Programme Start up

                             [Title]

                         Author: [Author]
                       Your Business Name
                          Street Address
                            Address 2
                            Telephone
                               Fax
                              E-Mail

                           Date: [Date]

                  Distribution: [Distribution list]

                 Version: [Enter Version number]




Version   Date       Authorised by        Narrative
1.0
1.0 Purpose
The purpose of this document is to communicate the programme strategy. This
document will communicate the business area process and identify the approach, the
people involved and methodologies that will be taken to improve the current
performance indicators.


2.0 Vision and Mission statement



3.0 Strategic positioning


4.0 Business process (SIPOC)


SUPPLIER            INPUTS       PROCESS           OUTPUTS           CUSTOMER




5.0 Performance Indicators “As is” V “To be”

Programme start up document          Version:
Author:                              Date:
                                     Page 2 of 8
5.1 “As is” V “To be” key performance indicators

Measurement                     Current (As is)    Future (to be)    Variance




Source:



5.2 Area of focus

5.3 List of key benefits of focus


5.4 Programme plan of benefits realisation

Activity to realise benefits / “To be” performance indicators       Plan date




6.0 Weighted Objectives

Programme start up document          Version:
Author:                              Date:
                                     Page 3 of 8
6.1 Mandatory objectives

These objectives are mandatory and must be achieved in any project.

6.2 Ranked Objectives

The below objectives are required but may be flexed if other objectives are achieved.
These objectives are therefore not mandatory and will be ranked as such:

Objective   1
Objective   2   Output documents from CareFirst are correct
Objective   3   Business processes documented
Objective   4   Operational guidance notes and policies documented
Objective   5   People are competent and confident using CareFirst
Objective   6   Administration time of using CareFirst is reduced

                Objective 1 Objective 2   Objective 3    Objective 4   Objective 5   Objective 6
Objective   1
Objective   2
Objective   3
Objective   4
Objective   5
Objective   6



Objective       Objective 1 Objective 2   Objective 3    Objective 4   Objective 5   Objective 6
Count               1             1             1              1             1             1
Rank                1             1             1              1             1             1




7.0 Quality / Critical to success
7.1 Critical to Quality

       7.1.1 Customer focus

       7.1.2 Quality of outputs


7.2 Quality assurance


7.3 Responsibilities of quality assurance


7.4 Reporting on quality performance issues

Programme start up document                Version:
Author:                                    Date:
                                           Page 4 of 8
8.0 Approach – Framework
8.1 Programme Management

The programme framework will be initiated with the “Programme start up” document.
Once the objectives have been identified and ratified, then a “Programme improvement
plan” will be written and a project portfolio (listing all projects in the programme) will be
managed.


8.2 Project Management

Every project in the portfolio will be initiated with a “project start up document” and
reviewed periodically through the “project delivery report” and then reviewed and
handed back to the business through the “project closure report”


8.3 Programme / Project tools

The programme and associated projects will utilise the following tools:

-   Risk log (used to list potential problems that could impact the business,
    programme or project)

-   Issues log (used to list all issues affecting the business, programme or project)

-   Lessons learned log (used in everyday working to take learnings into the future)

-   Exception reports to request a change in the a) deliverables, objectives, targets or
    b) changes to the timescales, costs or quality aspects of the project plan.

-   Change request logs (used to list all the requested and approved changes to the
    programme / project)

-   Stakeholder schedules (This will be used to engage people and manage
    communication)


8.4 Process Review

A business process map will be documented for the areas where the most benefit is
expected. The process map will detail the people involved, time taken, quality
consideration and flows of information

8.5 Organisation

There will be a clear focus on the organisation structure and in particular:
   • workforce have the right capability through training and development

Programme start up document              Version:
Author:                                  Date:
                                         Page 5 of 8
•   Caseloads / workloads is manageable
   •   objectives for the department and individuals is aligned to strategy
   •   communication between departments is clear and concise


8.6 Technology

The use of technology will be reviewed to ensure that it is always available and
downtime is controlled and organised. There will be a review of other technologies to
see what improvements may be made to the efficiencies of the organisation and
business processes in order to deliver the expected benefits / objectives.

