Lesson #2
Assessing
Organizational
Readiness
Lemberg PMO School 2025
https://lembs.com/pmoschool
23 January 2025
MichaelVidyakin
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
What you have learned during L1 – Introduction to
PMO:
• History of PMOs
• Roles & Functions of PMOs
• Benefits &Trends of PMOs
• DifferentTypes of PMOs
3 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Today’s Agenda / Sections of L2 - Assessing
Organizational Readiness:
1. Identifying the need for a PMO in an IT company
2. Assessing project management maturity in the organization
3. Defining the scope and objectives of the PMO
4. Identifying stakeholders and their roles in the PMO
1/23/2025
4
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
What are your expectations for this lesson?
5 1/23/2025
1. Розкрити поняття / CMMI , PM3
2. Як зрозуміти чи люди розуміють проектне управління?
Identifying the need
for a PMO in an IT
company
Section 1
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
• A million $$ question
• Depends on many factors of the company specific –
size, culture, maturity, scope, etc.
• Based on top-management needs & decisions
7 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
1. Silos operations?
Are the different departments and segments of your
company able to work together?
If not and they’re still operating in silos, then you may
need a PMO.
8 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
2. Unified Procedures?
Are your methodologies and procedures consistent
across projects?
If not, then you may need a PMO to standardize these
things across the company.
9 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
3. Stakeholders’ expectations
Are senior leaders, top executives, and key stakeholders
happy with the way projects are managed and run?
If not, a PMO can provide advice on best practices and
industry standards for your next projects.
10 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
4. Strategy changes or transformations?
Are you in the process of implementing strategy
changes within the organization?
If so, you may need a PMO to provide strategic
direction & alignment.
11 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
5. Large & Complex projects?
Do you consistently work on large projects with
significant impact and investment?
If you do, you’re likely to benefit from the experience
and expertise of a PMO.
12 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Does your company need a PMO?
6. Project transparency
Is project visibility a problem in your organization?
If it is, you may need a PMO to centralize data
tracking and analysis, project performance
monitoring, and resource management.
13 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Potential factors & signs that your company needs in
PMO
• Your processes are not consistent throughout teams
• Your projects are not aligned with your business strategy
• Your human resources are insufficient
• You don’t have a project management knowledge base
• Your company's different departments and segments are not able
to work together
• Your methodologies and procedures are not consistent across
projects
• Your organization has a large number of projects or very big
projects that require coordination and integration.
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
When a PMO is needed
1. Complex Projects: If your company handles multiple, complex projects
simultaneously, a PMO can provide the necessary structure and oversight.
2. Need for Standardization:Companies requiring standardized project
management practices across various departments benefit from a PMO.
3. Resource Management: Efficient allocation and utilization of resources
across projects is a key PMO function.
4. Strategic Alignment: PMOs help ensure that projects align with the
company's strategic goals.
5. Performance Measurement: If there's a need for consistent project
performance assessment and improvement, a PMO can be invaluable.
6. Risk Management: PMOs are effective in identifying, assessing, and
mitigating risks across projects.
7. Change Management: For companies undergoing significant changes or
transformations, PMOs can provide guidance and stability.
8. Knowledge Sharing: PMOs facilitate the sharing of best practices, lessons
learned, and expertise across the organization.
15 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
When a PMO is not needed
1. Small or Simple Projects: For companies with small-scale or less
complex projects, a PMO might be an unnecessary overhead.
2. Limited Resources: If the resource pool is limited, especially in smaller
companies, establishing a PMO might not be feasible.
3. Flexibility Over Standardization: Companies that prioritize flexibility
and individual project autonomy over standardized processes may find
a PMO restrictive.
4. AutonomousTeams: If project teams are highly autonomous and
effective without centralized oversight, a PMO might not add value.
5. Lack of Strategic Alignment: If projects are straightforward and not
directly tied to strategic objectives, a PMO's role may be less impactful.
6. Low Risk and Change Frequency: Companies with projects that have
low risk and change frequency might not need the risk and change
management support a PMO offers.
7. Cultural Resistance: Organizational culture resistant to the structured
approach of a PMO can render it ineffective.
16 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
No PMO? Key points to consider
• Organizational Size and Maturity: Larger or more mature
organizations with complex project portfolios often benefit more
from PMOs.
• Project Diversity: The more diverse the project portfolio, the
more likely a PMO will be beneficial.
• Executive Support: Successful PMO implementation requires
strong executive support and alignment with business objectives.
• Additional material:
17 1/23/2025
No PMO? Know when you need
one (pmi.org)
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Identification the needs for PMO
Step-by-step plan
1. Initial assessment
2. Evaluate current project management practices
3. Resource management analysis
4. Strategic alignment check
5. Performance monitoring
6. Risk management review
7. Cultural and organizational readiness
8. External factors consideration
9. Collect feedback
10.Cost-benefit analysis
11. Decision and recommendation
12.Presentation to leadership
18 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (1,2)
Step 1: Initial assessment and data
collection
• Define Objectives: Clearly outline
what you aim to achieve with a
PMO.This could include improved
project delivery, better resource
management, standardization, etc.
• Gather Data: Collect data on
current project performance,
including timelines, budgets, scope,
and quality metrics.
Step 2: Evaluate current project
management practices
• Assess Project Complexity: Review
the scale and complexity of ongoing
and upcoming IT projects.
• Analyze Methodologies: Evaluate
the consistency of project
management methodologies across
different teams or departments.
• Identify Pain Points: Determine
areas where project management is
falling short, such as delays, budget
overruns, or quality issues.
19 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (3,4)
Step 3: Resource management
analysis
• Resource allocation: Examine how
resources (personnel, technology,
budget) are currently allocated and
identify any inefficiencies.
• Skill Gap Analysis:Assess if there's
a need for better skill management
and training within the project
teams.
Step 4: Strategic alignment check
• Align Projects with Business
Goals: Ensure that IT projects align
with the company's strategic
objectives.
