Project Management Professional
(PMP)
A Brief Introduction
What is PMP?
Project Management Professional (PMP) is an internationally recognized professional designation offered by Project Management Institute (PMI).
As of March 2018, there are 833,025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide.
The exam is based on the PMI Project Management Body of Knowledge (PMBOK), and the prerequisites are:
• Secondary degree (high school diploma, associate’s degree or the global equivalent)
• 7,500 hours leading and directing projects
• 35 hours of project management education
OR
• Four-year degree
• 4,500 hours leading and directing projects
• 35 hours of project management education
• A candidate who passes the exam and meets the professional requirements is awarded the PMP certification.
What is a project?
• A temporary endeavour undertaken to create Unique products, services or
result.
In other way, a project may also be defined as a set of interrelated tasks to be
executed over a fixed period and within a certain cost and certain limitations.
Features of Project
• It has a defined beginning, end, schedule and approach
• End results have specific goals
• Use Resources like time, people, money, equipment and facilities, explicitly
allocated to the work
• Follows a planned and organized approach
• Mostly involves a team of people
Project vs Operation
Project Operation
Temporary Ongoing
Unique Repetitive
Ends when objectives are met Does not end even on achieving the objectives
Project Operation
What is project management?
As per Project Management Institute, Inc. (PMI) defines Project Management
as the application of knowledge, skills, tools and techniques to a broad range
of activities in order to meet the requirements of a particular project.
Project Management is the practice of initiating, planning, executing,
controlling and closing the work of a team to achieve specific goals and meet
specific success criteria at the specified time.
The project constraints
The
Project
Scope
TimeCost
Risk Quality
Resources
Project constraints are anything that
restricts or dictates the actions of the project
team.
The triple constraints i.e. time, resources
(cost), and quality (scope) - are the big
hitters, and every project has one or two, if
not all three, of the triple constraints as
a project driver.
The project constraints - 2
• These Triple Constraints, i.e. time, cost and scope, indicate the key factors that two out of
three define the framework of a project, and direct project managers as to where
adjustments would have to be made if one or another of those constraints became
problematic.
• These constraints can also be interpreted as “cheap, fast or good”. This means if you want
to have it cheap (low cost), and fast (short time frame), you would have to settle for limited
scope or lower quality. In the same way, if you wanted it fast and good (high quality with full
scope), then it would cost you. In the third scenario, if the project was expected to run
longer than planned, to bring it back into the desired time frame would require a
compromise on either cost (i.e. spend more money to get it done on time) or scope/quality
(i.e. reduce the scope or settle for lower quality in the form of less features or less quality
checking).
What is the program?
• A program is a group of related projects, subsidiary programs, and program
activities managed in a coordinated way to obtain benefits and control not
available from managing them individually.
• Program management focuses on interdependencies of projects and
describes the best approach to achieve program objectives.
What is a portfolio?
A portfolio is a collection of projects, programs, subsidiary portfolios, and
operations managed as a group to achieve strategic objectives.
Project management processes
• Every project management process produces one or more outputs from one
or more inputs by using appropriate project management tools and
techniques.
Inputs Tools & Techniques Outputs
Process Groups & Knowledge Areas
The Process Groups remain the same in PMBOK’s 6th edition. While, two of
the Knowledge Areas have been renamed - ‘Project Time Management’ and
‘Project Human Resource Management’ are now ‘Project Schedule Management’
and ‘Project Resource Management’ respectively.
Process Groups Knowledge Areas
1. Initiating Process Group 1. Project Integration Management
2. Planning Process Group 2. Project Scope Management
3. Executing Process Group 3. Project Schedule Management
4. Monitor & Controlling Process Group 4. Project Cost Management
