PMP – 49 Processes (Chart prepared by Anand Bobade)
Initiating (2) Planning (24) Executing (8) Monitoring & Controlling (11) Closing (2)
Chap 4-Project Integration
Management (7)
Chap 5-Project Scope
Management (6)
Chap6-Project Schedule
Management (6)
Develop Project
Charter
Develop Project
Management plan
Direct and Manage
Project work
Manage Knowledge
Monitor & Control
Project Work
Perform Integrated
change Control
Close Project or
phase
Plan scope
management
Collect
Requirements
Define Scope Create WBS
Validate Scope
Control Scope
Plan Schedule
management
Define Activities
Sequence
Activities
Estimate Activity
Duration
DevelopSchedule
Control Schedule
Chap7-Project Cost
Management (4)
Chap8-Project Quality
Management (3)
Chap 9- Resource
Management (6)
Chap10-Project Comm.
Management(3)
Plan Cost
management
Estimate Cost
Determine Budget
Control Cost
Plan Quality
management
Manage Quality Control Quality
Plan Resource
management
Estimate Activity
Resources
Acquire
Resources
DevelopTeam
Manage Team
Control Resources
Plan Communication
Manage
Communication
Monitor
Communication
Chap 11-Project Risk
Management(7)
Chap 12 - Project
Procurement Manag. (3)
Chap 13 - Project
Stakeholder Manag. (4)
Anand Bobade (nmbobade@gmail.com, 055 5932004)
❑https://ae.linkedin.com/in/anandbobade
❑http://www.slideshare.net/anandbobade
❑Conduct online training, Corporate Training & weekend workshops.
Plan Risk
management
Identify Risk
Perform Qualitative
Risk Analysis
Perform
Quantitative Risk
Analysis
Plan Risk Response
Implement Risk
Response
Monitor Risk
Plan Procurement
Management
Conduct Procurement Control Procurement
Identify
Stakeholders
Plan Stakeholder
Engagement
Manage Stakeholder
Engagement
Monitor Stakeholder
Engagement
Links to all 49 processes Presentations Links to YouTube videos
Chap 4 - Integration:
https://www.slideshare.net/anandbobade/chap-40-project-integration-management-overview
https://www.slideshare.net/anandbobade/chap-41-develop-project-charter
https://www.slideshare.net/anandbobade/chap-42-develop-project-management-plan
https://www.slideshare.net/anandbobade/chap-43-direct-and-manage-project-work
https://www.slideshare.net/anandbobade/pmp-chap44project-integration-management-manageknowledge
https://www.slideshare.net/anandbobade/chap-45-monitor-and-control-project-work
https://www.slideshare.net/anandbobade/chap-46-perform-integrated-change-control
https://www.slideshare.net/anandbobade/chap-47-project-or-phase-close
https://youtu.be/NdzADFfoRxA
https://youtu.be/t3SDco3qVcM
https://youtu.be/jeI9yQcLVGc
https://youtu.be/V6hONGx0D0A
https://youtu.be/VLTHz_P4EvM
https://youtu.be/N4Fz-OsIjTg
https://youtu.be/Jv9Y9EjActo
https://youtu.be/egi7ot2yB3w
Chap 5 - Scope:
https://www.slideshare.net/anandbobade/pmp-chap-50-scope-management-overview
https://www.slideshare.net/anandbobade/chap-51-plan-scope-management
https://www.slideshare.net/anandbobade/chap-52-collect-requirements
https://www.slideshare.net/anandbobade/chap-53-define-scope
https://www.slideshare.net/anandbobade/chap-54-create-wbs
https://www.slideshare.net/anandbobade/chap-55-validate-scope
https://www.slideshare.net/anandbobade/chap-56-control-scope
https://youtu.be/9u6f2NXlGnI
https://youtu.be/uLVUppKclUI
https://youtu.be/ngu-IMGCeSE
https://youtu.be/WByDRHROjZw
https://youtu.be/-Nu8ENRZ09M
https://youtu.be/Q5OhVv-x4eo
https://youtu.be/1g39Jpmw-94
Chap 6: Schedule:
https://www.slideshare.net/anandbobade/chap-60-schedule-management-overview
https://www.slideshare.net/anandbobade/chap-61-plan-schedule-management
