General Perspective
• The consequence of well insulated pipelines in High Voltage AC
corridors resulted in pipelines suffering high current loads of AC as a
byproduct of inductive, capacitive, and direct coupling issues with
the power lines.
• The pipeline basically is now a secondary winding of a gigantic
transformer, with the AC power line as the primary winding.
• Voltages induced into the pipeline go in the opposite direction to
those in the powerline.
• These voltages can build to voltage levels that can become safety
hazards, and the current values of the pipe line can result in
corrosion to the pipe walls by AC Corrosion
• AC Corrosion is not yet a clearly defined process, however, it does
have some characteristic indications that are commonly associated
with it from field inspections.
3SAE Inc.
High Voltages Go To Ground
• Note the burned area
where high voltage
spikes jumped to
ground through the
connection provided to
the mounting pipe by
the backplate bolt.
• Indication is the
pipeline may need AC
Mitigation.
What is Meant by AC Current Density?
• The current density level is important, not
necessarily in the pipeline itself, but at the point
of discharge from the pipeline into the soil.
• Reported data from field inspections have shown
a range of AC current densities of 0 to 20A/m2
are not involved with AC corrosion. From
20A/m2 to 100A/m2 there may be an
involvement, while levels over 100A/m2 are
strongly indicated to have AC corrosion active.
5SAE Inc.
What affects the AC Current Density?
• High soil resistivities are an enhancement to protect
the pipeline by lowering the current density.
• Low soil resistivities allow higher current densities as
the current flow away from the coating anomaly is
enhanced.
• The size of the defect is critically important. Densities
of current from a scrape of several inches in length will
have lower current densities. While a small defect in
the coating, such as made by a grain of sand in the
coating will have much higher current densities as the
current is being pushed from a much smaller cross
sectional area.
6SAE Inc.
Further AC Current Density
• The availability of the current in the pipeline is also a major
factor. If the pipeline is in a corridor with low AC current
power lines, the critical current densities may be too low
induced in the pipeline to be an issue, while large tower
like lines with high voltages may indeed be involved with it.
Each case is different, which points strongly to the need of
field measurements and accurate modeling.
• Normally a length of pipe should be running parallel to an
HVAC system to induce high current loads, but not always.
In some crossings of shallow angles, these currents can still
be achieved.
• There is an “end effect” situation as well, where current
tries to preferentially leave the pipeline near the point of its
deviations from being parallel
SAE Inc. 7
Examples – Look For the Characteristic
Shapes
8SAE Inc.
How is AC Safety Mitigated?
• Locations of pipe to soil test leads, and any surface pipeline
appurtenance can be measured to determine locations of possibly
high enough voltage to require mitigation for safety. Accurate
modeling will also disclose areas of expected safety issues.
• These locations can be mitigated with short runs of material that
can permanently shunt the current to the power line ground system
economically.
• Step potentials must be considered in these areas, and normally,
step potential mats are indicated in all locations of surface pipe
appurtenances such as block valves and risers to protect personnel
• All Test Lead contacts in high potential power line ROW parallel
systems should be dead face front style to prevent contact with
personnel. Covers are also indicated as further assurance of
protection from public interaction in areas of high population
densities.
9SAE Inc.
How are AC Corrosion Issues
Mitigated?
• A cookie cutter approach may be used, but cannot be assured of
success as there may be areas that have not been modeled and
found that can have significant issues of AC corrosion that may not
be covered by short isolated segments of parallel or deep well
drains.
• Areas for spot installations or longer runs of material may be
disclosed by a good interpretation of the topography, and looking
for areas of divergence and convergence between the pipeline and
the power lines involved.
• Areas of known high current density may be generally indicated at
major divergence points, and near power line substations, but many
others may be on the line, and not discovered without field surveys
and appropriate modeling of the systems. It is strongly suggested
any line with discovered AC corrosion wall losses should be
modeled and an appropriate complete system installation designed
and proposed for consideration.