8.7 Information

This programme will look at the information and how it is used to measure performance
of each business process.

The information review will also look at workflow of information, how it is passed onto
other people / departments, controls in place and media used. There will be a focus on
freedom of information and data protection acts.




9.0 Project portfolio strategy
Projects will be identified within the “Project Improvement Plan” and will be listed on the
project portfolio log. The projects will be measured against the objectives identified in
section “6.0 weighted objectives”

The projects within the portfolio will need to reviewed and agreed by the programme
sponsor with the programme manager before commencement and resources allocated.

Once the project portfolio has been agreed, projects will be started via “Project stat up”
documents and their status’ will be communicated through “project delivery reports”.


10.0 Programme team
10.1 Programme team




Programme start up document             Version:
Author:                                 Date:
                                        Page 6 of 8
Programme Sponsor
                                              Name


                              Senior User
                                Name


                                        Programme Manager
                                              Name


                                   User                    Title
                                   Name                   Name




10.2 Roles & responsibilities

10.2.1 Programme Sponsors

       The programme sponsors will be responsible for the overall direction of the
       programme and to ensure it is aligned to the organisations’ objectives. They will
       grant permission for resources to be allocated against the chosen projects.

       The programme sponsor will also be responsible to approve any change
       requests and for the amendments to the objectives “to be” key performance
       indicators for the programme.

10.2.2 Programme Manager

       The programme manager will be responsible for the execution of the programme
       improvement plan and to oversee the project portfolio. This will be to ensure the
       organisations’ objectives are achieved.

       The programme manager will be responsible for communicating and engaging
       with the identified stakeholders to ensure that their needs are identified and met
       by the project portfolio.

       The programme manager will be responsible for the communication of any
       exception reports that may affect the overall direction of the programme.

       The programme manager will issue the programme delivery reports and all
       associated issues / risk logs.




Programme start up document                 Version:
Author:                                     Date:
                                            Page 7 of 8
11.0 Stakeholders, communication and reporting
11.1 Stakeholders for the programme




                                                                                                                                    Individual discussions
                                                                                                              Minutes to meetings
                                                                               Highlight reports

                                                                                                   Meetings
                                                                    Start up
Key Stakeholder / Dept / Tel No. / Location




11.2 Reporting and review


12.0 Issues and risk management
The programme and business issues / risks will be listed in the “programme issues log”
and “programme risk log”. All mitigating actions will be identified and agreed by the
programme team as specified in section “10.0 Programme team”

The programme risks and issues will also be communicated via the “Programme
delivery reports”




Programme start up document              Version:
Author:                                  Date:
                                         Page 8 of 8

More Related Content

PPTX
6 joseangelo-2confcmmiportugal-v3
PDF
What systems thinking can offer portfolio, programme & project managers, 19 O...
PDF
From project to portfolio management - how to successfully bridge the gap web...
PDF
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
PPTX
Enterprise Architecture Program Management Challenges
PDF
The Executive Sponsor role – panel debate with senior leaders, 23 July 2020, ...
PDF
Purchase-to-Pay Global Process Owner (P2P GPO)
PDF
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
6 joseangelo-2confcmmiportugal-v3
What systems thinking can offer portfolio, programme & project managers, 19 O...
From project to portfolio management - how to successfully bridge the gap web...
Alexander Budzier APM RISK MANAGEMENT SIG CONFERENCE
Enterprise Architecture Program Management Challenges
The Executive Sponsor role – panel debate with senior leaders, 23 July 2020, ...
Purchase-to-Pay Global Process Owner (P2P GPO)
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020

What's hot (19)

