1. Rehabilitate and maintain historic integrity of Hangar One and
Shenandoah Plaza Historic District;
2. Eliminate NASA’s operating and maintenance costs to operate MFA;
3. Leverage the expertise of the real estate industry to reposition MFA
as a valuable asset to support Government and controlled public and
private flight operations;
4. MFA outlease consistent with the 2002 NASA Ames Development
Plan and Final Programmatic EIS (FPEIS);
5. Provide net financial proceeds to the Government; and
6. Obtain best value for the Government through open public
competition.
VISION AND GOALS FOR MFA LEASE
2
LEASE IS STRUCTURED TO
ACCOMPLISH NASA’S VISION AND
GOALS BY:
3
LEASE PREMISES
The lease premises contains 1,000.1 acres, consisting of the following buildings and facilities:
Hangar One, Hangar Two, Hangar Three, Building 158, the Airfield and the Golf Course.
4
• Initial Term: Sixty (60) Years.
• Right to Terminate: Due to significant investment, PV has the
unilateral right to terminate as of each of the following dates:
September 30, 2029; September 30, 2044; and September 30,
2059. PV cannot terminate prior to Hangar 1 re-skinning.
• Extension Terms: PV has the unilateral right to extend the Initial
Term for up to three (3) additional consecutive twelve (12) year
periods.
• PV and NASA are currently in a lease transition period. The lease
will commence 10 business days after PV receives acceptable Bona
Fide Prospective Lessee Letters from the EPA and Water Board.
LEASE TERM
5
• Formulated as part of MFA lease
• Prioritizes the preservation of historic resources at MFA and protects
MFA’s historic integrity and/or character
• Six separate but interconnected projects:
– Hangar One: re-skin and rehabilitate for R&D use
– Hangars Two and Three: immediately rehabilitate for R&D uses
– Airfield: refurbish (concrete, NAVAIDS, lights) and operate to Part 139 Class
4 standard; install LED airfield lighting and possibly GPS WAAS approach
– B158 (Control Tower): evaluate structure for continued use for air traffic
control; potentially rehabilitate or replace with new construction
– Golf Course: refurbish course and clubhouse w/eco-friendly approach;
upgrades to course to enhance playing experience; relocate CANG
munitions storage areas to CANG Cantonment Area
– Education Facility: select best site and construct 90,000 sq. ft. education
and public use facility
CONCEPTUAL DEVELOPMENT PLAN
6
• PV to rehabilitate and adaptively reuse historic Hangars One, Two and
Three
• Hangar One
– Re-skinning: 2 years from approval of all permits and approvals by NASA & other
regulatory agencies
• Hangar Uses
– R&D, including testing and light assembly uses related to space, aviation,
rover/robotics and other emerging technologies
• MFA Lease revenue can be used for repair and rehabilitation of other
historic resources across the Agency
• Permits NASA to meet its mandates under NHPA to protect and
preserve historic assets across the Agency
1) REHABILITATE AND MAINTAIN HISTORIC INTEGRITY OF
HANGAR ONE AND SHENANDOAH PLAZA HISTORIC DISTRICT
7
• NASA currently spends $7.4 million annually on MFA
– Of this total, NASA will save $6.3 million annually (based on 2013 dollars)
– Over 60 years these savings will total $378 million
• NASA reserves 8,000 operations for itself, CANG, and Army
– No charges to NASA, CANG, or Army for take-off, landing and through the gate
operations
– CANG to continue to provide ATC services
– NASA Research Park partners’ use of MFA subject to PV’s MFA charges
• NASA to pay its pro rata share of Airfield Rescue and Fire Fighting
(ARFF) costs
– 8 percent of airfield rescue and fire fighting service costs
– NASA and PV to explore how to lower ARFF costs in future
2) REDUCE NASA’S O&M COSTS TO OPERATE MFA
Pre-decisional – Not for Public Release 8
3) LEVERAGE THE EXPERTISE OF THE REAL ESTATE INDUSTRY
TO REPOSITION MFA AS A VALUABLE ASSET
9
• PV/Google real estate department professionally managed and
operates at a large scale
• PV has prepared a Conceptual Development Plan for MFA
– Identified Initial Projects and uses of MFA
– Enhances MFA assets and results in full utilization
– Returns Hangar One to productive use
• Government use of Airfield will benefit from PV’s proposed
improvements to Airfield
– Refurbished runways and taxiways to reach Pavement Condition Index of PCI
60+
– Refurbished air traffic control facility
• PV’s planned use of the Premises is anticipated to be in
conformance with 2002 NADP FPEIS
• Lease allocates 90,000 square feet of existing NADP entitlement for
new development
• PV to cover NASA’s full costs in serving as the lead agency for
NEPA compliance
4) MFA OUTLEASE CONSISTENT WITH THE 2002 NASA AMES
DEVELOPMENT PLAN AND FINAL PROGRAMMATIC EIS (FPEIS)
10
• Base Rent:
– $10.25M in Lease Years 1 through 3
– $15.5M in Lease Years 4 through 10
– $15.75M in Lease Year 11
– $20.5M in Lease Years 12 through 60
• Total Base Rent Payments: $1.16 billion (cumulative) over 60 years
• Security Deposit: $2 million
– Deposit forfeited if Hangar One is not re-skinned
• Institutional Shared Service (ISP) costs included in Base Rent
• Reimbursement of NASA Costs for:
– Demand services
– Utility O&M costs for portions of NASA-managed utility systems within Premises
– ARFF Services
5) PROVIDE NET FINANCIAL PROCEEDS TO THE GOVERNMENT
11
• Over $200M of investment on the leased Premises
– Rehabilitation of Hangar One
– Rehabilitation of Hangars 2 and 3
– Renovation of Golf Course and club house
– Runways and air traffic control facility refurbished
• 8,000 reserved flights for NASA, CANG and Army at no additional charge
• Saving of approximately $6.3M annual costs on MFA (includes savings
related to operating and maintaining airfield and ARFF services), $378M of
cost savings over 60 years
• Rent revenue of $1.16B over initial term ($10M years 1-3, $15.5M years 4-
10, $15.75M year 11 and $20.5M in years 12-60)
• Reimbursement to NASA for demand services, utility O&M and ARFF
services
• Future improvements to infrastructure and utility systems
FINANCIAL CONSIDERATIONS
12
• RFP advertised in FedBizOpps and local business Journal
• Tours conducted May 19th to July 19, 2013
• Two qualified proposals received
• Proposer presentations held January 2014
• PV offered best terms to Government – selected in February 2014
6) OBTAIN BEST VALUE FOR GOVERNMENT THROUGH OPEN
PUBLIC COMPETITION
13

