2013 Q1. What is difference between QA, QC and Software Testing? Quality Assurance 
(QA): QA refers to the planned and systematic way of monitoring the quality of process 
which is followed to produce a quality product. QA tracks the outcomes and adjusts the 
process to meet the expectation. Quality Control (QC): Concern with the quality of the 
product. QC finds the defects and suggests improvements. The process set by QA is 
implemented by QC. The QC is the responsibility of the tester. Software Testing: is the 
process of ensuring that product which is developed by the developer meets the user 
requirement. The motive to perform testing is to find the bugs and make sure that they get
fixed. Q2. When to start QA in a project? A good time to start the QA is from the 
beginning of the project startup. This will lead to plan the process which will make sure 
that product coming out meets the customer quality expectation. QA also plays a major 
role in the communication between teams. It gives time to step up the testing 
environment. The testing phase starts after the test plans are written, reviewed and 
approved. Q3. What are verification and validation and difference between these two? 
Verification: process of evaluating steps which is followed up to development phase to 
determine whether they meet the specified requirements for that stage. Validation: 
process of evaluating product during or at the end of the development process to 
determine whether product meets specified requirements. Difference between 
Verification and Validation:      Verification is Static Testing where as Validations 
is Dynamic Testing. Verification takes place before validation. Verification evaluates 
plans, documents, requirements and specifications, where as Validation evaluates 
product. Verification inputs are checklist, issues list, walkthroughs and inspection, where 
as in Validation testing of actual product. Verification output is set of documents, plans, 
specifications and requirement documents where as in Validation actual product is 
output. Q4. What is difference between Smoke testing and Sanity Testing? 
 GARUDATRAININGS.COM +1-508-841-6144 The difference between smoke and 
sanity testing is described below:     Sanity testing is performed when new build is 
released after fixing bugs where as smoke testing is performed to check the major 
functionalities of the application. Sanity is performed by the tester or the developer but 
smoke testing can be performed by the tester or developer. Smoke testing is performed 
earlier where as sanity is performed after the smoke testing. Sanity testing is narrow and 
deep approach of testing and smoke testing is focused testing based on major 
functionalities. Q5. What is destructive testing, and what are its benefits? Destructive 
testing includes methods where material is broken down to evaluate the mechanical 
properties, such as strength, toughness and hardness. For example, finding the quality of 
a weld is good enough to withstand extreme pressure and also to verify the properties of a 
material. Benefits of Destructive Testing (DT)     Verifies properties of a material 
Determines quality of welds Helps you to reduce failures, accidents and costs Ensures 
compliance with regulations Q6. What is Testware? The testware is:    The subset of 
software which helps in performing the testing of application. Testware are required to 
plan, design, and execute tests. It contains documents, scripts, inputs, expected results, 
set-up and additional software or utilities used in testing. Testware is term given to 
combination of all utilities and application software that required for testing a software 
package. Testware is special because it has: 1. Different purpose 2. Different metrics for 
quality and 3. Different users 
 GARUDATRAININGS.COM +1-508-841-6144 Q7. What is difference between 
Retesting and Regression testing? The difference between Retesting and Regression 
testing are below:     Retesting is done to verify defects fixes where as regression is 
perform to check if the defect fix have not impacted other functionality that was working 
fine before doing changes in the code. Retesting is planned testing based on the defect 
fixes listed where as regression is not be always specific to any defect fix. Also 
regression can be executed for some modules or all modules. Retesting concern with 
executing those test cases that are failed earlier whereas regression concern with 
executing test cases that was passed in earlier builds. Retesting has higher priority over
regression, but in some case retesting and regression testing are carried out in parallel. 