https://www.slideshare.net/anandbobade/chap-62-define-activity
https://www.slideshare.net/anandbobade/chap-63-sequence-activity
https://www.slideshare.net/anandbobade/chap-64-estimate-activity-duration
https://www.slideshare.net/anandbobade/chap-65-define-schedule
https://www.slideshare.net/anandbobade/chap-66-control-schedule
Chap 7: Cost:
https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview
https://www.slideshare.net/anandbobade/chap-71-plan-cost-management
https://www.slideshare.net/anandbobade/chap-72-estimate-cost
https://www.slideshare.net/anandbobade/chap-73-determine-budget
https://www.slideshare.net/anandbobade/chap-74-control-cost
Chap 8: Quality:
https://www.slideshare.net/anandbobade/chap-80-quality-management-overview
https://www.slideshare.net/anandbobade/chap-81-plan-quality-management
https://www.slideshare.net/anandbobade/chap-82-manage-quality
https://www.slideshare.net/anandbobade/chap-83-control-quality
https://youtu.be/8zteKSxDyt4
https://youtu.be/tL32SJV-dWA
https://youtu.be/6laO93g0e6o
https://youtu.be/EnC0E_QXPdo
Chap 9: Resource:
https://www.slideshare.net/anandbobade/chap-90-project-resource-management-overview
https://www.slideshare.net/anandbobade/chap-91-pan-resource-management
https://www.slideshare.net/anandbobade/chap-92-estimate-activity-resource
https://www.slideshare.net/anandbobade/chap-93-acquire-resources
https://www.slideshare.net/anandbobade/chap-94-develop-team
https://www.slideshare.net/anandbobade/chap-95-manage-team
https://www.slideshare.net/anandbobade/chap-96-control-resources
Chap 10: Communication:
https://www.slideshare.net/anandbobade/chap-100-project-communication-management-overview
https://www.slideshare.net/anandbobade/chap-101-plan-communication-management
https://www.slideshare.net/anandbobade/chap-102-manage-communication
https://www.slideshare.net/anandbobade/chap-103-monitor-communication
Chap 11 – Risk:
https://www.slideshare.net/anandbobade/chap-110-project-risk-management-overview-143496876
https://www.slideshare.net/anandbobade/chap-111-plan-risk-management-143497221
https://www.slideshare.net/anandbobade/chap-112-identify-risks-143497237
https://www.slideshare.net/anandbobade/chap-113-perform-qualitative-risk-analysis
https://www.slideshare.net/anandbobade/chap-114-perform-quantitative-risk-analysis
https://www.slideshare.net/anandbobade/chap-115-plan-risk-response-143497289
https://www.slideshare.net/anandbobade/chap-116-implement-risk-response-143497303
https://www.slideshare.net/anandbobade/chap-117-monitor-risks-143497342
Chap 12 – Procurement:
https://www.slideshare.net/anandbobade/chap-120-procurement-management-overview
https://www.slideshare.net/anandbobade/chap-121-plan-procurement-management
https://www.slideshare.net/anandbobade/chap-122-conduct-procurement
https://www.slideshare.net/anandbobade/chap-123-control-procurement
Chap 13 - Stakeholder
https://www.slideshare.net/anandbobade/chap-130-project-stakeholder-management-overview-141174203
https://www.slideshare.net/anandbobade/chap-131-identify-stakeholders
https://www.slideshare.net/anandbobade/chap-132-plan-stakeholder-engagement-141174396
https://www.slideshare.net/anandbobade/chap-133-manage-stakeholder
https://www.slideshare.net/anandbobade/chap-134-monitor-stakeholder
https://youtu.be/Vhjc6T9R4d8
https://youtu.be/QjNzwwSXlBY
https://youtu.be/29Xt2r1ufZQ
https://youtu.be/ZrNg-NiJVfk
https://youtu.be/bXX5t1Jjh_M

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Youtube videos

  • 1.