More Related Content

PDF
NASA Condition Assessment and Rehabilitation Plan for Hangar One
PDF
Mashel III Cost Amendment Request
PPTX
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
PPTX
Sample Airport / Aviation Projects (2015 - 2020)
PDF
ESA - 2013 space transportation
PDF
Ssc10 iv-2
PDF
GHD Flood Mapping Review City of Stonnington 2008
PDF
Highbank Resources 43-101 Technical Report
NASA Condition Assessment and Rehabilitation Plan for Hangar One
Mashel III Cost Amendment Request
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Sample Airport / Aviation Projects (2015 - 2020)
ESA - 2013 space transportation
Ssc10 iv-2
GHD Flood Mapping Review City of Stonnington 2008
Highbank Resources 43-101 Technical Report

What's hot (20)

DOCX
59323623 1943-g-g-001-r c
PDF
TTS public release_v1.0
PDF
Samarang Field
PPT
Sea to Ski Higway Improvements Project
DOCX
doubling project synopsis
PDF
IG-12-022
PPTX
FCEVs and H2 in California
PDF
TANAP - Trans Anatolian Natural Gas Pipeline Project
PDF
PDF
A Business Analysis of a SKYLON Based European Launch Service Operator
PDF
A new module in ADMS-Roads for elevated roads
PPTX
Skylon spaceplane, uk the spacecraft of tomorrow
PDF
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
PDF
Roadside barriers - Accounting for the effect of vehicle induced momentum and...
PDF
IRJET- Ground Water Control Method Simulation in Sphinx Area
PDF
AGDC Joint Resources Presentation October 16 2017
PDF
nationally significant Infrastructure projects Jan2015
PPT
PDF
OAA - P7 - Land Use - M25 Land Use
59323623 1943-g-g-001-r c
TTS public release_v1.0
Samarang Field
Sea to Ski Higway Improvements Project
doubling project synopsis
IG-12-022
FCEVs and H2 in California
TANAP - Trans Anatolian Natural Gas Pipeline Project
A Business Analysis of a SKYLON Based European Launch Service Operator
A new module in ADMS-Roads for elevated roads
Skylon spaceplane, uk the spacecraft of tomorrow
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Roadside barriers - Accounting for the effect of vehicle induced momentum and...
IRJET- Ground Water Control Method Simulation in Sphinx Area
AGDC Joint Resources Presentation October 16 2017
nationally significant Infrastructure projects Jan2015
OAA - P7 - Land Use - M25 Land Use
Ad

Similar to NASA Update on Planetary Ventures Lease of Moffett Field (7)

PDF
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
PDF
Navy Hangar One Mockups
PDF
Z140213 G's moffettplans
PDF
The Tustin Hangars - Titans of History
PPT
J brennan kmc_laurin_aprince
PDF
Michelle Aronowitz | Disparate Impact Proposed rule
PDF
Harp rack card final 1
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Navy Hangar One Mockups
Z140213 G's moffettplans
The Tustin Hangars - Titans of History
J brennan kmc_laurin_aprince
Michelle Aronowitz | Disparate Impact Proposed rule
Harp rack card final 1
Ad

More from Steve Williams (20)

PDF
RAB NASA Update
PDF
RAB Vapor Intrusion Mitigation
PDF
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
PDF
RAB Community Presentation
PDF
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
PDF
NASA Ames Update to Restoration Advisory Board
PDF
Moffett RAB: EPA MEW Superfund Study Area Update
PDF
Moffett RAB: EPA Update on Environmental Issues Management Plan
PDF
EPA MEW Study Area TCE Source Investigation
PDF
Moffett Site 1, 22, 26, and 28 Five Year Review
PDF
Orion Park Housing Area VOC Plume Assessment
PDF
Epa vi and source investigation rab mtg update august 7 2014rv1
PDF
Moffett RAB: Navy EPA Intrusion Update
PDF
Moffett RAB: Navy Vapor Intrusion Update
PDF
Moffett RAB: 2014 Planned Environmental Activities
PDF
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
PDF
Site 28 Update, Moffett RAB, November 14, 2013
PDF
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
PDF
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
PDF
Site 28 Supplemental Investigation
RAB NASA Update
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Community Presentation
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
NASA Ames Update to Restoration Advisory Board
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA Update on Environmental Issues Management Plan
EPA MEW Study Area TCE Source Investigation
Moffett Site 1, 22, 26, and 28 Five Year Review
Orion Park Housing Area VOC Plume Assessment
Epa vi and source investigation rab mtg update august 7 2014rv1
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: 2014 Planned Environmental Activities
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Site 28 Supplemental Investigation

Recently uploaded (20)