Q8. Explain bug life cycle. Bug Life Cycle:         When a tester finds a bug .The 
bug is assigned with NEW or OPEN status. The bug is assigned to development project 
manager who will analyze the bug .He will check whether it is a valid defect. If it is not 
valid bug is rejected, now status is REJECTED. If not, next the defect is checked whether 
it is in scope. When bug is not part of the current release .Such defects are POSTPONED 
Now, Tester checks whether similar defect was raised earlier. If yes defect is assigned a 
status DUPLICATE When bug is assigned to developer. During this stage bug is assigned 
a status INPROGRESS Once code is fixed. Defect is assigned with FIXED status. Next 
the tester will re-test the code. In case the test case passes the defect is CLOSED If the 
test case fails again the bug is RE-OPENED and assigned to the developer. That’s all to 
Bug Life Cycle. Q9. What is severity and priority of bug? Give some example. Priority: 
concern with application from the business point of view. It answers: How quickly we 
need to fix the bug? Or How soon the bug should get fixed? Severity: concern with 
functionality of application. It deals with the impact of the bug on the application. How 
much the bug is affecting the functionality of the application? Ex. 
 GARUDATRAININGS.COM     +1-508-841-6144 High Priority and Low Severity: 
Company logo is not properly displayed on their website. High Priority and High 
Severity: Suppose you are doing online shopping and filled payment information, but 
after submitting the form, you get a message like "Order has been cancelled." Low 
Priority and High Severity: If we have a typical scenario in which the application get 
crashed, but that scenario exists rarely. Low Priority and Low Severity: There is a 
mistake like "You have registered success" instead of successfully, success is written. 
Q10. What are the common problems with software automation? Software problem are 
listed below: 1. Purchasing the license of tool (QTP, selenium, QC, LR) 2. Lack of 
skilled Tester to run the tool 3. Expectation that automated tests will find a lot of new 
defects 4. Maintenance of automated tests 5. Technical problems of tools Q11. What is 
the role of QA in a project development? QA stands for QUALITY ASSURANCE. QA 
team assures the quality by monitor the whole development process. QA tracks the 
outcomes and adjusting process to meet the expectation. The role of Quality Assurance is 
discussed below:      QA team is responsible for monitoring the process to be 
carried out for development. Responsibilities of QA team are planning testing execution 
process. QA Lead creates the time tables and agrees on a Quality Assurance plan for the 
product. QA team communicated QA process to the team members. QA team ensures 
traceability of test cases to requirements. Q13. What is the difference between build and 
release? BUILD: is a number given to installable software that is given to testing team for 
testing by the development team. Build number assigned are incremental and sequential. 
RELEASE: is a number given to installable software that is handed over to customer by 
the developer or tester. The information of build, release and version are displayed in 
software help page. Using this build and release customer can let the customer team 
know which release version build thet are using. 
 GARUDATRAININGS.COM +1-508-841-6144 eg "9.4.123.2" (Release 
Number.Version Number.Build Number.Patch Number) Q14. What are the key 
challenges of software testing? Following are some challenges of software testing 1. 
Application should be stable enough to be tested. 2. Testing always under time constraint 
3. Understanding requirements, Domain knowledge and business user perspective
understanding 4. Which tests to execute first? 5. Testing the Complete Application 6. 
Regression testing 7. Lack of skilled testers. 8. Changing requirements 9. Lack of 
resources, tools and training Q15.Why you choose automated testing over manual 
testing? The reasons for choosing automation testing over manual testing are following: 
1. Frequency of use of test case 2. Time Comparison (automated script run much faster 
than manual execution.) 3. Reusability of Automation Script 4. Adaptability of test case 
for automation. 5. Exploitation of automation tool. Q16. What is the basis for choosing 
the SDLC model for development of software? The choice of SDLC depends on the 
various factors, how stable are the requirements:    When the requirements are very 
clearly know, documented and not subject to change then we can follow the waterfall 
model. Most of the companies follow the V mode for the development because this 
model includes both verification and validation activities and testing is involved in earlier 
phase. Iterative model can be used to build application where requirement changes after a 
period of times or application features or added on with smaller release. When the client 
is ready for the delivery of the product in parts or phases. Q17. Explain bug leakage and 
bug release. Bug Leakage: When customer or end user discovered a bug which can be 
detected by the testing team. Or when a bug is detected which can be detected in pervious 
build then this is called as Bug Leakage. 