PDF
The essence of successful programmes webinar
PDF
APM QSRA webinar; introduction for risk and planning professionals and decisi...
PDF
An Assessment of Project Portfolio Management Techniques on Product and Servi...
PDF
Creating an Agile assurance landscape for projects, Adrian Pyne
PDF
Complicated project management theory turns people off
PDF
Projects programmes and portfolios, so what is the difference?
PDF
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
PDF
So you think you need a PMO presentation SWWE 11th February 2016
PDF
How to successfully deliver business change
PPSX
Keynote UQAM 26 november 2013 Program Management
PPTX
North West branch Annual General Meeting & "Lessons on Governance"
PDF
dttl-er-managingcomplextransformations-08082013
PDF
Portfolio, Project and Programme Management
PDF
Good governance of the project portfolio
PDF
Applied Project Management - P. Garkaviy
PPTX
Workshop B, Agile P3M benefits, by Steve Messenger
PPSX
Project Managment Framework
PPTX
OPM Integrated Lifecycles - V3
PPTX
PMI Slide Presentation 2011
The essence of successful programmes webinar
APM QSRA webinar; introduction for risk and planning professionals and decisi...
An Assessment of Project Portfolio Management Techniques on Product and Servi...
Creating an Agile assurance landscape for projects, Adrian Pyne
Complicated project management theory turns people off
Projects programmes and portfolios, so what is the difference?
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
So you think you need a PMO presentation SWWE 11th February 2016
How to successfully deliver business change
Keynote UQAM 26 november 2013 Program Management
North West branch Annual General Meeting & "Lessons on Governance"
dttl-er-managingcomplextransformations-08082013
Portfolio, Project and Programme Management
Good governance of the project portfolio
Applied Project Management - P. Garkaviy
Workshop B, Agile P3M benefits, by Steve Messenger
Project Managment Framework
OPM Integrated Lifecycles - V3
PMI Slide Presentation 2011
Ad

Viewers also liked (20)

PPT
Little Bit Of Everything
PPT
The brain and dreams2
PPT
sweet
PPT
Aman dhindsa template clues apgov
PPT
ขนมไทย
PDF
IFS World - speciál IFS Aplikace 8
PPT
CKV opdracht 1
PDF
Face IT2U: An Introduction
PPT
M6 web quest_activity_lp
PDF
Extending MOOC ecosystems using web services and software architectures
PPTX
How to create a community
PPT
James Colby Maddox Business Intellignece and Computer Science Portfolio
PPTX
Liceo 12
 
PPT
Rap s abir foots
PPTX
JW day 4 (unit 2)
PDF
Patient-Centric Privacy: Envisioning Collaboration Between Payers, Providers...
PDF
PDF
Programa de prácticas en empresas internacionales para el Máster de Sistemas ...
PPTX
Van gogh
PPTX
Movie Sets And Locations
Little Bit Of Everything
The brain and dreams2
sweet
Aman dhindsa template clues apgov
ขนมไทย
IFS World - speciál IFS Aplikace 8
CKV opdracht 1
Face IT2U: An Introduction
M6 web quest_activity_lp
Extending MOOC ecosystems using web services and software architectures
How to create a community
James Colby Maddox Business Intellignece and Computer Science Portfolio
Liceo 12
 
Rap s abir foots
JW day 4 (unit 2)
Patient-Centric Privacy: Envisioning Collaboration Between Payers, Providers...
Programa de prácticas en empresas internacionales para el Máster de Sistemas ...
Van gogh
Movie Sets And Locations
Ad

Similar to Programme start up document - Optimised Programme Methodology (20)

DOCX
SPMP Software Project Management Plan.docx
PDF
Project Charter - Outreach Events for the Company
PPT
Strengths (Internal, Positive Factors).ppt
PDF
Project Plan template
PPT
Capello Pw 2011
PPT
Capello Pw 2011
PDF
Stepwise planning
PDF
PMP - Risk Management plan & template
PPTX
Project Management Best Practices - Tips and Techniques
PPTX
The Program Management Framework—What's New?
PDF
Project Management (2).pdf
DOCX
ERP/SAP Project Charter
PDF
DOC
Status reports
PPTX
13.0 Project Stakeholder Management Overview
XLS
Excel Project Management
PPS
Standard For Program Management Changes
PPS
Standardforprogrammanagementchanges 090328223505 Phpapp02
 