10SAE Inc.
How is AC Mitigated?
• Have a survey company that can efficiently do all field
surveys required for modeling the line.
• Use appropriate (CDEGS/ROW) modeling software
especially for complex multiple power line ROW and
pipeline issues.
• Consider two methods of AC mitigation, linear system
beside the pipeline and/or deep point drains for
concentrated areas of impact. A combination may be best.
• Isolate your CP system by using decouplers to isolate from
the cathodic protection system, but capable of handling the
AC drainage currents indicated.
• Consider using a solid forming conductive backfill to
enhance performance and life of the system.
11SAE Inc.
Field Installations of Linear AC Drains
SAE Inc. 12
Ripper Installation
SAE Inc. Page 13
SAE Inc. Page 14
Solid Media Backfill – Ground
Enhancement
• Diagram of an AC Mitigation electrode
as installed:
– A large copper core is encapsulated in a
conductive solid forming backfill
– When set up, the AC Mitigation
electrode becomes a single, solid
conductor with a large surface area able
to safely dissipate large amounts of
current
– The electrode system protects the
copper core from corrosion and
deterioration, thus extending the
operational lifetime by 10 times normal
– The backfill reduces system impedance
to allow faster current flow in peak
conditions
A 42” Gas Transmission Line
• The line is in Eastern Texas, running eastward
• The line is parallel to high tension lines for 40
miles
• The area was modeled using CDEGS Software
from data on the location prior to construction
• The AC Mitigation system was installed per the
modeling during the construction phase.
• The results are most areas are below 1 volt AC
• The highest single point location is 5.4 VAC.
SAE Inc. 15
Results Copper/Conductive Concrete
SAE Inc. Page 16
0.000
1.000
2.000
3.000
4.000
5.000
6.000
1
12
23
34
45
56
67
78
89
100
111
122
133
144
155
166
177
188
199
210
221
232
243
254
265
276
287
298
309
320
331
342
353
364
375
386
397
408
419
430
Series1
Wire in solid backfill, Bare, Bare no
backfill, Exposure 10 years
SAE Inc. Page 17
Point Drains
SAE Inc. 18
Point Drain AC Mitigation
• Point drains are effective for localized problems
or intense AC drains are needed
• Point drains are excellent alternatives when there
is no ROW for long length linear AC Mitigation
systems
• Deep soil resistivities are important in the design
of these installations
• Some specific locations best for point drains are
areas near power substations, and shallow angle
crossings of pipelines by High Tension lines
SAE Inc. 19
Solid Media Backfill
• Conductive concrete has a resistivity of 3 ohm/cm
• It is hygroscopic and will absorb and retain moisture
• It has been used to enhance grounding systems for over 100 years
• It reduces impedance and resistance of AC mitigation systems and
enhances their ability to pass current to the earth, including when
appropriately designed and installed, Fault and lightning currents.
• The backfill reduces impedance significantly to improve the rapidity
of current drain of AC, during faults or lightning surges.
• It reduces the electrolytic corrosion process of copper by over 85%,
extending copper life to 50 years or more in AC Mitigation service.
• Point drains use a bare copper wire in a drilled open hole, filled
with conductive concrete, and connected to the pipeline by a DC
decoupler.
SAE Inc. 20
AC Interaction on Municipal Lines
• A common misconception is that there is no need
for AC Mitigation on city mains or small intrastate
pipeline systems.
• AC can be induced to high levels on these lines
even from low municipal AC systems.
• Key locations may be
– New well coated lines parallel to AC systems
– Passing by an HVAC Substation
– Buried AC Systems crossing at shallow angles and little
separation from the pipeline
SAE Inc. 21
Point Drains/Linears in Kansas
• The location was near a power sub station
• The company had installed zinc ribbon and
bare copper wire tests and tested copper wire
with conductive concrete backfill
• Prior to installation of the point drains, an AC
Current Density monitor coupon was installed
• The AC voltage decreased below safety levels
and the current dropped to below AC
Corrosion levels using these Point Drains.