5. Closing Process Group 5. Project Quality Management
6. Project Resource Management
7. Project Communication Management
8. Project Risk Management
9. Project Procurement Management
10. Project Stakeholder Management
Mapping of Project Management Process Groups to
the Knowledge Areas - 1
Process Groups
Knowledge Areas
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring & Controlling
Process Group
Closing Process
Group
1. Project
Integration
Management
1.1. Develop Project Charter 1.2. Develop Project Management
Plan
1.3. Direct and Manage Project Work
1.4. Manage Project Knowledge
1.5. Monitor and Control Project
Work
1.6. Perform Integrated Change
Control
1.7. Close Project or Phase
2. Project Scope
Management
2.1. Plan Scope Management
2.2. Collect Requirements
2.3. Define Scope
2.4. Create WBS
2.5. Validate Scope
2.6. Control Scope
3. Project Schedule
Management
3.1. Plan Schedule Management
3.2. Define Activities
3.3. Sequence Activities
3.4. Estimate Activity Durations
3.5. Develop Schedule
3.6. Control Schedules
4. Project Cost
Management
4.1. Plan Cost Management
4.2. Estimate Costs
4.3. Determine Budget
4.4. Control Costs
5. Project Quality
Management
5.1. Plan Quality Management 5.2. Manage Quality 5.3. Control Quality
Mapping of Project Management Process Groups to
the Knowledge Areas - 1
Process Groups
Knowledge Areas
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring & Controlling
Process Group
Closing Process
Group
6. Project Resource
Management
6.1. Plan Resource Management
6.2. Estimate Activity Resources
6.3. Acquire Resources
6.4. Develop Team
6.5. Manage Team
6.6. Control Resources
7. Project
Communications
Management
7.1. Plan Communications
Management
7.2. Manage Communications 7.3. Monitor Communications
8. Project Risk
Management
8.1. Plan Risk Management
8.2. Identify Risks
8.3. Perform Qualitative Risk Analysis
8.4. Perform Quantitative Risk
Analysis
8.5. Plan Risk Responses
8.6. Implement Risk Responses 8.7. Monitor Risks
9. Project
Procurement
Management
9.1. Plan Procurement Management 9.2. Conduct Procurements 9.3. Control Procurements
10. Project
Stakeholder
Management
10.1. Identify Stakeholders 10.2. Plan Stakeholder Engagement 10.3. Manage Stakeholder
Engagement
10.4. Monitor Stakeholder
Engagement
Process Groups & Knowledge Areas
In this way, after introduction of 3 new processes, now there are 49 processes
in total in 6th Edition of PMBOK. These 3 new processes are listed below:
1. Manage Project Knowledge (Executing Process Group & Project
Integration Management Knowledge Area)
2. Implement Risk Responses (Executing Process Group & Project Risk
Management Knowledge Area)
3. Control Resources (Monitoring and Controlling Process Group & Project
Resource Management Knowledge Area)
Renaming of Processes in PMBOK 6
PMBOK 5 PMBOK 6
Perform Quality Assurance Manage Quality
Plan Human Resource Management Plan Resource Management
Acquire Project Team Acquire Resources
Develop Project Team Develop Team
Manage Project Team Manage Team
Control Communications Monitor Communications
Control Risks Monitor Risks
Plan Stakeholder Management Plan Stakeholder Engagement
Control Stakeholder Engagement Monitor Stakeholder Engagement
Another minor changes in Processes
• In PMBOK 6, ‘Estimate Activity Resources’ is now associated with the
Project Resource Management. Earlier in PMBOK 5, it was in the Project
Schedule Management Processes. But, it is still part of the Planning Process
Group.
• The Close Procurement process has been removed and portions have now
been moved to Control Procurements and other portions to the Close
Project or Phase process in the Project Integration Management knowledge
area.
Tailoring
• The selection of appropriate project management processes, inputs, tools,
techniques, outputs and life cycle phases to manage a project is known as
Tailoring.
• Tailoring is necessary because each project is unique. Hence, not necessary
that all of the processes, tools and techniques defined in PMBOK® are
required in every project.
Project Management Office (PMO)
Following are the tasks of a PMO:
• Identifying and developing project management methodology, best practices, and standards.
• Coaching, mentoring, training, and oversight
• Coordinating communication across projects
• Managing shared resources across all projects administered by the PMO
• Monitoring compliance with project management standards, policies, procedures, and
templates by means of project audits
• Developing and managing project policies, procedures, templates, and other shared
documentation