• Change Management Needs:
Identify how well the company is
managing change, particularly in
the fast-paced IT sector.
20 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (5,6)
Step 5: Performance monitoring
• ReviewTracking and Metrics:
Examine existing project tracking
and performance metrics.
• Evaluate Reporting Systems:
Check the effectiveness of current
reporting mechanisms and
stakeholder communication.
Step 6: Risk management review
• Risk Assessment Process:Analyze
the current approach to risk
identification, assessment, and
mitigation in IT projects.
21 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (7,8)
Step 7: Cultural and organizational
readiness
• Assess OrganizationalCulture:
Determine if the culture is
conducive to the structured
approach of a PMO.
• StakeholderAnalysis: Identify key
stakeholders and assess their
openness to adopting a PMO.
Step 8: External Factors
Consideration
• MarketTrends: Look at external
factors such as market demands
and client expectations.
• RegulatoryCompliance:Consider if
compliance and regulatory
standards necessitate a PMO.
22 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (9,10)
Step 9: Collect feedback
• Conduct Surveys/Interviews:Get
insights from project managers,
team members, and other
stakeholders about their views on
project management challenges
and the potential role of a PMO.
Step 10: Cost-benefit analysis
• Estimate PMO Costs: Consider the
financial implications of setting up a
PMO.
• Project Benefits: Estimate the
potential benefits, including
efficiency gains, better project
success rates, and alignment with
strategic goals.
23 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Step-by-step plan (11,12)
Step 11: Decision and
recommendation
• Compile Findings: Summarize the
insights from the previous steps
into a comprehensive report.
• Make a Recommendation: Based
on the analysis, recommend
whether or not to establish a PMO.
Step 12: Presentation to
leadership
• Prepare Presentation: Develop a
clear and concise presentation of
your findings and
recommendations for the
company's leadership.
• Schedule and Hold a Meeting:
Present your findings and facilitate
a discussion on the next steps.
24 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
How do you know that your company does really
need a PMO now? Or .. there is no need?
25 1/23/2025
• Налагодити комунікацію та навчити всіх працювати (як робити роботу)
• Запит від керівництва
• Потрібно побудувати всі операційні процеси
• Розширення штату – для розуміння процесів, онбордингу, навчання
• Запит кері-ва – ефективне планування ресурсів на кілька місяців наперед
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
26 1/23/2025
Assessing project
management
maturity in the
organization
Section 2
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
What is Project management maturity?
• Project management maturity reflects a company’s ability to
lead successful projects.
• Companies with underdeveloped maturity may not finish projects
on time or within budget.
• Having high project management maturity means planning,
executing, and completing projects well (without relying solely
on the talents and leadership of a few gifted individuals).
• A project management maturity assessment is a process of
evaluating the reliability, consistency, and effectiveness of an
organization's project management approach, methodology,
strategy, and decision-making.
• It can be done internally or by a professional consultant, and it
involves various methods of data collection, such as interviews,
surveys, benchmarks, and document reviews.
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Characteristics of HIGH project management maturity
• Projects finish on schedule
• Teams mitigate risks and complete projects well
• Finished projects reflect original goals
• Projects deliver benefits
• Projects continue successfully despite project changes
• Project management applies good project governance throughout
the organization.
29 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Why do you need to assess the maturity?
• A 2018 survey “Pulse of the Profession by PMI” showed that companies
waste $1 million every 20 seconds because of poor project
management.
• A maturity assessment is needed if any of following are true for your
company:
1) Projects don’t have kick-off or close meetings.
2) Projects lack charters and statements of work.
3) Projects are not realistic or time-bound.
4) Teams repeatedly fail to implement processes or tools.
5) Managers don't get the results they need.
6) Employees don't know what to do.
7) Management doesn’t receive clear deadlines.
30 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Чи можливо побудувати ПМО в такій організації?
(травень 2021 – лютий 2022)
31 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Project Management Maturity Models
• Project management maturity models measure how well a
company handles projects.
• Such models provide criteria and scoring systems to assess
capabilities.
• Models also provide a framework for implementing process
improvements in the future
• 25+ models exist
32 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
7 models to consider
1. Capability Maturity Model (CMM)
2. Organizational Project Management Maturity Model (OPM3)
3. Project Management Maturity Model (PMMMSM)
4. Berkeley Project Management Process Maturity Model
5. Gartner Score Diagnostic Family
6. Kerzner’s Project Management Maturity Model
7. Portfolio, Programme, and Project Management Maturity Model
(P3M3®)
33 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
1. Capability Maturity Model (CMM)
• Designed with contracted software projects in mind, the Capability
Maturity Model determines a company’s maturity level by evaluating its
standardized processes.
• This method includes two approaches to assessment and improvement:
staged, which tracks a specific set of processes throughout an
organization, and continuous, which follows process capabilities based
on an organization's priorities.
• Once the evaluation is complete, managers rank the company based on
the model’s five maturity levels: initial, managed, defined, quantitatively
managed, and optimizing.
• While the Capability Maturity Model is an excellent option for evaluating
software companies, it is adaptable for any industry.
• The CMMI Institute (ISACA since 2016 - https://cmmiinstitute.com/),
which owns the model, notes that companies in aerospace, finance,
healthcare, information technology, software, defense, transportation,
and telecommunications have found success using its methods.
34 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Levels of Maturity
35 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
2. Organizational Project Management Maturity
Model (OPM3)
• The PMI’sOrganizational Project Management Maturity Model can help
managers assess maturity levels in projects, programs, and portfolios.
• This model uses the same 10 knowledge areas of PMBOK® guide to drive
assessments, which are project integration, time, scope, cost, quality,
human resources, risk, communications, stakeholders, and procurement.
• Once the assessment is complete, the model assigns one of four maturity
stages: standardize, measure, control, and continuously improve.