SAE Inc. 22
Model Results
• The models presented are to show the
unmitigated Voltage and Current ranges in
their current status and in their post mitigated
status.
• These models were produced using the
available information from the facility owner,
the power line company, and field inspections
of the areas concerned.
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case Histories
Presentation: AC Mitigation Case Histories
Point Drains in SE Kansas
SAE Inc. 28
15.22
14.42
2.25
7.55
16.75
14.61
12.72
10.93 10.85
3.98
0.968
1.54
3.74
1.91
4.78
0.397
0.773
3.11
6.44
10.04
3.5
1.42
0.83 0.946 0.782 0.513 0.822
1.21 1.05
0.404
0
2
4
6
8
10
12
14
16
18
ACPSP
Mile Post
No AC Mitigation
With AC Mitigation
Current Density WO/With Point Drains
SAE Inc. 29
101
14
7 5
15
104
76
92
31
11
2
5
25
11
53 1
9
4
8
25
8 7
3 2 1 3
8 6
10
20
40
60
80
100
120
CurrentDensity
Mile Post
No AC mitigation
With AC mitigation
Mitigation Target < 20 a/m2
Would your AC Mitigation System
Survive?
SAE Inc. 31
Questions or Comments
• For technical support contact
Mike Ames
SAE Inc. VP Engineering
Humble, TX
713 598 7042
www.saeinc.com
32SAE Inc.

More Related Content

PPTX
2012 FEPA Presentation: Ted Huck
PDF
Presentation: Induced AC Mitigation for Safety and Corrosion Control
PDF
Development of Over-Line Survey Systems for Monitoring Pipelines v1.0 - uploa...
PPT
PDF
Your electrical safety specilist for all equipments Powered AC and DC
PDF
Grounding and bonding testing
PPTX
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
PPTX
Advancements cathodic protection for on grade storage tanks
2012 FEPA Presentation: Ted Huck
Presentation: Induced AC Mitigation for Safety and Corrosion Control
Development of Over-Line Survey Systems for Monitoring Pipelines v1.0 - uploa...
Your electrical safety specilist for all equipments Powered AC and DC
Grounding and bonding testing
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
Advancements cathodic protection for on grade storage tanks

What's hot (20)

PDF
Assuring Reliability of Critical Power Cable Systems
PDF
Insulation testing of power cable
PPT
Factors considered for High Voltage Cable Joint design
PPT
Extra High Voltage Underground Power Cable
PPTX
UNDERGROUND HIGH POWER TRANSMISSION LINES
PPTX
Cable installation book
PDF
Starting First
PDF
EE2353 / High Voltage Engineering - Testing of Cables
PDF
Follow India national building code(NBC2016) for electrical installation and ...
PPTX
Overhead line work ppt
PPTX
underground cable in transmission grid
PDF
Transformer Failure Due to Circuit Breaker Induced Switching Transients
PDF
E2 earthing manual earth guidance notes
PDF
Tes p-122.10-r0 (1)
PPT
underground presentation
PPTX
1.8 overhead vs underground system
PPTX
Cable Sizing Calculations
PPTX
Three core extra high voltage cable – a global innovation
PDF
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Assuring Reliability of Critical Power Cable Systems
Insulation testing of power cable
Factors considered for High Voltage Cable Joint design
Extra High Voltage Underground Power Cable
UNDERGROUND HIGH POWER TRANSMISSION LINES
Cable installation book
Starting First
EE2353 / High Voltage Engineering - Testing of Cables
Follow India national building code(NBC2016) for electrical installation and ...