PDF
Disorder of Endocrine system (1).pdfyyhyyyy
PPTX
Integrated Management of Neonatal and Childhood Illnesses (IMNCI) – Unit IV |...
PDF
anganwadi services for the b.sc nursing and GNM
PPTX
Neurological complocations of systemic disease
PPTX
UNIT_2-__LIPIDS[1].pptx.................
PDF
Fun with Grammar (Communicative Activities for the Azar Grammar Series)
PPTX
Designing Adaptive Learning Paths in Virtual Learning Environments
PPTX
PLASMA AND ITS CONSTITUENTS 123.pptx
PPTX
IT infrastructure and emerging technologies
PPTX
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
PDF
The TKT Course. Modules 1, 2, 3.for self study
PPTX
2025 High Blood Pressure Guideline Slide Set.pptx
PDF
faiz-khans about Radiotherapy Physics-02.pdf
PPT
Acidosis in Dairy Herds: Causes, Signs, Management, Prevention and Treatment
PPTX
ACFE CERTIFICATION TRAINING ON LAW.pptx
PPTX
Cite It Right: A Compact Illustration of APA 7th Edition.pptx
PDF
African Communication Research: A review
PPTX
4. Diagnosis and treatment planning in RPD.pptx
PPTX
Why I Am A Baptist, History of the Baptist, The Baptist Distinctives, 1st Bap...
PDF
Compact First Student's Book Cambridge Official
Disorder of Endocrine system (1).pdfyyhyyyy
Integrated Management of Neonatal and Childhood Illnesses (IMNCI) – Unit IV |...
anganwadi services for the b.sc nursing and GNM
Neurological complocations of systemic disease
UNIT_2-__LIPIDS[1].pptx.................
Fun with Grammar (Communicative Activities for the Azar Grammar Series)
Designing Adaptive Learning Paths in Virtual Learning Environments
PLASMA AND ITS CONSTITUENTS 123.pptx
IT infrastructure and emerging technologies
Key-Features-of-the-SHS-Program-v4-Slides (3) PPT2.pptx
The TKT Course. Modules 1, 2, 3.for self study
2025 High Blood Pressure Guideline Slide Set.pptx
faiz-khans about Radiotherapy Physics-02.pdf
Acidosis in Dairy Herds: Causes, Signs, Management, Prevention and Treatment
ACFE CERTIFICATION TRAINING ON LAW.pptx
Cite It Right: A Compact Illustration of APA 7th Edition.pptx
African Communication Research: A review
4. Diagnosis and treatment planning in RPD.pptx
Why I Am A Baptist, History of the Baptist, The Baptist Distinctives, 1st Bap...
Compact First Student's Book Cambridge Official