 GARUDATRAININGS.COM +1-508-841-6144 Bug release: is when a build is handed 
to testing team with knowing that defect is present in the release. The priority and 
severity of bug is low. It is done when customer want the application on the time. 
Customer can tolerate the bug in the released then the delay in getting the application and 
the cost involved in removing that bug. These bugs are mentioned in the Release Notes 
handed to client for the future improvement chances. Q18. What is regression testing? 
Regression Testing: When changes in the code of the software are made to fix the 
previous bug. Then testing needs to be perform to ensure that it will not generate a new 
bug in the application and it works as specified and that it has not negatively impacted 
any functionality that it offered previously. Regression Testing is important because of 
following reason:    That the application works even after the alteration in the code 
were made. The original functionality continues to work as specified even after doing 
changes in the software application. The alteration to the software application has not 
introduced any new bugs. Q19.What is data driven testing? Data Driven is an automation 
testing part in which test input or output values, these values are read from data files. It is 
performed when the values are changing by the time. The different data files may include 
data pools, csv files, Excel files. The data is then loaded into variables in recorded or 
manually coded scripts. For data driven testing we use Parameterzing and Regular 
expression Technique. Ex: To evaluate login functionality, we use different user name 
and password combinations, variables are used to access different username and 
password. The list of username and password are stored in a data table or excel sheet. 
Q20. What is alpha and beta testing? Alpha testing: is performed by the IN-House 
developers. After alpha testing the software is handed over to software QA team, for 
additional testing in an environment that is similar to the client environment. Beta testing: 
It is performed by end user. So that they can make sure that the product is bug free or 
working as per the requirement. IN-house developers and software QA team perform 
alpha testing. The public, a few select prospective customers or the general public 
performs beta testing.
 GARUDATRAININGS.COM +1-508-841-6144 Q21. What are test driver and test stub 
and why we need them? The Stub is called from the software component to be tested. It 
is used in top down approach. The driver calls a component to be tested. It is used in 
bottom up approach. Both test stub and test driver are dummy software components. 
We need test stub and test driver because of following reason:   Suppose we want to 
test the interface between modules A and B and we have developed only module A. So 
we cannot test module A but if a dummy module is prepare, using that we can test 
module A. Now module B cannot send or receive data from module A directly so, in 
these cases we have to transfer data from one module to another module by some external 
features. This external feature used is called Driver. Q22. What is Monkey testing? 
Monkey testing is a type of Black Box Testing used mostly at the Unit Level. In this 
tester enter the data in any format and check the software is not crashing. In this testing 
we use Smart monkey and Dumb monkey.   Smart monkeys are used for load and 
stress testing, they will help in finding the bugs. They are very expensive to develop. 
Dumb monkey, they are important for basic testing. They help in finding those bugs 
which are having high severity. Dumb monkey are less expensive as compare to Smart 
monkeys. Example: In phone number filed Symbols are entered. Q23. What is Bug 
Triage? Bug triage is a process to:      Ensure bug report completeness. Analyze and 
assign bug to proper component. Assign bug to proper bug owner. Set appropriate bug 
priority. Adjust bug severity properly. Q24. What is Traceability Matrix? Traceability 
Matrix is a method used to validate the compliance of product with requirements for that 
product. The requirement is written in a row of the matrix and the columns of the matrix. 
Now they are used to identify how and where each requirement has been addressed. 
 GARUDATRAININGS.COM +1-508-841-6144 It is in the form of table that correlates 
two base lined documents that require a many-to-many relationship. It is used with high 
level requirement and detailed requirement of the software product to the matching parts 
of high level design, detailed design, test plan, and test cases. The relationship to the 
source documents is required for both backward traceability and forward traceability. 
Q26. Explain paradigms for interfacing module. The paradigms for interfacing modules: 
   Procedure Call Interface: A procedure from one module calls to procedure of 
another module. The caller can pass data to the called procedure while calling and also 
the called procedure can pass data to the caller while returning control back to the caller 
procedure. Shared Memory: When a block of memory is shared between two modules. 