Overhead line work ppt
underground cable in transmission grid
Transformer Failure Due to Circuit Breaker Induced Switching Transients
E2 earthing manual earth guidance notes
Tes p-122.10-r0 (1)
underground presentation
1.8 overhead vs underground system
Cable Sizing Calculations
Three core extra high voltage cable – a global innovation
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Ad

Similar to Presentation: AC Mitigation Case Histories (20)

PPTX
AC Interference Analysis and Mitigation
PPTX
AC Interference on Buried Pipelines and its Mitigation
PPT
2012 FEPA Presentation: Jeff Didas
PDF
Presentation: Induced AC Interference, Corrosion & Mitigation
PDF
Reasons utilities are switching to high-performance overhead conductors
PDF
Ac corrosion-booklet-44-pagg
PPT
PPTX
Transmission and Distribution - Line parameters.pptx
PDF
Power System I Chapt 3.pdf
PPTX
introduction on high voltage engineering
PDF
Controlled sine wave front end ac drives
PDF
NEI Underground Presentation 06-09-09 (1).pdf
PPT
Report 909
PPTX
Transmission Line Constraints
PDF
grid sub-station training Report
PDF
UEP_Bulletin_1724E-200.pdf
PPTX
PPTX
PPTX
Ppt 120221105321-phpapp02
PPTX
Comparison of AC and DC.pptx
AC Interference Analysis and Mitigation
AC Interference on Buried Pipelines and its Mitigation
2012 FEPA Presentation: Jeff Didas
Presentation: Induced AC Interference, Corrosion & Mitigation
Reasons utilities are switching to high-performance overhead conductors
Ac corrosion-booklet-44-pagg
Transmission and Distribution - Line parameters.pptx
Power System I Chapt 3.pdf
introduction on high voltage engineering
Controlled sine wave front end ac drives
NEI Underground Presentation 06-09-09 (1).pdf
Report 909
Transmission Line Constraints
grid sub-station training Report
UEP_Bulletin_1724E-200.pdf
Ppt 120221105321-phpapp02
Comparison of AC and DC.pptx
Ad

More from Marcellus Drilling News (20)

PDF
Five facts about shale: it’s coming back, and coming back strong
PDF
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
PDF
Access Northeast Pipeline Project - Dec 2016 Update
PDF
Rover Pipeline Letter to FERC Requesting Final Certificate
PDF
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
PDF
LSE Study: Fracking is Revitalizing U.S. Manufacturing
PDF
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
PDF
Report: New U.S. Power Costs: by County, with Environmental Externalities
PDF
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
PDF
U.S. EIA's Drilling Productivity Report - December 2015
PDF
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
PDF
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PDF
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PDF
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PDF
US EIA's December 2016 Short-Term Energy Outlook
PDF
Northeast Gas Association's 2016 Statistical Guide
PDF
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PDF
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
PDF
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
PDF
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
Five facts about shale: it’s coming back, and coming back strong
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Access Northeast Pipeline Project - Dec 2016 Update
Rover Pipeline Letter to FERC Requesting Final Certificate
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
LSE Study: Fracking is Revitalizing U.S. Manufacturing
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Report: New U.S. Power Costs: by County, with Environmental Externalities
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. EIA's Drilling Productivity Report - December 2015
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP: Methane Reduction Strategies for Natural Gas Operations
US EIA's December 2016 Short-Term Energy Outlook
Northeast Gas Association's 2016 Statistical Guide
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project

Recently uploaded (20)

PPTX
British Colonialism in the Subcontinent.pptx
PDF
Houston City Life - Intown Magazine
PDF
Beyond the Buzz: Consumer Tech and Lifestyle Innovations
PDF
White House fires CDC director who says RFK Jr. is "weaponizing public health"
PDF
30082025_First India Newspaper Jaipur.pdf
DOC
买USF毕业证学历认证,卡罗大学毕业证本科/硕士学位
PDF
ORIGIN-HISTORY-METAPHORS-OF-GLOBALIZATION.pdf
PDF
B. Flight Log_Released in U.S. v. Maxwell_Part6_0.pdf
DOC
哪里买MCAD毕业证学历认证,加利福尼亚州立理工大学洪堡分校毕业证成绩单图片
PDF
SOLUTIONS TO THE GEOPOLITICAL SECURITY THREATS.pdf
PPTX
Thailand Fashion Week 2025 Set to Ignite Bangkok with Daring Spring-Summer 20...