More Related Content

PDF
PDF
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PDF
Project Management Professional (PMP)
PPTX
The IT PMO - A Handbook for Federal Programs
PPT
P3O - a standard for PMO modelling
PPTX
An Introduction to Project Management
PPT
Setting up a pmo
PPTX
PMO Kick-Off Presentation
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
Project Management Professional (PMP)
The IT PMO - A Handbook for Federal Programs
P3O - a standard for PMO modelling
An Introduction to Project Management
Setting up a pmo
PMO Kick-Off Presentation

What's hot (20)

PDF
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PPTX
Rise and fall of project portfolio management triumph&collapse a case study
PDF
50 Planning Fundamentals V5.0 - procedures only
PPSX
PMO-Framework
PDF
The Project Management Plan in 20 steps
PPTX
Instructor Slides - PMP/CAPM PMBOK 6th Edition
PDF
PMO Handbook - How to Plan, Build, and Run a PMO
PDF
PMO Frameworks
PPTX
Project integration management
PDF
PMO - Added value instead of administration
PDF
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
PDF
Setting up a Project Management Office (PMO)
PDF
Pmp risk chapter 11
PPT
Introduction to Project Management
PPTX
The PMO journey
PDF
PMO. Gestión de Proyectos
PDF
Chap 4.1- Develop Project Charter
PDF
PMO and Project Portfolio Management
PDF
PDF
Pmo
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Rise and fall of project portfolio management triumph&collapse a case study
50 Planning Fundamentals V5.0 - procedures only
PMO-Framework
The Project Management Plan in 20 steps
Instructor Slides - PMP/CAPM PMBOK 6th Edition
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Frameworks
Project integration management
PMO - Added value instead of administration
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Setting up a Project Management Office (PMO)
Pmp risk chapter 11
Introduction to Project Management
The PMO journey
PMO. Gestión de Proyectos
Chap 4.1- Develop Project Charter
PMO and Project Portfolio Management
Pmo
Ad

Similar to PMP as per PMBOK 6 (20)

PDF
Day 1 framework
PPTX
Fundamentals of Project Management - Basics
PPT
Project Management V1
PPTX
Day 1 - Poject Management Framework.pptx
PPTX
2) PMT & PIM.pptx
PPTX
PMI Project Management Principles
ODP
Project management 1
PDF
#Project Management fundamentals - By SN Panigrahi
PDF
01 02&03 introduction to pmp-mao
PPTX
pmi project management principles.pptx
PDF
PMI Project Management fundamentos basicos
PDF
PMP Exam Prep_sample slides
PDF
Project management 1
PPT
PmiprojectmanagementprinciplesAmit Payal
PPTX
Project management process and Project Management Knowledge areas
PPT
Pmp Prep Session 1 Overview
PDF
The Art Of Project Management
PPTX
PMBOK(Project Management Body of Knowledge)
PPT
process groups and knowledge areas
Day 1 framework
Fundamentals of Project Management - Basics
Project Management V1
Day 1 - Poject Management Framework.pptx
2) PMT & PIM.pptx
PMI Project Management Principles
Project management 1
#Project Management fundamentals - By SN Panigrahi
01 02&03 introduction to pmp-mao
pmi project management principles.pptx
PMI Project Management fundamentos basicos
PMP Exam Prep_sample slides
Project management 1
PmiprojectmanagementprinciplesAmit Payal
Project management process and Project Management Knowledge areas
Pmp Prep Session 1 Overview
The Art Of Project Management
PMBOK(Project Management Body of Knowledge)
process groups and knowledge areas
Ad

Recently uploaded (20)

PPTX
Women talent hub 😁🥳🤗🤗🎉♊😭👌😊😍🤣😆😁🥰😍
PDF
wadi marwa ppt in detail,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
PPTX
Project presentation about hrm and analysis
PDF
Sales Enablement in the Age of AI: Unlocking Growth
PPTX
EXT.-EDU-809-ACCOUNTABILITY-IN-EXTENSION.pptx
PDF
Peter Oeij - Industry 5.0 for shaping sustainable and inclusive futures
PPTX
HLA_Poland presentation about HOP training
PDF
Leading with Empathy: How Bangladesh Can Build Inclusive Growth
PDF
Discover Electric Car´s Market updated for General Information
PPTX
People Strategies LXP BTS Readiness Plan
PDF
SpatzAI Micro-Conflict Resolution Toolkit - Fairer Teamwork Globally
PDF
Your_Body_is_a_Tuning_Fork_Presentation.pptx.pdf
PDF
Entrepreneurial_Spirit_Among_University_Students_i.pdf
PDF
Dr Usman Zafar Portfolio 2025 - Senior Board Advisor
PDF
SpatzAI Real-time Micro-Conflict Manager - Fairer Teamwork Globally
PDF
Empowering Future Leaders_ The Impact of the ICC National Leadership Summit b...
PPTX
warehousing in material management
PPT
L6 - Diversity and Multicultural Teams.ppt
PPTX
Personnel Management work in medical field
PPTX
Product Tank - August 2025 (CloudFlare)_redux.pptx
Women talent hub 😁🥳🤗🤗🎉♊😭👌😊😍🤣😆😁🥰😍
wadi marwa ppt in detail,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Project presentation about hrm and analysis
Sales Enablement in the Age of AI: Unlocking Growth
EXT.-EDU-809-ACCOUNTABILITY-IN-EXTENSION.pptx
Peter Oeij - Industry 5.0 for shaping sustainable and inclusive futures
HLA_Poland presentation about HOP training
Leading with Empathy: How Bangladesh Can Build Inclusive Growth
Discover Electric Car´s Market updated for General Information
People Strategies LXP BTS Readiness Plan
SpatzAI Micro-Conflict Resolution Toolkit - Fairer Teamwork Globally
Your_Body_is_a_Tuning_Fork_Presentation.pptx.pdf
Entrepreneurial_Spirit_Among_University_Students_i.pdf
Dr Usman Zafar Portfolio 2025 - Senior Board Advisor
SpatzAI Real-time Micro-Conflict Manager - Fairer Teamwork Globally
Empowering Future Leaders_ The Impact of the ICC National Leadership Summit b...
warehousing in material management
L6 - Diversity and Multicultural Teams.ppt
Personnel Management work in medical field
Product Tank - August 2025 (CloudFlare)_redux.pptx