DOCX
Customerlogo hereProject Name Project CharterCompanylog
PDF
4. Proper planning of a software project unless the project is trivia.pdf
SPMP Software Project Management Plan.docx
Project Charter - Outreach Events for the Company
Strengths (Internal, Positive Factors).ppt
Project Plan template
Capello Pw 2011
Capello Pw 2011
Stepwise planning
PMP - Risk Management plan & template
Project Management Best Practices - Tips and Techniques
The Program Management Framework—What's New?
Project Management (2).pdf
ERP/SAP Project Charter
Status reports
13.0 Project Stakeholder Management Overview
Excel Project Management
Standard For Program Management Changes
Standardforprogrammanagementchanges 090328223505 Phpapp02
 
Customerlogo hereProject Name Project CharterCompanylog
4. Proper planning of a software project unless the project is trivia.pdf

More from Simon Misiewicz (20)

PPT
Creative thinking template
PPT
Is starting a business right time for you
PPT
Raising finance for your business
PPT
Business user requirements for it development
PPT
Business process re-engineering and systems design - implementation
XLS
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
PPT
Business Process Improvement - Doing the right things effectively and efficie...
PPT
Communicating strategic missions, vision, project progress and celebrate succ...
PPT
Deliver training to suit varying learning styles
PPT
4 steps to formulating strategies from the boardroom through to every employee
PPT
Stakeholder engagement and management
PPT
Lean, Six Sigma, ToC using DMAIC project management
PPT
Effective Communication for successful working and personal relationships
PPT
Strategic improvement through the balanced scorecard and programme management
XLS
Staff appraisal document - template
DOCX
Be proactive
DOC
Optimised - Programme start up
DOC
Project End Report - Project Management template
DOC
Lessons learned Report - Project Management template
DOC
Highlight Report - Project Management template
Creative thinking template
Is starting a business right time for you
Raising finance for your business
Business user requirements for it development
Business process re-engineering and systems design - implementation
Optimise-GB's Lean Six Sigma's DMAIC & DMADV Programme imporvement plan Manag...
Business Process Improvement - Doing the right things effectively and efficie...
Communicating strategic missions, vision, project progress and celebrate succ...
Deliver training to suit varying learning styles
4 steps to formulating strategies from the boardroom through to every employee
Stakeholder engagement and management
Lean, Six Sigma, ToC using DMAIC project management
Effective Communication for successful working and personal relationships
Strategic improvement through the balanced scorecard and programme management
Staff appraisal document - template
Be proactive
Optimised - Programme start up
Project End Report - Project Management template
Lessons learned Report - Project Management template
Highlight Report - Project Management template

Recently uploaded (20)

PDF
Investment in CUBA. Basic information for United States businessmen (1957)
PDF
BeMetals_Presentation_September_2025.pdf
PDF
El futuro empresarial 2024 una vista gen
PDF
The Evolution of Legal Communication through History (www.kiu.ac.ug)
PPTX
international business Chapter 013 global sourcing
PPTX
Hospitality & tourism management.pptxHospitality & tourism management.pptx
DOCX
SONy product line of steeple analysis with all
PDF
Who says elephants can't dance? - Business Analysis 30 Aug 2025
PDF
NewBase 02 September 2025 Energy News issue - 1822 by Khaled Al Awadi_compre...
PDF
Unit 2 Electronic-Commerce Business Models.pptx
PDF
COVID-19 Primer for business case prep.pdf
PDF
The Relationship between Leadership Behaviourand Firm Performance in the Read...
PDF
Не GPT єдиним: можливості AI в бізнес-аналізі | Вебінар з Тетяною Перловською
 