PDF
How-to-Make-India-Better-A-Vision-for-Holistic-Progress.pdf
DOCX
Coinography: Breaking Down the Latest Cryptocurrency and Bitcoin News
PDF
The Blogs_ Israel's Doctrine of Deterrence and Survival _ Andy Blumenthal _ T...
DOC
办理UofM毕业证学历认证,克莱顿州立大学毕业证国外硕士毕业证
PPTX
Political ideologies ann their values and characteristics
PPTX
Haitian Revolution presentation 1804 YO Z
PPTX
Thai Women Hosts Redefine Hospitality as Empowerment.
PPTX
A Reference Powerpoint on The History of Armoured Vehicles in WW2. Vol 1
PPTX
Thailand and India Shine at PATA Travel Mart 2025 in Bangkok.
British Colonialism in the Subcontinent.pptx
Houston City Life - Intown Magazine
Beyond the Buzz: Consumer Tech and Lifestyle Innovations
White House fires CDC director who says RFK Jr. is "weaponizing public health"
30082025_First India Newspaper Jaipur.pdf
买USF毕业证学历认证,卡罗大学毕业证本科/硕士学位
ORIGIN-HISTORY-METAPHORS-OF-GLOBALIZATION.pdf
B. Flight Log_Released in U.S. v. Maxwell_Part6_0.pdf
哪里买MCAD毕业证学历认证,加利福尼亚州立理工大学洪堡分校毕业证成绩单图片
SOLUTIONS TO THE GEOPOLITICAL SECURITY THREATS.pdf
Thailand Fashion Week 2025 Set to Ignite Bangkok with Daring Spring-Summer 20...
How-to-Make-India-Better-A-Vision-for-Holistic-Progress.pdf
Coinography: Breaking Down the Latest Cryptocurrency and Bitcoin News
The Blogs_ Israel's Doctrine of Deterrence and Survival _ Andy Blumenthal _ T...
办理UofM毕业证学历认证,克莱顿州立大学毕业证国外硕士毕业证
Political ideologies ann their values and characteristics
Haitian Revolution presentation 1804 YO Z
Thai Women Hosts Redefine Hospitality as Empowerment.
A Reference Powerpoint on The History of Armoured Vehicles in WW2. Vol 1
Thailand and India Shine at PATA Travel Mart 2025 in Bangkok.

Presentation: AC Mitigation Case Histories

  • 1. AC Mitigation Case Histories Nebraska Pipeline Safety Seminar Mike Ames March 26, 2013 Grand Island, NE
  • 3. General Perspective • The consequence of well insulated pipelines in High Voltage AC corridors resulted in pipelines suffering high current loads of AC as a byproduct of inductive, capacitive, and direct coupling issues with the power lines. • The pipeline basically is now a secondary winding of a gigantic transformer, with the AC power line as the primary winding. • Voltages induced into the pipeline go in the opposite direction to those in the powerline. • These voltages can build to voltage levels that can become safety hazards, and the current values of the pipe line can result in corrosion to the pipe walls by AC Corrosion • AC Corrosion is not yet a clearly defined process, however, it does have some characteristic indications that are commonly associated with it from field inspections. 3SAE Inc.
  • 4. High Voltages Go To Ground • Note the burned area where high voltage spikes jumped to ground through the connection provided to the mounting pipe by the backplate bolt. • Indication is the pipeline may need AC Mitigation.
  • 5. What is Meant by AC Current Density? • The current density level is important, not necessarily in the pipeline itself, but at the point of discharge from the pipeline into the soil. • Reported data from field inspections have shown a range of AC current densities of 0 to 20A/m2 are not involved with AC corrosion. From 20A/m2 to 100A/m2 there may be an involvement, while levels over 100A/m2 are strongly indicated to have AC corrosion active. 5SAE Inc.
