
Preparing cost estimation
PPTX
Communication planning
PPTX
Hydraulic actuators and motors
PDF
project management
PPTX
Entrepreneurship
PDF
purchasing and contracting for projects
PDF
Project Planning and Estimation
PDF
Decision making
PDF
Scheduling coordination and control of projects
Teamcenter AWS Login Background image customization
Operations Management VTU BE Mechanical 2015 Solved paper
NX_CAM_Sales_Enablement.pptx
Sheet metal design in Solid Edge.docx
Digital Factory setup
Capital software installation procedure
Inspire cast quiz
Operations management notes
Understanding stakeholders
Communications needs of global and virtual project teams
Scope definition
Preparing cost estimation
Communication planning
Hydraulic actuators and motors
project management
Entrepreneurship
purchasing and contracting for projects
Project Planning and Estimation
Decision making
Scheduling coordination and control of projects

Recently uploaded (20)

PPTX
CNS - Unit 1 (Introduction To Computer Networks) - PPT (2).pptx
PPTX
BBOC407 BIOLOGY FOR ENGINEERS (CS) - MODULE 1 PART 1.pptx
PPTX
AI-Reporting for Emerging Technologies(BS Computer Engineering)
PPTX
CS6006 - CLOUD COMPUTING - Module - 1.pptx
PPTX
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
PPTX
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
PPTX
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
PPTX
Design ,Art Across Digital Realities and eXtended Reality
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PDF
AIGA 012_04 Cleaning of equipment for oxygen service_reformat Jan 12.pdf
PPT
UNIT-I Machine Learning Essentials for 2nd years
PPTX
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
PPTX
Solar energy pdf of gitam songa hemant k
PDF
Research on ultrasonic sensor for TTU.pdf
PPTX
Quality engineering part 1 for engineering undergraduates
PDF
LS-6-Digital-Literacy (1) K12 CURRICULUM .pdf
PPTX
Software-Development-Life-Cycle-SDLC.pptx
PDF
Principles of operation, construction, theory, advantages and disadvantages, ...
PDF
Cryptography and Network Security-Module-I.pdf
PDF
Project_Mgmt_Institute_-Marc Marc Marc .pdf
CNS - Unit 1 (Introduction To Computer Networks) - PPT (2).pptx
BBOC407 BIOLOGY FOR ENGINEERS (CS) - MODULE 1 PART 1.pptx
AI-Reporting for Emerging Technologies(BS Computer Engineering)
CS6006 - CLOUD COMPUTING - Module - 1.pptx
WN UNIT-II CH4_MKaruna_BapatlaEngineeringCollege.pptx
Module1.pptxrjkeieuekwkwoowkemehehehrjrjrj
SE unit 1.pptx aaahshdhajdviwhsiehebeiwheiebeiev
Design ,Art Across Digital Realities and eXtended Reality
Beginners-Guide-to-Artificial-Intelligence.pdf
AIGA 012_04 Cleaning of equipment for oxygen service_reformat Jan 12.pdf
UNIT-I Machine Learning Essentials for 2nd years
DATA STRCUTURE LABORATORY -BCSL305(PRG1)
Solar energy pdf of gitam songa hemant k
Research on ultrasonic sensor for TTU.pdf
Quality engineering part 1 for engineering undergraduates
LS-6-Digital-Literacy (1) K12 CURRICULUM .pdf
Software-Development-Life-Cycle-SDLC.pptx
Principles of operation, construction, theory, advantages and disadvantages, ...