PDF
Trust Building in Family business: Issues and Challenges in Family Business a...
PPTX
Breaking Barriers in Tech : A Female Founder’s Story of Resilience and SaaS I...
PDF
Mukul Madhav Foundation (MMF) Newsletter – June 2025
DOCX
“Strategic management process of a selected organization”.Nestle-docx.docx
DOCX
Tax administration and supervision for accounting
PPTX
Business Research Methods- Secondary Data
PPTX
Capital Investment in IS Infrastracture and Innovation (SDG9)
Investment in CUBA. Basic information for United States businessmen (1957)
BeMetals_Presentation_September_2025.pdf
El futuro empresarial 2024 una vista gen
The Evolution of Legal Communication through History (www.kiu.ac.ug)
international business Chapter 013 global sourcing
Hospitality & tourism management.pptxHospitality & tourism management.pptx
SONy product line of steeple analysis with all
Who says elephants can't dance? - Business Analysis 30 Aug 2025
NewBase 02 September 2025 Energy News issue - 1822 by Khaled Al Awadi_compre...
Unit 2 Electronic-Commerce Business Models.pptx
COVID-19 Primer for business case prep.pdf
The Relationship between Leadership Behaviourand Firm Performance in the Read...
Не GPT єдиним: можливості AI в бізнес-аналізі | Вебінар з Тетяною Перловською
 
Trust Building in Family business: Issues and Challenges in Family Business a...
Breaking Barriers in Tech : A Female Founder’s Story of Resilience and SaaS I...
Mukul Madhav Foundation (MMF) Newsletter – June 2025
“Strategic management process of a selected organization”.Nestle-docx.docx
Tax administration and supervision for accounting
Business Research Methods- Secondary Data
Capital Investment in IS Infrastracture and Innovation (SDG9)