  • 6. What affects the AC Current Density? • High soil resistivities are an enhancement to protect the pipeline by lowering the current density. • Low soil resistivities allow higher current densities as the current flow away from the coating anomaly is enhanced. • The size of the defect is critically important. Densities of current from a scrape of several inches in length will have lower current densities. While a small defect in the coating, such as made by a grain of sand in the coating will have much higher current densities as the current is being pushed from a much smaller cross sectional area. 6SAE Inc.
  • 7. Further AC Current Density • The availability of the current in the pipeline is also a major factor. If the pipeline is in a corridor with low AC current power lines, the critical current densities may be too low induced in the pipeline to be an issue, while large tower like lines with high voltages may indeed be involved with it. Each case is different, which points strongly to the need of field measurements and accurate modeling. • Normally a length of pipe should be running parallel to an HVAC system to induce high current loads, but not always. In some crossings of shallow angles, these currents can still be achieved. • There is an “end effect” situation as well, where current tries to preferentially leave the pipeline near the point of its deviations from being parallel SAE Inc. 7
  • 8. Examples – Look For the Characteristic Shapes 8SAE Inc.
  • 9. How is AC Safety Mitigated? • Locations of pipe to soil test leads, and any surface pipeline appurtenance can be measured to determine locations of possibly high enough voltage to require mitigation for safety. Accurate modeling will also disclose areas of expected safety issues. • These locations can be mitigated with short runs of material that can permanently shunt the current to the power line ground system economically. • Step potentials must be considered in these areas, and normally, step potential mats are indicated in all locations of surface pipe appurtenances such as block valves and risers to protect personnel • All Test Lead contacts in high potential power line ROW parallel systems should be dead face front style to prevent contact with personnel. Covers are also indicated as further assurance of protection from public interaction in areas of high population densities. 9SAE Inc.
  • 10. How are AC Corrosion Issues Mitigated? • A cookie cutter approach may be used, but cannot be assured of success as there may be areas that have not been modeled and found that can have significant issues of AC corrosion that may not be covered by short isolated segments of parallel or deep well drains. • Areas for spot installations or longer runs of material may be disclosed by a good interpretation of the topography, and looking for areas of divergence and convergence between the pipeline and the power lines involved. • Areas of known high current density may be generally indicated at major divergence points, and near power line substations, but many others may be on the line, and not discovered without field surveys and appropriate modeling of the systems. It is strongly suggested any line with discovered AC corrosion wall losses should be modeled and an appropriate complete system installation designed and proposed for consideration. 10SAE Inc.
  • 11. How is AC Mitigated? • Have a survey company that can efficiently do all field surveys required for modeling the line. • Use appropriate (CDEGS/ROW) modeling software especially for complex multiple power line ROW and pipeline issues. • Consider two methods of AC mitigation, linear system beside the pipeline and/or deep point drains for concentrated areas of impact. A combination may be best. • Isolate your CP system by using decouplers to isolate from the cathodic protection system, but capable of handling the AC drainage currents indicated. • Consider using a solid forming conductive backfill to enhance performance and life of the system. 11SAE Inc.