• Any organization in any industry can use it to make a thorough
assessment of, and ultimately improve, its project management
processes.
• Additional resources:
36 1/23/2025
1) PMI organizational maturity model
2) Assessing project management
maturity (pmi.org)
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
37 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
3. Project Management Maturity Model (PMMMSM)
• The model also uses the PMBOK® 10 knowledge areas to create a
standardized method for maturity assessment.
• When using this model, project managers assign one of five maturity
levels to each knowledge area.These levels are the following: initial
process, structured process and standards, organization standards and
institutionalized process, managed process, and optimizing process.
38
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
4. Berkeley Project Management Process Maturity
Model
• Applicable to any industry
• When using this model, project managers assess the maturity level of key
project management processes and organizational characteristics and
rank them on a five-stage maturity scale, which includes the ad-hoc,
defined, managed, integrated, and sustained stages.
39 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
5. Gartner Score Diagnostic Family
• Founded in 2014, the Gartner Score Diagnostic Family is a collection of
online maturity assessments.
• Highly customizable and adaptive, this model helps managers identify
priority growth areas based on their company’s strategic aims.
• With its interactive, intuitive tools, the Gartner Score Diagnostic Family
reveals which processes are undeveloped and provides a cross-functional
overview of the areas that are critical to strategic planning.
40 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
6. Kerzner’s Project Management Maturity Model
• The Kerzner model defines each of its five maturity levels by the primary
focus of that stage: common language, common process, singular
methodology, benchmarking, and continuous improvement.
• For example, at the common process level, managers should work on
designing and implementing standardized, repeatable processes, while at
the continuous improvement level, managers should focus on monitoring
current processes and tweaking them as needed.
41 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
7. Portfolio, Programme, and Project Management
Maturity Model (P3M3®)
• This model ranks maturity on a five-stage scale and gauges maturity
based on seven core processes: organizational governance, management
control, benefits management, risk management, financial management,
resource management, and stakeholder management.
• In addition to improving organizational processes, this model is also
useful for assessing and improving project portfolio management (PPM).
42 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
With which tools assessments are done?
• Artifact Collection: Reviewing documents helps managers determine
whether or not teams follow processes and write project plans, and how
well they do so. A document review also shows if practitioners understand
why processes are important.
• Interviews: Conducting interviews individually or in groups helps reveal
how widely teams apply processes and understand process importance.
Personal interviews, in particular, can reveal commitment to and
enthusiasm for following practices and process nuances.
• Questionnaires: Administering questionnaires is a more methodical,
standardized method of determining project management maturity.
Models offer either self-administered or 360-degree questionnaires.
Companies often limit self-administered surveys to upper management
and distribute 360-degree questionnaires to teams and individuals.The
results of a 360-degree questionnaire administered by a third party may
provide a more balanced perspective than self-administered surveys.
• Benchmarking: Benchmarking against other organizations provides an
objective standard for considering a company’s efforts.
43 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Assessment Radar Chart
44 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Improved Maturity
• The organization has achieved full project
management maturity when
1) it has met the requirements and standards for project
management effectiveness as defined by the model, and
2) it is capable of demonstrating improvements such as on-time
project delivery, cost reductions, organizational efficiency, and
profitability.
45 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
What is the maturity level (1-5) of your PMO? - in
the past (AS WAS), now (AS IS) andTO BE?
46 1/23/2025
• AS IS 1 -> 5 (2027)
• AS IS 2-3 -> 4 (2026)
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Лелека несе
якісний такмед
для ЗСУ –
ПІДТРИМАЙ !
47 1/23/2025
URL:
www.Leleka.Care
FB:
facebook.com/Lel
ekaFoundation
Defining the scope
and objectives of
the PMO
Section 3
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Main focus of PMOs activities
• A PMO is a centralized department in an organization that oversees and
manages projects via project managers. It provides support, guidance,
standards, tools and training to ensure projects are completed on time
within budget, adhering to the required quality standards.
• PMO primarily focuses on three key functions:
1) Governance —Whether ensuring regulatory compliance, defining
standards, creating project policies and procedures, or periodic reviews
and audits, the PMO team works with all the project managers to
ensure strong governance on projects undertaken by the organization
2) Support — A PMO provides support and guidance to project managers
and their project teams, develops methodologies and processes,
coaches and trains project teams, allocates resources and budget, and
procures and adopts tools
3) Delivery —The PMO team also focuses on stakeholder management,
documentation and delivery, risk management, tracking and
collaboration, change management, and ensures smoother execution
and delivery
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
General steps to set up a PMO (1/4)
1. Define your core business case — Create a case to define the
problems that project management is facing and the actual need
of a PMO.This document should answer how the organization
would benefit from a PMO and outline key objectives
2. Gain buy-in from top management — Present the business
case to the management and secure their support, funds, and
resources permissions
3. Define the scope — Define the PMO responsibilities and its
areas of work.
This should include all projects the PMO will manage
• Your PMO’s scope definition is complete when both product
and project scope elements are reflected and integrated
• Your PMO project’s scope is well-defined when each
stakeholder can see the elements that are important to them
and when all stakeholders agree that the project’s scope is
complete and accurate.
50 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
General steps to set up a PMO (2/4) - SCOPE
• A tabular approach can be used to scope
definition to help stakeholders understand
what the PMO is, what the PMO might be
in the future and what the PMO is not.
• Defining scope in a tabular format allows
scope elements to be categorized and
bundled, which allows for detailed review,
deeper insights, and at-a-glance synthesis
of a lot of information.
• There could be 100+ scope elements to
evaluate when defining a PMO.
• For each scope element, the presence or
absence of text in the columns indicates
that element’s scope status.
• Descriptive wording can be provided
instead of a generic “x” to ensure shared
understanding of complex elements.