PMP as per PMBOK 6

  • 2. What is PMP? Project Management Professional (PMP) is an internationally recognized professional designation offered by Project Management Institute (PMI). As of March 2018, there are 833,025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide. The exam is based on the PMI Project Management Body of Knowledge (PMBOK), and the prerequisites are: • Secondary degree (high school diploma, associate’s degree or the global equivalent) • 7,500 hours leading and directing projects • 35 hours of project management education OR • Four-year degree • 4,500 hours leading and directing projects • 35 hours of project management education • A candidate who passes the exam and meets the professional requirements is awarded the PMP certification.
  • 3. What is a project? • A temporary endeavour undertaken to create Unique products, services or result. In other way, a project may also be defined as a set of interrelated tasks to be executed over a fixed period and within a certain cost and certain limitations.
  • 4. Features of Project • It has a defined beginning, end, schedule and approach • End results have specific goals • Use Resources like time, people, money, equipment and facilities, explicitly allocated to the work • Follows a planned and organized approach • Mostly involves a team of people
  • 5. Project vs Operation Project Operation Temporary Ongoing Unique Repetitive Ends when objectives are met Does not end even on achieving the objectives Project Operation
  • 6. What is project management? As per Project Management Institute, Inc. (PMI) defines Project Management as the application of knowledge, skills, tools and techniques to a broad range of activities in order to meet the requirements of a particular project. Project Management is the practice of initiating, planning, executing, controlling and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.
  • 7. The project constraints The Project Scope TimeCost Risk Quality Resources Project constraints are anything that restricts or dictates the actions of the project team. The triple constraints i.e. time, resources (cost), and quality (scope) - are the big hitters, and every project has one or two, if not all three, of the triple constraints as a project driver.
  • 8. The project constraints - 2 • These Triple Constraints, i.e. time, cost and scope, indicate the key factors that two out of three define the framework of a project, and direct project managers as to where adjustments would have to be made if one or another of those constraints became problematic. • These constraints can also be interpreted as “cheap, fast or good”. This means if you want to have it cheap (low cost), and fast (short time frame), you would have to settle for limited scope or lower quality. In the same way, if you wanted it fast and good (high quality with full scope), then it would cost you. In the third scenario, if the project was expected to run longer than planned, to bring it back into the desired time frame would require a compromise on either cost (i.e. spend more money to get it done on time) or scope/quality (i.e. reduce the scope or settle for lower quality in the form of less features or less quality checking).
  • 9. What is the program? • A program is a group of related projects, subsidiary programs, and program activities managed in a coordinated way to obtain benefits and control not available from managing them individually. • Program management focuses on interdependencies of projects and describes the best approach to achieve program objectives.
  • 10. What is a portfolio? A portfolio is a collection of projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.
  • 11. Project management processes • Every project management process produces one or more outputs from one or more inputs by using appropriate project management tools and techniques. Inputs Tools & Techniques Outputs
  • 12. Process Groups & Knowledge Areas The Process Groups remain the same in PMBOK’s 6th edition. While, two of the Knowledge Areas have been renamed - ‘Project Time Management’ and ‘Project Human Resource Management’ are now ‘Project Schedule Management’ and ‘Project Resource Management’ respectively.
  • 13. Process Groups Knowledge Areas 1. Initiating Process Group 1. Project Integration Management 2. Planning Process Group 2. Project Scope Management 3. Executing Process Group 3. Project Schedule Management 4. Monitor & Controlling Process Group 4. Project Cost Management 5. Closing Process Group 5. Project Quality Management 6. Project Resource Management 7. Project Communication Management 8. Project Risk Management 9. Project Procurement Management 10. Project Stakeholder Management