NASA Update on Planetary Ventures Lease of Moffett Field

  • 1. MOFFETT FEDERAL AIRFIELD LEASE OVERVIEW FEBRUARY 2015 1
  • 2. 1. Rehabilitate and maintain historic integrity of Hangar One and Shenandoah Plaza Historic District; 2. Eliminate NASA’s operating and maintenance costs to operate MFA; 3. Leverage the expertise of the real estate industry to reposition MFA as a valuable asset to support Government and controlled public and private flight operations; 4. MFA outlease consistent with the 2002 NASA Ames Development Plan and Final Programmatic EIS (FPEIS); 5. Provide net financial proceeds to the Government; and 6. Obtain best value for the Government through open public competition. VISION AND GOALS FOR MFA LEASE 2
  • 3. LEASE IS STRUCTURED TO ACCOMPLISH NASA’S VISION AND GOALS BY: 3
  • 4. LEASE PREMISES The lease premises contains 1,000.1 acres, consisting of the following buildings and facilities: Hangar One, Hangar Two, Hangar Three, Building 158, the Airfield and the Golf Course. 4
  • 5. • Initial Term: Sixty (60) Years. • Right to Terminate: Due to significant investment, PV has the unilateral right to terminate as of each of the following dates: September 30, 2029; September 30, 2044; and September 30, 2059. PV cannot terminate prior to Hangar 1 re-skinning. • Extension Terms: PV has the unilateral right to extend the Initial Term for up to three (3) additional consecutive twelve (12) year periods. • PV and NASA are currently in a lease transition period. The lease will commence 10 business days after PV receives acceptable Bona Fide Prospective Lessee Letters from the EPA and Water Board. LEASE TERM 5
  • 6. • Formulated as part of MFA lease • Prioritizes the preservation of historic resources at MFA and protects MFA’s historic integrity and/or character • Six separate but interconnected projects: – Hangar One: re-skin and rehabilitate for R&D use – Hangars Two and Three: immediately rehabilitate for R&D uses – Airfield: refurbish (concrete, NAVAIDS, lights) and operate to Part 139 Class 4 standard; install LED airfield lighting and possibly GPS WAAS approach – B158 (Control Tower): evaluate structure for continued use for air traffic control; potentially rehabilitate or replace with new construction – Golf Course: refurbish course and clubhouse w/eco-friendly approach; upgrades to course to enhance playing experience; relocate CANG munitions storage areas to CANG Cantonment Area – Education Facility: select best site and construct 90,000 sq. ft. education and public use facility CONCEPTUAL DEVELOPMENT PLAN 6
  • 7. • PV to rehabilitate and adaptively reuse historic Hangars One, Two and Three • Hangar One – Re-skinning: 2 years from approval of all permits and approvals by NASA & other regulatory agencies • Hangar Uses – R&D, including testing and light assembly uses related to space, aviation, rover/robotics and other emerging technologies • MFA Lease revenue can be used for repair and rehabilitation of other historic resources across the Agency • Permits NASA to meet its mandates under NHPA to protect and preserve historic assets across the Agency 1) REHABILITATE AND MAINTAIN HISTORIC INTEGRITY OF HANGAR ONE AND SHENANDOAH PLAZA HISTORIC DISTRICT 7