51 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
General steps to set up a PMO (3/4)
4. Define the type of PMO to adapt — Knowing the scope and
responsibilities, analyze and decide on which type of PMO will
best suit your organization
5. Define the process and methodologies — Develop your initial
process, methodology, and best practices to be followed by
projects. Create templates for various communications in project
management
6. Identify success metrics — Identify the performance indicators
that can help measure the success and effectiveness of the PMO
7. Create a PMO charter —The charter is an official document that
explains the mission, vision, goals, objectives, and scope of the
PMO. It also records detailed processes, operating procedures,
and methodologies that the PMO will adapt
8. Acquire resources — Hire and train the PMO staff, procure
required tools and technologies, procure project management
software, and any other required assets
52 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
General steps to set up a PMO (4/4)
9. Training and support —Train project managers and project
teams on initial processes, methodologies, standards,
templates, practices as defined in the charter
10.Implement operating procedures —Work with project
managers and teams to implement standards, processes, best
practices, tools, and methodologies
11.Monitor and evaluate — Constantly monitor initial project
performance and impact due to introduction of the PMO.
Evaluate the results and take adequate actions to improvise
12.Communicate the value — Communicate the value of the new
PMO to all the stakeholders and explain the new milestones
13.Iterate and improve — Constantly evaluate and improve
operating procedures
53 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Some peculiarities in establishing a PMO
• Establishing a project management office doesn’t happen
overnight
• It can take at least a month or two and up to several months or
years to establish a strong, mature PMO
• When you first get started, create a small PMO with one project
and a small set of responsibilities
• Then you can slowly expand the scope of PMO and include more
projects as and when it becomes more mature and established
• Seek constant feedback from stakeholders and secure support
from senior management by periodically communicating values to
them
• The more your stakeholders can see project elements of interest
to them in your scope statement, the easier it becomes to manage
and control your project
54 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Common challenges when implementing a PMO
• A PMO can complicate the daily tasks of project
managers and teams by adding excessive paperwork.
• This potentially leads to slowness in project execution
and stretches project timelines resulting in financial
losses
• Forming a PMO can be expensive as it adds costs like
staff salaries, software and tools, training, and ongoing
operational expenses.
• Smaller organizations should not adopt PMO for this
reason and larger organizations should be mindful to
keeping costs in check
• Not all project teams and stakeholders might be
adaptable and some might resist adapting the policies,
procedures, and templates.
• Some teams might view a PMO as an intrusion, leading
to friction within the organization
55 1/23/2025
Added bureaucracy
Resistance to
change
Overhead costs
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
New PMO of the future
• Leaders can demand value and purpose-driven governance and
structure in the new PMO.The new PMO should be both value-driven,
with a seat at the C-suite table, and purpose-driven with
implementation teams recruited from across the organization as well
as trusted partners.
• PMO implementation models will be customized to help deliver the
critical performance outcomes and the notion of a one-sized PMO will
likely become obsolete.
• The PMO of the future can be defined by how business leaders
challenge the PMO of today, inviting an objective PMO maturity
review to help identify improvement areas and define their strategic
PMO plan.
• PMO transformations should become commonplace as business
leaders engage with expert partners to help strategically source their
PMO functions with implementation models that work for them
including outsourced, co-sourced or point solutions.
• PMO transformation begins by defining the right scope and
establishing a set of achievable objectives and realistic boundaries
that are based on a well-researched expert maturity assessment.
56 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Additional resources to read
• The Complete Guide to Project Management
Office (PMO) [2023] • Asana
57 1/23/2025
• Building a PMO from the ground up:Three
stories, one result (pmi.org)
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
What is out of scope in your PMO?
58 1/23/2025
• Немає потреби контролювати процеси на етапі проєктування
Identifying
stakeholders and
their roles in the
PMO
Section 4
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Why stakeholders matters?
Scope/
Requirements
Schedule
Cost
Project team
Outcomes
Culture
Benefits
Quality
Plans
Risk
Success
• by revealing the need change elements of the scope and/or project
requirements
• by expediting or halting project tasks editing or halting project tasks
• by cutting costs or raising expenses with changes
• by controlling access for skillful, knowledgeable, outcome-driven staff,
fostering a learning environment
• by informing plans or advocating changes
• by enabling or blocking work required for the desired outcomes
• by setting the team's involvement and organization's role
• by setting long-term goals for project value
• by defining the risk thresholds of the project he project
• by identifying and requiring quality requirements
• by defining success factors and participating in the evaluation of success
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
PMO outcomes depend on Stakeholder needs
61 1/23/2025
Interest
Power/
Authority
Influence
Impact on
outcomes
Need
Stakeholder
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Stakeholder management cycle
62 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Stakeholder Management
Useful Online Resources
Project Management Institute:
• Steps to Identify and Prioritize Stakeholders | PMI
• Stakeholder management strategies
• C-suite stakeholders
Other Sources:
• PMO Stakeholder Management: Definition and Roles
• How to Identify Project Stakeholders in Project Management
• What Is Stakeholder Management?
• How to identify stakeholders? (+Identification Cheatsheet)
• How to identify stakeholders (With examples) | Indeed.com UK
63 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Домашнє завдання
Наприкінці курсу Вам необхідно буде презентувати рішення та
план по впровадженню/оновленню PMO ваших/обраних
компаній з урахуванням знань та практик, отриманих на
заняттях курсу.
З заняття #2 у Вашій презентації мають міститися
обґрунтування:
1. Яка готовність організації до PMO та/або який поточний
рівень розвитку проєктного управління?
2. Який очікується обсяг робіт (та завдань) PMO? Що входить, а
що поза межами PMO?
64 1/23/2025
2023-2025 © Michael Vidyakin Michael.Vidyakin@gmail.com URL: Michael.Vidyakin.com
Ready to support your PMO
Michael.Vidyakin.com
+380 97 926 1101
65 1/23/2025
Michael Vidyakin: Assessing Organizational Readiness (UA)

Michael Vidyakin: Assessing Organizational Readiness (UA)

  • 1.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com
  • 2.