  • 14. Mapping of Project Management Process Groups to the Knowledge Areas - 1 Process Groups Knowledge Areas Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 1. Project Integration Management 1.1. Develop Project Charter 1.2. Develop Project Management Plan 1.3. Direct and Manage Project Work 1.4. Manage Project Knowledge 1.5. Monitor and Control Project Work 1.6. Perform Integrated Change Control 1.7. Close Project or Phase 2. Project Scope Management 2.1. Plan Scope Management 2.2. Collect Requirements 2.3. Define Scope 2.4. Create WBS 2.5. Validate Scope 2.6. Control Scope 3. Project Schedule Management 3.1. Plan Schedule Management 3.2. Define Activities 3.3. Sequence Activities 3.4. Estimate Activity Durations 3.5. Develop Schedule 3.6. Control Schedules 4. Project Cost Management 4.1. Plan Cost Management 4.2. Estimate Costs 4.3. Determine Budget 4.4. Control Costs 5. Project Quality Management 5.1. Plan Quality Management 5.2. Manage Quality 5.3. Control Quality
  • 15. Mapping of Project Management Process Groups to the Knowledge Areas - 1 Process Groups Knowledge Areas Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 6. Project Resource Management 6.1. Plan Resource Management 6.2. Estimate Activity Resources 6.3. Acquire Resources 6.4. Develop Team 6.5. Manage Team 6.6. Control Resources 7. Project Communications Management 7.1. Plan Communications Management 7.2. Manage Communications 7.3. Monitor Communications 8. Project Risk Management 8.1. Plan Risk Management 8.2. Identify Risks 8.3. Perform Qualitative Risk Analysis 8.4. Perform Quantitative Risk Analysis 8.5. Plan Risk Responses 8.6. Implement Risk Responses 8.7. Monitor Risks 9. Project Procurement Management 9.1. Plan Procurement Management 9.2. Conduct Procurements 9.3. Control Procurements 10. Project Stakeholder Management 10.1. Identify Stakeholders 10.2. Plan Stakeholder Engagement 10.3. Manage Stakeholder Engagement 10.4. Monitor Stakeholder Engagement
  • 16. Process Groups & Knowledge Areas In this way, after introduction of 3 new processes, now there are 49 processes in total in 6th Edition of PMBOK. These 3 new processes are listed below: 1. Manage Project Knowledge (Executing Process Group & Project Integration Management Knowledge Area) 2. Implement Risk Responses (Executing Process Group & Project Risk Management Knowledge Area) 3. Control Resources (Monitoring and Controlling Process Group & Project Resource Management Knowledge Area)
  • 17. Renaming of Processes in PMBOK 6 PMBOK 5 PMBOK 6 Perform Quality Assurance Manage Quality Plan Human Resource Management Plan Resource Management Acquire Project Team Acquire Resources Develop Project Team Develop Team Manage Project Team Manage Team Control Communications Monitor Communications Control Risks Monitor Risks Plan Stakeholder Management Plan Stakeholder Engagement Control Stakeholder Engagement Monitor Stakeholder Engagement
  • 18. Another minor changes in Processes • In PMBOK 6, ‘Estimate Activity Resources’ is now associated with the Project Resource Management. Earlier in PMBOK 5, it was in the Project Schedule Management Processes. But, it is still part of the Planning Process Group. • The Close Procurement process has been removed and portions have now been moved to Control Procurements and other portions to the Close Project or Phase process in the Project Integration Management knowledge area.
  • 19. Tailoring • The selection of appropriate project management processes, inputs, tools, techniques, outputs and life cycle phases to manage a project is known as Tailoring. • Tailoring is necessary because each project is unique. Hence, not necessary that all of the processes, tools and techniques defined in PMBOK® are required in every project.
  • 20. Project Management Office (PMO) Following are the tasks of a PMO: • Identifying and developing project management methodology, best practices, and standards. • Coaching, mentoring, training, and oversight • Coordinating communication across projects • Managing shared resources across all projects administered by the PMO • Monitoring compliance with project management standards, policies, procedures, and templates by means of project audits • Developing and managing project policies, procedures, templates, and other shared documentation