Programme start up document - Optimised Programme Methodology

  • 1. Programme Start up [Title] Author: [Author] Your Business Name Street Address Address 2 Telephone Fax E-Mail Date: [Date] Distribution: [Distribution list] Version: [Enter Version number] Version Date Authorised by Narrative 1.0
  • 2. 1.0 Purpose The purpose of this document is to communicate the programme strategy. This document will communicate the business area process and identify the approach, the people involved and methodologies that will be taken to improve the current performance indicators. 2.0 Vision and Mission statement 3.0 Strategic positioning 4.0 Business process (SIPOC) SUPPLIER INPUTS PROCESS OUTPUTS CUSTOMER 5.0 Performance Indicators “As is” V “To be” Programme start up document Version: Author: Date: Page 2 of 8
  • 3. 5.1 “As is” V “To be” key performance indicators Measurement Current (As is) Future (to be) Variance Source: 5.2 Area of focus 5.3 List of key benefits of focus 5.4 Programme plan of benefits realisation Activity to realise benefits / “To be” performance indicators Plan date 6.0 Weighted Objectives Programme start up document Version: Author: Date: Page 3 of 8
  • 4. 6.1 Mandatory objectives These objectives are mandatory and must be achieved in any project. 6.2 Ranked Objectives The below objectives are required but may be flexed if other objectives are achieved. These objectives are therefore not mandatory and will be ranked as such: Objective 1 Objective 2 Output documents from CareFirst are correct Objective 3 Business processes documented Objective 4 Operational guidance notes and policies documented Objective 5 People are competent and confident using CareFirst Objective 6 Administration time of using CareFirst is reduced Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Objective 6 Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Objective 6 Objective Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Objective 6 Count 1 1 1 1 1 1 Rank 1 1 1 1 1 1 7.0 Quality / Critical to success 7.1 Critical to Quality 7.1.1 Customer focus 7.1.2 Quality of outputs 7.2 Quality assurance 7.3 Responsibilities of quality assurance 7.4 Reporting on quality performance issues Programme start up document Version: Author: Date: Page 4 of 8
  • 5. 8.0 Approach – Framework 8.1 Programme Management The programme framework will be initiated with the “Programme start up” document. Once the objectives have been identified and ratified, then a “Programme improvement plan” will be written and a project portfolio (listing all projects in the programme) will be managed. 8.2 Project Management Every project in the portfolio will be initiated with a “project start up document” and reviewed periodically through the “project delivery report” and then reviewed and handed back to the business through the “project closure report” 8.3 Programme / Project tools The programme and associated projects will utilise the following tools: - Risk log (used to list potential problems that could impact the business, programme or project) - Issues log (used to list all issues affecting the business, programme or project) - Lessons learned log (used in everyday working to take learnings into the future) - Exception reports to request a change in the a) deliverables, objectives, targets or b) changes to the timescales, costs or quality aspects of the project plan. - Change request logs (used to list all the requested and approved changes to the programme / project) - Stakeholder schedules (This will be used to engage people and manage communication) 8.4 Process Review A business process map will be documented for the areas where the most benefit is expected. The process map will detail the people involved, time taken, quality consideration and flows of information 8.5 Organisation There will be a clear focus on the organisation structure and in particular: • workforce have the right capability through training and development Programme start up document Version: Author: Date: Page 5 of 8
  • 6. Caseloads / workloads is manageable • objectives for the department and individuals is aligned to strategy • communication between departments is clear and concise 8.6 Technology The use of technology will be reviewed to ensure that it is always available and downtime is controlled and organised. There will be a review of other technologies to see what improvements may be made to the efficiencies of the organisation and business processes in order to deliver the expected benefits / objectives. 8.7 Information This programme will look at the information and how it is used to measure performance of each business process. The information review will also look at workflow of information, how it is passed onto other people / departments, controls in place and media used. There will be a focus on freedom of information and data protection acts. 9.0 Project portfolio strategy Projects will be identified within the “Project Improvement Plan” and will be listed on the project portfolio log. The projects will be measured against the objectives identified in section “6.0 weighted objectives” The projects within the portfolio will need to reviewed and agreed by the programme sponsor with the programme manager before commencement and resources allocated. Once the project portfolio has been agreed, projects will be started via “Project stat up” documents and their status’ will be communicated through “project delivery reports”. 10.0 Programme team 10.1 Programme team Programme start up document Version: Author: Date: Page 6 of 8
  • 7. Programme Sponsor Name Senior User Name Programme Manager Name User Title Name Name 10.2 Roles & responsibilities 10.2.1 Programme Sponsors The programme sponsors will be responsible for the overall direction of the programme and to ensure it is aligned to the organisations’ objectives. They will grant permission for resources to be allocated against the chosen projects. The programme sponsor will also be responsible to approve any change requests and for the amendments to the objectives “to be” key performance indicators for the programme. 10.2.2 Programme Manager The programme manager will be responsible for the execution of the programme improvement plan and to oversee the project portfolio. This will be to ensure the organisations’ objectives are achieved. The programme manager will be responsible for communicating and engaging with the identified stakeholders to ensure that their needs are identified and met by the project portfolio. The programme manager will be responsible for the communication of any exception reports that may affect the overall direction of the programme. The programme manager will issue the programme delivery reports and all associated issues / risk logs. Programme start up document Version: Author: Date: Page 7 of 8
  • 8. 11.0 Stakeholders, communication and reporting 11.1 Stakeholders for the programme Individual discussions Minutes to meetings Highlight reports Meetings Start up Key Stakeholder / Dept / Tel No. / Location 11.2 Reporting and review 12.0 Issues and risk management The programme and business issues / risks will be listed in the “programme issues log” and “programme risk log”. All mitigating actions will be identified and agreed by the programme team as specified in section “10.0 Programme team” The programme risks and issues will also be communicated via the “Programme delivery reports” Programme start up document Version: Author: Date: Page 8 of 8