  • 12. Field Installations of Linear AC Drains SAE Inc. 12
  • 14. SAE Inc. Page 14 Solid Media Backfill – Ground Enhancement • Diagram of an AC Mitigation electrode as installed: – A large copper core is encapsulated in a conductive solid forming backfill – When set up, the AC Mitigation electrode becomes a single, solid conductor with a large surface area able to safely dissipate large amounts of current – The electrode system protects the copper core from corrosion and deterioration, thus extending the operational lifetime by 10 times normal – The backfill reduces system impedance to allow faster current flow in peak conditions
  • 15. A 42” Gas Transmission Line • The line is in Eastern Texas, running eastward • The line is parallel to high tension lines for 40 miles • The area was modeled using CDEGS Software from data on the location prior to construction • The AC Mitigation system was installed per the modeling during the construction phase. • The results are most areas are below 1 volt AC • The highest single point location is 5.4 VAC. SAE Inc. 15
  • 16. Results Copper/Conductive Concrete SAE Inc. Page 16 0.000 1.000 2.000 3.000 4.000 5.000 6.000 1 12 23 34 45 56 67 78 89 100 111 122 133 144 155 166 177 188 199 210 221 232 243 254 265 276 287 298 309 320 331 342 353 364 375 386 397 408 419 430 Series1
  • 17. Wire in solid backfill, Bare, Bare no backfill, Exposure 10 years SAE Inc. Page 17
  • 19. Point Drain AC Mitigation • Point drains are effective for localized problems or intense AC drains are needed • Point drains are excellent alternatives when there is no ROW for long length linear AC Mitigation systems • Deep soil resistivities are important in the design of these installations • Some specific locations best for point drains are areas near power substations, and shallow angle crossings of pipelines by High Tension lines SAE Inc. 19
  • 20. Solid Media Backfill • Conductive concrete has a resistivity of 3 ohm/cm • It is hygroscopic and will absorb and retain moisture • It has been used to enhance grounding systems for over 100 years • It reduces impedance and resistance of AC mitigation systems and enhances their ability to pass current to the earth, including when appropriately designed and installed, Fault and lightning currents. • The backfill reduces impedance significantly to improve the rapidity of current drain of AC, during faults or lightning surges. • It reduces the electrolytic corrosion process of copper by over 85%, extending copper life to 50 years or more in AC Mitigation service. • Point drains use a bare copper wire in a drilled open hole, filled with conductive concrete, and connected to the pipeline by a DC decoupler. SAE Inc. 20
  • 21. AC Interaction on Municipal Lines • A common misconception is that there is no need for AC Mitigation on city mains or small intrastate pipeline systems. • AC can be induced to high levels on these lines even from low municipal AC systems. • Key locations may be – New well coated lines parallel to AC systems – Passing by an HVAC Substation – Buried AC Systems crossing at shallow angles and little separation from the pipeline SAE Inc. 21
  • 22. Point Drains/Linears in Kansas • The location was near a power sub station • The company had installed zinc ribbon and bare copper wire tests and tested copper wire with conductive concrete backfill • Prior to installation of the point drains, an AC Current Density monitor coupon was installed • The AC voltage decreased below safety levels and the current dropped to below AC Corrosion levels using these Point Drains. SAE Inc. 22
  • 23. Model Results • The models presented are to show the unmitigated Voltage and Current ranges in their current status and in their post mitigated status. • These models were produced using the available information from the facility owner, the power line company, and field inspections of the areas concerned.
  • 28. Point Drains in SE Kansas SAE Inc. 28 15.22 14.42 2.25 7.55 16.75 14.61 12.72 10.93 10.85 3.98 0.968 1.54 3.74 1.91 4.78 0.397 0.773 3.11 6.44 10.04 3.5 1.42 0.83 0.946 0.782 0.513 0.822 1.21 1.05 0.404 0 2 4 6 8 10 12 14 16 18 ACPSP Mile Post No AC Mitigation With AC Mitigation
  • 29. Current Density WO/With Point Drains SAE Inc. 29 101 14 7 5 15 104 76 92 31 11 2 5 25 11 53 1 9 4 8 25 8 7 3 2 1 3 8 6 10 20 40 60 80 100 120 CurrentDensity Mile Post No AC mitigation With AC mitigation
  • 31. Would your AC Mitigation System Survive? SAE Inc. 31
  • 32. Questions or Comments • For technical support contact Mike Ames SAE Inc. VP Engineering Humble, TX 713 598 7042 www.saeinc.com 32SAE Inc.