Cryptography and Network Security-Module-I.pdf
Project_Mgmt_Institute_-Marc Marc Marc .pdf

Material requirement planning (mrp)

  • 2. Course Outline • Introduction to planning * Capacity * Aggregate * Master Production schedule and * Material requirement planning • MRP * Objectives, * functions, * basic terminologies, * MRP inputs, *MRP working, * MRP outputs, *benefits, and *drawbacks • Conclusion
  • 3. Introduction • In organizations, planning is a management process, concerned with defining goals for company's future direction in achieving defined targets. • Production planning is the planning of production and manufacturing modules in a company or industry. • It utilizes the resource allocation activities such as employees, materials and production capacity, in order to serve different customers. • Based on time horizons, planning can be made in three ways, * Capacity Planning (Long term planning) * Aggregate Planning (Intermediate term planning) * Master Production Scheduling (MPS) & Material requirement planning (short term planning)
  • 4. Capacity Planning • First step before setting up any organization deciding to produce new product or existing product or altogether. • It includes, * Planning for plant location, machineries and human resources. * Strategies for facility expansion, facility alterations & major subcontract plans. • These decisions normally taken by top management. • Decisions can be made based on analysing economic, technological and other competitive variables, viz., Break even analysis and forecasting etc.,
  • 5. Aggregate Planning • It involves planning the best quantity to produce during time periods/process of determining output levels in the intermediate range horizon [next 6 to 18 months]. • Usually planning made based on demand forecasting. • It includes, * Employment plan * Major machinery and process plan * Machinery and utility plan * Aggregate inventory plans • These planning's are also known as tactical planning. • It facilitates full loaded facilities and minimizes overloading and under-loading • Enhances amount of resources in times of scarce production
  • 6. Market environment Resource base & Technology Forecast & customer order Capacity (facilities, material, labour and capital) Aggregate production plan Capacity requirements Master production schedule (MPS) Material requirements Long range (1-15 years) major capacity additions, product and process decisions. Intermediate range (6-18 months) workforce, overtime plans, inventory & subcontracting levels, minor capacity changes. Short range (up to 6 months) detailed scheduling, routings, alternate work centres, overtime etc., Fig: Flow chart of Aggregate plan and Master Production Schedule
  • 7. Master Production Schedule (MPS) • MPS sets the quantity of each end item (finished product) to be completed in each time period of the short range planning horizon. • It developed by reviewing market forecasts, customer orders, inventory levels, facility loading and capacity information regularly. • Main objective of MPS is to schedule end items to be completed • Functions of MPS; * Dis-aggregating aggregate plans into specific end items. * Evaluating alternative schedules. * Generating material requirements * Generating capacity requirements. * Utilizing capacity effectively
  • 8. Example Week Product September 1 2 3 4 Product P6 70 100 Product P8 40 80 60 MPS for products P6 & P8 Week wise requirement of both P6 & P8 to generate end products could be; First week: Product P8= 40 units Second week: Product P6=70 units Third week: Product P8= 80 units Fourth week: Product P6= 100 units & Product P8= 60 units.
  • 9. Material requirements planning • For a manufacturing company to produce end items to meet demands, the availability of sufficient production capacity must be coordinated with, * the availability of raw materials and * purchased items from which, the end items to be produced • There is a need to manage the availability of dependent demand items. • The technique to manage dependent demand items required to produce end products as per the production schedule is known as MRP. • MRP is the scientific technique for planning the quantity to be ordered, usage of materials at various levels of production & for monitoring the stocks during these transactions. • MRP includes activities of both inventory control and scheduling techniques.
  • 10. Objectives of MRP • To improve customer service by meeting delivery schedule promised & shortening delivery lead times. • To reduce inventory costs by reducing inventory levels. • To improve plant operating efficiency by better use of production resources.
  • 11. Functions of MRP • Based on a Master production schedule, a material requirements planning system: * Creates schedules identifying the specific parts and materials required to produce end items. * Determines exact unit numbers needed. * Determines the dates when orders for those materials should be released, based on lead times.
  • 12. Basic terminologies associated with MRP • Independent demand item: It is a finished product demand, whose demand occurs separately of demand for any other item. • Dependent demand item: Demand for an item that can be linked to the demand for other item. • Available inventory: Materials that are held in inventory or which are on order, but are not either safety stock or allocated to other uses. • Allocated inventory: Materials that are held in inventory or on order but which have been allocated to specific production orders in the future. • On hand inventory: The quantity of material, physically held in inventory at a point of time. It may include safety stock and allocated inventory except material on order.
  • 14. • Bill of materials (BOM) file: It provides a list indicating the all raw materials, parts, sub assemblies, and major assemblies in units that go into an end product. * It gives details of the build up of a product. * It may also be called as indented parts list * BOM file can be revised every time if there is a change in product design or specification. • A bill of materials may contain the following information: product code, description of the product; mechanical characteristics of the product; vendor's name; size, length, weight or other required physical characteristic of the product; test results (shrinkage, lead, etc); estimated/actual yield (allocation, quantity used); and further processing required (sponging, dyeing, enzyme bath, etc).