    Lesson #2 Assessing Organizational Readiness Lemberg PMOSchool 2025 https://lembs.com/pmoschool 23 January 2025 MichaelVidyakin
  • 3.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com What you have learned during L1 – Introduction to PMO: • History of PMOs • Roles & Functions of PMOs • Benefits &Trends of PMOs • DifferentTypes of PMOs 3 1/23/2025
  • 4.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Today’s Agenda / Sections of L2 - Assessing Organizational Readiness: 1. Identifying the need for a PMO in an IT company 2. Assessing project management maturity in the organization 3. Defining the scope and objectives of the PMO 4. Identifying stakeholders and their roles in the PMO 1/23/2025 4
  • 5.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com What are your expectations for this lesson? 5 1/23/2025 1. Розкрити поняття / CMMI , PM3 2. Як зрозуміти чи люди розуміють проектне управління?
  • 6.
    Identifying the need fora PMO in an IT company Section 1
  • 7.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? • A million $$ question • Depends on many factors of the company specific – size, culture, maturity, scope, etc. • Based on top-management needs & decisions 7 1/23/2025
  • 8.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 1. Silos operations? Are the different departments and segments of your company able to work together? If not and they’re still operating in silos, then you may need a PMO. 8 1/23/2025
  • 9.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 2. Unified Procedures? Are your methodologies and procedures consistent across projects? If not, then you may need a PMO to standardize these things across the company. 9 1/23/2025
  • 10.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 3. Stakeholders’ expectations Are senior leaders, top executives, and key stakeholders happy with the way projects are managed and run? If not, a PMO can provide advice on best practices and industry standards for your next projects. 10 1/23/2025
  • 11.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 4. Strategy changes or transformations? Are you in the process of implementing strategy changes within the organization? If so, you may need a PMO to provide strategic direction & alignment. 11 1/23/2025
  • 12.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 5. Large & Complex projects? Do you consistently work on large projects with significant impact and investment? If you do, you’re likely to benefit from the experience and expertise of a PMO. 12 1/23/2025
  • 13.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Does your company need a PMO? 6. Project transparency Is project visibility a problem in your organization? If it is, you may need a PMO to centralize data tracking and analysis, project performance monitoring, and resource management. 13 1/23/2025
  • 14.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Potential factors & signs that your company needs in PMO • Your processes are not consistent throughout teams • Your projects are not aligned with your business strategy • Your human resources are insufficient • You don’t have a project management knowledge base • Your company's different departments and segments are not able to work together • Your methodologies and procedures are not consistent across projects • Your organization has a large number of projects or very big projects that require coordination and integration.
  • 15.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com When a PMO is needed 1. Complex Projects: If your company handles multiple, complex projects simultaneously, a PMO can provide the necessary structure and oversight. 2. Need for Standardization:Companies requiring standardized project management practices across various departments benefit from a PMO. 3. Resource Management: Efficient allocation and utilization of resources across projects is a key PMO function. 4. Strategic Alignment: PMOs help ensure that projects align with the company's strategic goals. 5. Performance Measurement: If there's a need for consistent project performance assessment and improvement, a PMO can be invaluable. 6. Risk Management: PMOs are effective in identifying, assessing, and mitigating risks across projects. 7. Change Management: For companies undergoing significant changes or transformations, PMOs can provide guidance and stability. 8. Knowledge Sharing: PMOs facilitate the sharing of best practices, lessons learned, and expertise across the organization. 15 1/23/2025
  • 16.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com When a PMO is not needed 1. Small or Simple Projects: For companies with small-scale or less complex projects, a PMO might be an unnecessary overhead. 2. Limited Resources: If the resource pool is limited, especially in smaller companies, establishing a PMO might not be feasible. 3. Flexibility Over Standardization: Companies that prioritize flexibility and individual project autonomy over standardized processes may find a PMO restrictive. 4. AutonomousTeams: If project teams are highly autonomous and effective without centralized oversight, a PMO might not add value. 5. Lack of Strategic Alignment: If projects are straightforward and not directly tied to strategic objectives, a PMO's role may be less impactful. 6. Low Risk and Change Frequency: Companies with projects that have low risk and change frequency might not need the risk and change management support a PMO offers. 7. Cultural Resistance: Organizational culture resistant to the structured approach of a PMO can render it ineffective. 16 1/23/2025
  • 17.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com No PMO? Key points to consider • Organizational Size and Maturity: Larger or more mature organizations with complex project portfolios often benefit more from PMOs. • Project Diversity: The more diverse the project portfolio, the more likely a PMO will be beneficial. • Executive Support: Successful PMO implementation requires strong executive support and alignment with business objectives. • Additional material: 17 1/23/2025 No PMO? Know when you need one (pmi.org)
  • 18.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Identification the needs for PMO Step-by-step plan 1. Initial assessment 2. Evaluate current project management practices 3. Resource management analysis 4. Strategic alignment check 5. Performance monitoring 6. Risk management review 7. Cultural and organizational readiness 8. External factors consideration 9. Collect feedback 10.Cost-benefit analysis 11. Decision and recommendation 12.Presentation to leadership 18 1/23/2025
  • 19.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (1,2) Step 1: Initial assessment and data collection • Define Objectives: Clearly outline what you aim to achieve with a PMO.This could include improved project delivery, better resource management, standardization, etc. • Gather Data: Collect data on current project performance, including timelines, budgets, scope, and quality metrics. Step 2: Evaluate current project management practices • Assess Project Complexity: Review the scale and complexity of ongoing and upcoming IT projects. • Analyze Methodologies: Evaluate the consistency of project management methodologies across different teams or departments. • Identify Pain Points: Determine areas where project management is falling short, such as delays, budget overruns, or quality issues. 19 1/23/2025