    PMP – 49Processes (Chart prepared by Anand Bobade) Initiating (2) Planning (24) Executing (8) Monitoring & Controlling (11) Closing (2) Chap 4-Project Integration Management (7) Chap 5-Project Scope Management (6) Chap6-Project Schedule Management (6) Develop Project Charter Develop Project Management plan Direct and Manage Project work Manage Knowledge Monitor & Control Project Work Perform Integrated change Control Close Project or phase Plan scope management Collect Requirements Define Scope Create WBS Validate Scope Control Scope Plan Schedule management Define Activities Sequence Activities Estimate Activity Duration DevelopSchedule Control Schedule
  • 2.
    Chap7-Project Cost Management (4) Chap8-ProjectQuality Management (3) Chap 9- Resource Management (6) Chap10-Project Comm. Management(3) Plan Cost management Estimate Cost Determine Budget Control Cost Plan Quality management Manage Quality Control Quality Plan Resource management Estimate Activity Resources Acquire Resources DevelopTeam Manage Team Control Resources Plan Communication Manage Communication Monitor Communication
  • 3.
    Chap 11-Project Risk Management(7) Chap12 - Project Procurement Manag. (3) Chap 13 - Project Stakeholder Manag. (4) Anand Bobade ([email protected], 055 5932004) ❑https://ae.linkedin.com/in/anandbobade ❑http://www.slideshare.net/anandbobade ❑Conduct online training, Corporate Training & weekend workshops. Plan Risk management Identify Risk Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Response Implement Risk Response Monitor Risk Plan Procurement Management Conduct Procurement Control Procurement Identify Stakeholders Plan Stakeholder Engagement Manage Stakeholder Engagement Monitor Stakeholder Engagement
  • 4.
    Links to all49 processes Presentations Links to YouTube videos Chap 4 - Integration: https://www.slideshare.net/anandbobade/chap-40-project-integration-management-overview https://www.slideshare.net/anandbobade/chap-41-develop-project-charter https://www.slideshare.net/anandbobade/chap-42-develop-project-management-plan https://www.slideshare.net/anandbobade/chap-43-direct-and-manage-project-work https://www.slideshare.net/anandbobade/pmp-chap44project-integration-management-manageknowledge https://www.slideshare.net/anandbobade/chap-45-monitor-and-control-project-work https://www.slideshare.net/anandbobade/chap-46-perform-integrated-change-control https://www.slideshare.net/anandbobade/chap-47-project-or-phase-close https://youtu.be/NdzADFfoRxA https://youtu.be/t3SDco3qVcM https://youtu.be/jeI9yQcLVGc https://youtu.be/V6hONGx0D0A https://youtu.be/VLTHz_P4EvM https://youtu.be/N4Fz-OsIjTg https://youtu.be/Jv9Y9EjActo https://youtu.be/egi7ot2yB3w Chap 5 - Scope: https://www.slideshare.net/anandbobade/pmp-chap-50-scope-management-overview https://www.slideshare.net/anandbobade/chap-51-plan-scope-management https://www.slideshare.net/anandbobade/chap-52-collect-requirements https://www.slideshare.net/anandbobade/chap-53-define-scope https://www.slideshare.net/anandbobade/chap-54-create-wbs https://www.slideshare.net/anandbobade/chap-55-validate-scope https://www.slideshare.net/anandbobade/chap-56-control-scope https://youtu.be/9u6f2NXlGnI https://youtu.be/uLVUppKclUI https://youtu.be/ngu-IMGCeSE https://youtu.be/WByDRHROjZw https://youtu.be/-Nu8ENRZ09M https://youtu.be/Q5OhVv-x4eo https://youtu.be/1g39Jpmw-94 Chap 6: Schedule: https://www.slideshare.net/anandbobade/chap-60-schedule-management-overview