  • 16. MRP Inputs Customer order Sales forecast Master production schedule (MPS) Engineering changes Bill of Materials (BOM) Inventory status file MRP System Service parts requirements
  • 17. Inventory status file • It provides a computerized record of each material physically held in the system. • There will be only one inventory status for individual material, even if it is used at different levels of production or in different end products. • The file indicates, * Material code * Material name * Inventory-on-hand (physically available) * Inventory on order (ordered but yet to arrive) * Customer order for item • The file also contains information such as * Lot size *Lead times * Safety stock level *Scrap-rate
  • 18. Lead time in MRP • In MRP, lead times are used to determine starting dates for assembling final products and subassemblies, for producing component parts & for ordering raw materials. • Types: * Ordering lead time: Time gap b/w start of purchasing process to receipt from suppliers. * Manufacturing lead time: Processing of part through the machines specified on route sheet. Order raw material Start of production Place order for subassembly 1 Subassembly 1 needed Final Product 1 2 3 4 5 6 7 offsetting
  • 19. Independent and Dependent demand A B (4) D (2) E (1) C (2) D (3) F (2) Independent Demand (end item) Dependent demand (components)
  • 20. Independent v/s Dependent demand • Independent Demand:  Demand unrelated to demand of other products (ex: end products/finished goods).  Usually forecast.  Conventional inventory control (EOQ) applicable. • Dependent Demand:  Demand directly related to demand of some other product (ex: components, raw materials, subassemblies)  Requirements derived from delivery schedule of end items.  MRP is the appropriate tool for planning & control of manufacture inventories.
  • 21. Working of MRP • Bucketing: At what time and in what quantity a product is needed. MRP starts with consolidating period requirements for different end products. These time periods are known as “buckets”. • Add service (spare) parts, which are not included in MPS. • Part explosion- Each item exploded (divided) into constituent materials. • Offsetting: Displacing requirement by a product equal to the lead time of the product. • Aggregation: Find gross requirement for each component or raw material.
  • 22. • Netting: Involves modification of aggregated (gross) requirement. + Scheduled receipts] • Procurement schedule: the requirement is now advanced by a lead-time for final assembly. Pertains to production process lead-time. To expect the MRP run to schedule the procurement proposals correctly, we have to maintain the following in the master data's properly: a) In-house production times (for in house manufacturing, maintained in the material master MRP 2 view as lot independent and as lot dependent in the work scheduling view), b) Planned delivery times (for external procurement, maintained in the material master), c) Interoperation times (optional for in house production, maintained in the material master or Task lists such as routing or recipes), d) Planned goods receipt times (optional for external and internal procurement) e) Set up times and tear down times (optional for in house production, maintained in the material master Work Scheduling view or in the task list such as routing or recipes) • Lot sizing: this is used to consolidate the requirements in pre-specified lot sizes, so the economic order quantity may be ordered. •
  • 23. MRP Outputs MRP Order release requirements (orders to be released now) Order Rescheduling (expedite, de-expedite, open orders) Planned orders (future)
  • 24. • Order releases: Based on MPS report, inventory status and product structure, MRP releases orders to procure items in tune with the due date requirements at every level. *Purchase orders (PO) sent to purchase department to procure items from outside. *Shop orders are released to produce/procure items from in house workshops. • Order rescheduling: Due to arise of alterations in production schedules, few orders need to be expedite/few more get cancelled. MRP package accommodate all such changes and gives reschedule for all further orders. • Planned orders release: The quantity of an item that is planned to be ordered and planned time period for releasing this order, so that, the item will be received when needed.
  • 25. Benefits of MRP • Understanding the effect of changes in future periods. • Triggers a process to improve BOM, to guarantee reliable inventory records and better management. • Improved customer service. • Reduction in lead time. • Increase in productivity. • Reduce purchasing cost. • Improve production and supply schedules. • Reduce manufacturing cost. • Less scrap and rework. • Higher production quality.
  • 26. Drawbacks of MRP • Incorrectness in suppliers’ lead time: MRP depends heavily on correctness of lead time data. • Incorrectness in inventory data: miscounting, unaccounted scrap, items lost in transit etc., • Inaccurate manufacturing lead time: change in customers’ demand, change in workload of factory. • Inaccuracies in BOM structure: change in design, component substitution without recording.
  • 27. Conclusion • MRP is a….. * Computerized inventory control * Production planning system that…….. * Schedules component items as needed Which will…… * Track inventory and * Help a company in many other aspects of business