  • 20.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (3,4) Step 3: Resource management analysis • Resource allocation: Examine how resources (personnel, technology, budget) are currently allocated and identify any inefficiencies. • Skill Gap Analysis:Assess if there's a need for better skill management and training within the project teams. Step 4: Strategic alignment check • Align Projects with Business Goals: Ensure that IT projects align with the company's strategic objectives. • Change Management Needs: Identify how well the company is managing change, particularly in the fast-paced IT sector. 20 1/23/2025
  • 21.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (5,6) Step 5: Performance monitoring • ReviewTracking and Metrics: Examine existing project tracking and performance metrics. • Evaluate Reporting Systems: Check the effectiveness of current reporting mechanisms and stakeholder communication. Step 6: Risk management review • Risk Assessment Process:Analyze the current approach to risk identification, assessment, and mitigation in IT projects. 21 1/23/2025
  • 22.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (7,8) Step 7: Cultural and organizational readiness • Assess OrganizationalCulture: Determine if the culture is conducive to the structured approach of a PMO. • StakeholderAnalysis: Identify key stakeholders and assess their openness to adopting a PMO. Step 8: External Factors Consideration • MarketTrends: Look at external factors such as market demands and client expectations. • RegulatoryCompliance:Consider if compliance and regulatory standards necessitate a PMO. 22 1/23/2025
  • 23.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (9,10) Step 9: Collect feedback • Conduct Surveys/Interviews:Get insights from project managers, team members, and other stakeholders about their views on project management challenges and the potential role of a PMO. Step 10: Cost-benefit analysis • Estimate PMO Costs: Consider the financial implications of setting up a PMO. • Project Benefits: Estimate the potential benefits, including efficiency gains, better project success rates, and alignment with strategic goals. 23 1/23/2025
  • 24.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Step-by-step plan (11,12) Step 11: Decision and recommendation • Compile Findings: Summarize the insights from the previous steps into a comprehensive report. • Make a Recommendation: Based on the analysis, recommend whether or not to establish a PMO. Step 12: Presentation to leadership • Prepare Presentation: Develop a clear and concise presentation of your findings and recommendations for the company's leadership. • Schedule and Hold a Meeting: Present your findings and facilitate a discussion on the next steps. 24 1/23/2025
  • 25.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com How do you know that your company does really need a PMO now? Or .. there is no need? 25 1/23/2025 • Налагодити комунікацію та навчити всіх працювати (як робити роботу) • Запит від керівництва • Потрібно побудувати всі операційні процеси • Розширення штату – для розуміння процесів, онбордингу, навчання • Запит кері-ва – ефективне планування ресурсів на кілька місяців наперед
  • 26.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 26 1/23/2025
  • 27.
    Assessing project management maturity inthe organization Section 2
  • 28.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com What is Project management maturity? • Project management maturity reflects a company’s ability to lead successful projects. • Companies with underdeveloped maturity may not finish projects on time or within budget. • Having high project management maturity means planning, executing, and completing projects well (without relying solely on the talents and leadership of a few gifted individuals). • A project management maturity assessment is a process of evaluating the reliability, consistency, and effectiveness of an organization's project management approach, methodology, strategy, and decision-making. • It can be done internally or by a professional consultant, and it involves various methods of data collection, such as interviews, surveys, benchmarks, and document reviews.
  • 29.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Characteristics of HIGH project management maturity • Projects finish on schedule • Teams mitigate risks and complete projects well • Finished projects reflect original goals • Projects deliver benefits • Projects continue successfully despite project changes • Project management applies good project governance throughout the organization. 29 1/23/2025
  • 30.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Why do you need to assess the maturity? • A 2018 survey “Pulse of the Profession by PMI” showed that companies waste $1 million every 20 seconds because of poor project management. • A maturity assessment is needed if any of following are true for your company: 1) Projects don’t have kick-off or close meetings. 2) Projects lack charters and statements of work. 3) Projects are not realistic or time-bound. 4) Teams repeatedly fail to implement processes or tools. 5) Managers don't get the results they need. 6) Employees don't know what to do. 7) Management doesn’t receive clear deadlines. 30 1/23/2025
  • 31.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Чи можливо побудувати ПМО в такій організації? (травень 2021 – лютий 2022) 31 1/23/2025
  • 32.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Project Management Maturity Models • Project management maturity models measure how well a company handles projects. • Such models provide criteria and scoring systems to assess capabilities. • Models also provide a framework for implementing process improvements in the future • 25+ models exist 32 1/23/2025
  • 33.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 7 models to consider 1. Capability Maturity Model (CMM) 2. Organizational Project Management Maturity Model (OPM3) 3. Project Management Maturity Model (PMMMSM) 4. Berkeley Project Management Process Maturity Model 5. Gartner Score Diagnostic Family 6. Kerzner’s Project Management Maturity Model 7. Portfolio, Programme, and Project Management Maturity Model (P3M3®) 33 1/23/2025
  • 34.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 1. Capability Maturity Model (CMM) • Designed with contracted software projects in mind, the Capability Maturity Model determines a company’s maturity level by evaluating its standardized processes. • This method includes two approaches to assessment and improvement: staged, which tracks a specific set of processes throughout an organization, and continuous, which follows process capabilities based on an organization's priorities. • Once the evaluation is complete, managers rank the company based on the model’s five maturity levels: initial, managed, defined, quantitatively managed, and optimizing. • While the Capability Maturity Model is an excellent option for evaluating software companies, it is adaptable for any industry. • The CMMI Institute (ISACA since 2016 - https://cmmiinstitute.com/), which owns the model, notes that companies in aerospace, finance, healthcare, information technology, software, defense, transportation, and telecommunications have found success using its methods. 34 1/23/2025
  • 35.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Levels of Maturity 35 1/23/2025
  • 36.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 2. Organizational Project Management Maturity Model (OPM3) • The PMI’sOrganizational Project Management Maturity Model can help managers assess maturity levels in projects, programs, and portfolios. • This model uses the same 10 knowledge areas of PMBOK® guide to drive assessments, which are project integration, time, scope, cost, quality, human resources, risk, communications, stakeholders, and procurement. • Once the assessment is complete, the model assigns one of four maturity stages: standardize, measure, control, and continuously improve. • Any organization in any industry can use it to make a thorough assessment of, and ultimately improve, its project management processes. • Additional resources: 36 1/23/2025 1) PMI organizational maturity model 2) Assessing project management maturity (pmi.org)