https://www.slideshare.net/anandbobade/chap-61-plan-schedule-management https://www.slideshare.net/anandbobade/chap-62-define-activity https://www.slideshare.net/anandbobade/chap-63-sequence-activity https://www.slideshare.net/anandbobade/chap-64-estimate-activity-duration https://www.slideshare.net/anandbobade/chap-65-define-schedule https://www.slideshare.net/anandbobade/chap-66-control-schedule Chap 7: Cost: https://www.slideshare.net/anandbobade/chap-70-project-cost-management-overview https://www.slideshare.net/anandbobade/chap-71-plan-cost-management https://www.slideshare.net/anandbobade/chap-72-estimate-cost https://www.slideshare.net/anandbobade/chap-73-determine-budget https://www.slideshare.net/anandbobade/chap-74-control-cost Chap 8: Quality: https://www.slideshare.net/anandbobade/chap-80-quality-management-overview https://www.slideshare.net/anandbobade/chap-81-plan-quality-management https://www.slideshare.net/anandbobade/chap-82-manage-quality https://www.slideshare.net/anandbobade/chap-83-control-quality https://youtu.be/8zteKSxDyt4 https://youtu.be/tL32SJV-dWA https://youtu.be/6laO93g0e6o https://youtu.be/EnC0E_QXPdo Chap 9: Resource: https://www.slideshare.net/anandbobade/chap-90-project-resource-management-overview https://www.slideshare.net/anandbobade/chap-91-pan-resource-management https://www.slideshare.net/anandbobade/chap-92-estimate-activity-resource https://www.slideshare.net/anandbobade/chap-93-acquire-resources https://www.slideshare.net/anandbobade/chap-94-develop-team
  • 5.
    https://www.slideshare.net/anandbobade/chap-95-manage-team https://www.slideshare.net/anandbobade/chap-96-control-resources Chap 10: Communication: https://www.slideshare.net/anandbobade/chap-100-project-communication-management-overview https://www.slideshare.net/anandbobade/chap-101-plan-communication-management https://www.slideshare.net/anandbobade/chap-102-manage-communication https://www.slideshare.net/anandbobade/chap-103-monitor-communication Chap11 – Risk: https://www.slideshare.net/anandbobade/chap-110-project-risk-management-overview-143496876 https://www.slideshare.net/anandbobade/chap-111-plan-risk-management-143497221 https://www.slideshare.net/anandbobade/chap-112-identify-risks-143497237 https://www.slideshare.net/anandbobade/chap-113-perform-qualitative-risk-analysis https://www.slideshare.net/anandbobade/chap-114-perform-quantitative-risk-analysis https://www.slideshare.net/anandbobade/chap-115-plan-risk-response-143497289 https://www.slideshare.net/anandbobade/chap-116-implement-risk-response-143497303 https://www.slideshare.net/anandbobade/chap-117-monitor-risks-143497342 Chap 12 – Procurement: https://www.slideshare.net/anandbobade/chap-120-procurement-management-overview https://www.slideshare.net/anandbobade/chap-121-plan-procurement-management https://www.slideshare.net/anandbobade/chap-122-conduct-procurement https://www.slideshare.net/anandbobade/chap-123-control-procurement Chap 13 - Stakeholder https://www.slideshare.net/anandbobade/chap-130-project-stakeholder-management-overview-141174203 https://www.slideshare.net/anandbobade/chap-131-identify-stakeholders https://www.slideshare.net/anandbobade/chap-132-plan-stakeholder-engagement-141174396 https://www.slideshare.net/anandbobade/chap-133-manage-stakeholder https://www.slideshare.net/anandbobade/chap-134-monitor-stakeholder https://youtu.be/Vhjc6T9R4d8 https://youtu.be/QjNzwwSXlBY https://youtu.be/29Xt2r1ufZQ https://youtu.be/ZrNg-NiJVfk https://youtu.be/bXX5t1Jjh_M