  • 8. • NASA currently spends $7.4 million annually on MFA – Of this total, NASA will save $6.3 million annually (based on 2013 dollars) – Over 60 years these savings will total $378 million • NASA reserves 8,000 operations for itself, CANG, and Army – No charges to NASA, CANG, or Army for take-off, landing and through the gate operations – CANG to continue to provide ATC services – NASA Research Park partners’ use of MFA subject to PV’s MFA charges • NASA to pay its pro rata share of Airfield Rescue and Fire Fighting (ARFF) costs – 8 percent of airfield rescue and fire fighting service costs – NASA and PV to explore how to lower ARFF costs in future 2) REDUCE NASA’S O&M COSTS TO OPERATE MFA Pre-decisional – Not for Public Release 8
  • 9. 3) LEVERAGE THE EXPERTISE OF THE REAL ESTATE INDUSTRY TO REPOSITION MFA AS A VALUABLE ASSET 9 • PV/Google real estate department professionally managed and operates at a large scale • PV has prepared a Conceptual Development Plan for MFA – Identified Initial Projects and uses of MFA – Enhances MFA assets and results in full utilization – Returns Hangar One to productive use • Government use of Airfield will benefit from PV’s proposed improvements to Airfield – Refurbished runways and taxiways to reach Pavement Condition Index of PCI 60+ – Refurbished air traffic control facility
  • 10. • PV’s planned use of the Premises is anticipated to be in conformance with 2002 NADP FPEIS • Lease allocates 90,000 square feet of existing NADP entitlement for new development • PV to cover NASA’s full costs in serving as the lead agency for NEPA compliance 4) MFA OUTLEASE CONSISTENT WITH THE 2002 NASA AMES DEVELOPMENT PLAN AND FINAL PROGRAMMATIC EIS (FPEIS) 10
  • 11. • Base Rent: – $10.25M in Lease Years 1 through 3 – $15.5M in Lease Years 4 through 10 – $15.75M in Lease Year 11 – $20.5M in Lease Years 12 through 60 • Total Base Rent Payments: $1.16 billion (cumulative) over 60 years • Security Deposit: $2 million – Deposit forfeited if Hangar One is not re-skinned • Institutional Shared Service (ISP) costs included in Base Rent • Reimbursement of NASA Costs for: – Demand services – Utility O&M costs for portions of NASA-managed utility systems within Premises – ARFF Services 5) PROVIDE NET FINANCIAL PROCEEDS TO THE GOVERNMENT 11
  • 12. • Over $200M of investment on the leased Premises – Rehabilitation of Hangar One – Rehabilitation of Hangars 2 and 3 – Renovation of Golf Course and club house – Runways and air traffic control facility refurbished • 8,000 reserved flights for NASA, CANG and Army at no additional charge • Saving of approximately $6.3M annual costs on MFA (includes savings related to operating and maintaining airfield and ARFF services), $378M of cost savings over 60 years • Rent revenue of $1.16B over initial term ($10M years 1-3, $15.5M years 4- 10, $15.75M year 11 and $20.5M in years 12-60) • Reimbursement to NASA for demand services, utility O&M and ARFF services • Future improvements to infrastructure and utility systems FINANCIAL CONSIDERATIONS 12
  • 13. • RFP advertised in FedBizOpps and local business Journal • Tours conducted May 19th to July 19, 2013 • Two qualified proposals received • Proposer presentations held January 2014 • PV offered best terms to Government – selected in February 2014 6) OBTAIN BEST VALUE FOR GOVERNMENT THROUGH OPEN PUBLIC COMPETITION 13