  • 37.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 37 1/23/2025
  • 38.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 3. Project Management Maturity Model (PMMMSM) • The model also uses the PMBOK® 10 knowledge areas to create a standardized method for maturity assessment. • When using this model, project managers assign one of five maturity levels to each knowledge area.These levels are the following: initial process, structured process and standards, organization standards and institutionalized process, managed process, and optimizing process. 38
  • 39.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 4. Berkeley Project Management Process Maturity Model • Applicable to any industry • When using this model, project managers assess the maturity level of key project management processes and organizational characteristics and rank them on a five-stage maturity scale, which includes the ad-hoc, defined, managed, integrated, and sustained stages. 39 1/23/2025
  • 40.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 5. Gartner Score Diagnostic Family • Founded in 2014, the Gartner Score Diagnostic Family is a collection of online maturity assessments. • Highly customizable and adaptive, this model helps managers identify priority growth areas based on their company’s strategic aims. • With its interactive, intuitive tools, the Gartner Score Diagnostic Family reveals which processes are undeveloped and provides a cross-functional overview of the areas that are critical to strategic planning. 40 1/23/2025
  • 41.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 6. Kerzner’s Project Management Maturity Model • The Kerzner model defines each of its five maturity levels by the primary focus of that stage: common language, common process, singular methodology, benchmarking, and continuous improvement. • For example, at the common process level, managers should work on designing and implementing standardized, repeatable processes, while at the continuous improvement level, managers should focus on monitoring current processes and tweaking them as needed. 41 1/23/2025
  • 42.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com 7. Portfolio, Programme, and Project Management Maturity Model (P3M3®) • This model ranks maturity on a five-stage scale and gauges maturity based on seven core processes: organizational governance, management control, benefits management, risk management, financial management, resource management, and stakeholder management. • In addition to improving organizational processes, this model is also useful for assessing and improving project portfolio management (PPM). 42 1/23/2025
  • 43.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com With which tools assessments are done? • Artifact Collection: Reviewing documents helps managers determine whether or not teams follow processes and write project plans, and how well they do so. A document review also shows if practitioners understand why processes are important. • Interviews: Conducting interviews individually or in groups helps reveal how widely teams apply processes and understand process importance. Personal interviews, in particular, can reveal commitment to and enthusiasm for following practices and process nuances. • Questionnaires: Administering questionnaires is a more methodical, standardized method of determining project management maturity. Models offer either self-administered or 360-degree questionnaires. Companies often limit self-administered surveys to upper management and distribute 360-degree questionnaires to teams and individuals.The results of a 360-degree questionnaire administered by a third party may provide a more balanced perspective than self-administered surveys. • Benchmarking: Benchmarking against other organizations provides an objective standard for considering a company’s efforts. 43 1/23/2025
  • 44.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Assessment Radar Chart 44 1/23/2025
  • 45.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Improved Maturity • The organization has achieved full project management maturity when 1) it has met the requirements and standards for project management effectiveness as defined by the model, and 2) it is capable of demonstrating improvements such as on-time project delivery, cost reductions, organizational efficiency, and profitability. 45 1/23/2025
  • 46.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com What is the maturity level (1-5) of your PMO? - in the past (AS WAS), now (AS IS) andTO BE? 46 1/23/2025 • AS IS 1 -> 5 (2027) • AS IS 2-3 -> 4 (2026)
  • 47.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Лелека несе якісний такмед для ЗСУ – ПІДТРИМАЙ ! 47 1/23/2025 URL: www.Leleka.Care FB: facebook.com/Lel ekaFoundation
  • 48.
    Defining the scope andobjectives of the PMO Section 3
  • 49.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Main focus of PMOs activities • A PMO is a centralized department in an organization that oversees and manages projects via project managers. It provides support, guidance, standards, tools and training to ensure projects are completed on time within budget, adhering to the required quality standards. • PMO primarily focuses on three key functions: 1) Governance —Whether ensuring regulatory compliance, defining standards, creating project policies and procedures, or periodic reviews and audits, the PMO team works with all the project managers to ensure strong governance on projects undertaken by the organization 2) Support — A PMO provides support and guidance to project managers and their project teams, develops methodologies and processes, coaches and trains project teams, allocates resources and budget, and procures and adopts tools 3) Delivery —The PMO team also focuses on stakeholder management, documentation and delivery, risk management, tracking and collaboration, change management, and ensures smoother execution and delivery
  • 50.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com General steps to set up a PMO (1/4) 1. Define your core business case — Create a case to define the problems that project management is facing and the actual need of a PMO.This document should answer how the organization would benefit from a PMO and outline key objectives 2. Gain buy-in from top management — Present the business case to the management and secure their support, funds, and resources permissions 3. Define the scope — Define the PMO responsibilities and its areas of work. This should include all projects the PMO will manage • Your PMO’s scope definition is complete when both product and project scope elements are reflected and integrated • Your PMO project’s scope is well-defined when each stakeholder can see the elements that are important to them and when all stakeholders agree that the project’s scope is complete and accurate. 50 1/23/2025
  • 51.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com General steps to set up a PMO (2/4) - SCOPE • A tabular approach can be used to scope definition to help stakeholders understand what the PMO is, what the PMO might be in the future and what the PMO is not. • Defining scope in a tabular format allows scope elements to be categorized and bundled, which allows for detailed review, deeper insights, and at-a-glance synthesis of a lot of information. • There could be 100+ scope elements to evaluate when defining a PMO. • For each scope element, the presence or absence of text in the columns indicates that element’s scope status. • Descriptive wording can be provided instead of a generic “x” to ensure shared understanding of complex elements. 51 1/23/2025
  • 52.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com General steps to set up a PMO (3/4) 4. Define the type of PMO to adapt — Knowing the scope and responsibilities, analyze and decide on which type of PMO will best suit your organization 5. Define the process and methodologies — Develop your initial process, methodology, and best practices to be followed by projects. Create templates for various communications in project management 6. Identify success metrics — Identify the performance indicators that can help measure the success and effectiveness of the PMO 7. Create a PMO charter —The charter is an official document that explains the mission, vision, goals, objectives, and scope of the PMO. It also records detailed processes, operating procedures, and methodologies that the PMO will adapt 8. Acquire resources — Hire and train the PMO staff, procure required tools and technologies, procure project management software, and any other required assets 52 1/23/2025
  • 53.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com General steps to set up a PMO (4/4) 9. Training and support —Train project managers and project teams on initial processes, methodologies, standards, templates, practices as defined in the charter 10.Implement operating procedures —Work with project managers and teams to implement standards, processes, best practices, tools, and methodologies 11.Monitor and evaluate — Constantly monitor initial project performance and impact due to introduction of the PMO. Evaluate the results and take adequate actions to improvise 12.Communicate the value — Communicate the value of the new PMO to all the stakeholders and explain the new milestones 13.Iterate and improve — Constantly evaluate and improve operating procedures 53 1/23/2025
  • 54.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Some peculiarities in establishing a PMO • Establishing a project management office doesn’t happen overnight • It can take at least a month or two and up to several months or years to establish a strong, mature PMO • When you first get started, create a small PMO with one project and a small set of responsibilities • Then you can slowly expand the scope of PMO and include more projects as and when it becomes more mature and established • Seek constant feedback from stakeholders and secure support from senior management by periodically communicating values to them • The more your stakeholders can see project elements of interest to them in your scope statement, the easier it becomes to manage and control your project 54 1/23/2025
  • 55.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Common challenges when implementing a PMO • A PMO can complicate the daily tasks of project managers and teams by adding excessive paperwork. • This potentially leads to slowness in project execution and stretches project timelines resulting in financial losses • Forming a PMO can be expensive as it adds costs like staff salaries, software and tools, training, and ongoing operational expenses. • Smaller organizations should not adopt PMO for this reason and larger organizations should be mindful to keeping costs in check • Not all project teams and stakeholders might be adaptable and some might resist adapting the policies, procedures, and templates. • Some teams might view a PMO as an intrusion, leading to friction within the organization 55 1/23/2025 Added bureaucracy Resistance to change Overhead costs
  • 56.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com New PMO of the future • Leaders can demand value and purpose-driven governance and structure in the new PMO.The new PMO should be both value-driven, with a seat at the C-suite table, and purpose-driven with implementation teams recruited from across the organization as well as trusted partners. • PMO implementation models will be customized to help deliver the critical performance outcomes and the notion of a one-sized PMO will likely become obsolete. • The PMO of the future can be defined by how business leaders challenge the PMO of today, inviting an objective PMO maturity review to help identify improvement areas and define their strategic PMO plan. • PMO transformations should become commonplace as business leaders engage with expert partners to help strategically source their PMO functions with implementation models that work for them including outsourced, co-sourced or point solutions. • PMO transformation begins by defining the right scope and establishing a set of achievable objectives and realistic boundaries that are based on a well-researched expert maturity assessment. 56 1/23/2025
  • 57.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Additional resources to read • The Complete Guide to Project Management Office (PMO) [2023] • Asana 57 1/23/2025 • Building a PMO from the ground up:Three stories, one result (pmi.org)
  • 58.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com What is out of scope in your PMO? 58 1/23/2025 • Немає потреби контролювати процеси на етапі проєктування
  • 59.
  • 60.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Why stakeholders matters? Scope/ Requirements Schedule Cost Project team Outcomes Culture Benefits Quality Plans Risk Success • by revealing the need change elements of the scope and/or project requirements • by expediting or halting project tasks editing or halting project tasks • by cutting costs or raising expenses with changes • by controlling access for skillful, knowledgeable, outcome-driven staff, fostering a learning environment • by informing plans or advocating changes • by enabling or blocking work required for the desired outcomes • by setting the team's involvement and organization's role • by setting long-term goals for project value • by defining the risk thresholds of the project he project • by identifying and requiring quality requirements • by defining success factors and participating in the evaluation of success
  • 61.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com PMO outcomes depend on Stakeholder needs 61 1/23/2025 Interest Power/ Authority Influence Impact on outcomes Need Stakeholder
  • 62.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Stakeholder management cycle 62 1/23/2025
  • 63.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Stakeholder Management Useful Online Resources Project Management Institute: • Steps to Identify and Prioritize Stakeholders | PMI • Stakeholder management strategies • C-suite stakeholders Other Sources: • PMO Stakeholder Management: Definition and Roles • How to Identify Project Stakeholders in Project Management • What Is Stakeholder Management? • How to identify stakeholders? (+Identification Cheatsheet) • How to identify stakeholders (With examples) | Indeed.com UK 63 1/23/2025
  • 64.
    2023-2025 © MichaelVidyakin [email protected] URL: Michael.Vidyakin.com Домашнє завдання Наприкінці курсу Вам необхідно буде презентувати рішення та план по впровадженню/оновленню PMO ваших/обраних компаній з урахуванням знань та практик, отриманих на заняттях курсу. З заняття #2 у Вашій презентації мають міститися обґрунтування: 1. Яка готовність організації до PMO та/або який поточний рівень розвитку проєктного управління? 2. Який очікується обсяг робіт (та завдань) PMO? Що входить, а що поза межами PMO? 64 1/23/2025