The memory block may be allocated by one of the two modules or third module of the 
same application. Message Passing Interface: One module generates a message and sends 
the message to another module. It helps in building up the communication between 
different process or modules. Q27. What are the factors responsible for the estimation of 
system integration test cycle and total integration time? The number of system integration 
test cycle and total integration time are determined by the following parameters:      
 Number of modules in the system. Relative complexity of the modules. Relative 
complexity of the interface between the modules. Number of modules needed to be 
clustered together in each test cycle. Whether the modules to be integrated have been 
adequately tested before. Turnaround time for each test-debug-fix cycle. Q28. What are 
the things the tests ensure? Test must ensure that:      The number of parameters 
sent in a message agrees with the number of parameters expected to receive. The 
parameter order in the message match the order expected. The field sizes and data type
match. When a message is generated from stored data prior to being sent, the message 
truly reflects the stored data. When a received message is stored, data copying is 
consistent with the received message. 
 GARUDATRAININGS.COM +1-508-841-6144 Q29. What is random testing? When 
test inputs are selected randomly from the input domain of the system, this is Random 
Testing. Random testing involve following procedure:     The input domain is 
selected. Test inputs are selected independently from the domain. The system under test 
is executed on these inputs. The inputs constitute a random test set. The results are 
compared to the system specification. The test is a failure if any input leads to incorrect 
results, otherwise it is a success. Q30. What are the benefits of Automated Testing? The 
benefits of Automation Testing are below:        Test engineer productivity. 
Coverage of regression testing. Reusability of test cases. Consistency in testing. Test 
interval reduction Reduced software maintenance cost Increased test effectiveness Q31. 
What is Agile Testing? Agile Testing means to quickly validation of the client 
requirements and make the application of good quality user interface. When the build is 
released to the testing team, testing of the application is started to find the bugs. As a 
Tester, we need to focus on the customer or end user requirements. We put the efforts to 
deliver the quality product in spite of short time frame which will further help in reducing 
the cost of development and test feedbacks will be implemented in the code which will 
avoid the defects coming from the end user. Q32. Describe Use Case Testing. Use Case: 
A use case is a description of the process which is performed by the end user for a 
particular task. Use case contains a sequence of step which is performed by the end user 
to complete a specific task or a step by step process that describe how the application and 
end user interact with each other. Use case is written by the user point of view. Use case 
Testing: the use case testing uses this use case to evaluate the application. So that, the 
tester can examines all the functionalities of the application. Use case testing cover whole 
application, tester performs this testing in step by step process to complete one task. 
 GARUDATRAININGS.COM +1-508-841-6144 Q33. What type of tests you perform on 
the web based application? For web application we perform following time of test: 1. 
Functionality Testing. 2. Usability Testing. 3. Navigation Testing. 4. Configuration and 
Compatibility testing. 5. Reliability and Availability Testing. 6. Performance Testing. 7. 
Load and Stress Testing. 8. Security Testing Q34. What is Gantt Chart? A Gantt Chart is 
used to represent a project schedule that includes duration of individual tasks or phases, 
their dependencies and ordering.     It displays the start and end points of each task 
and the percentage of completion of each task It allows the planner to assess the duration 
of a project, identify the resources needed, and lay out the order in which tasks need to be 
performed. It is useful in managing the dependencies between tasks. Using Gantt chart 
each team member can view the product development schedule. Q35 How to find all the 
Bugs during first round of Testing? There could be several reasons for not debugging the 
entire bug in the first round of testing process. Debugging the showstopper in the first or 
second build is almost impossible. A found defect can cover up the other defects in the 
application. The thread which leads to on defect could be redirected to another defect, as 
the tester find the bug and lock that bug in report and after fixing of those bugs new bugs 
may also arises. It is difficult to keep testing on a known defective application. That is the 
reason we cannot find all the bug in first run and also we cannot perform Exhaustive 
testing. Q36 How can u prepares the Test Plan without SRS? We can prepare a test plan
directly without having SRS, When the Requirements and URD(User Requirement 
Document )are available to us. URD is very helpful to determine the requirement of the 
user. The SRS document only contains the requirement of the user, but tester can also 
determine the requirement form the product. Without having SRS document we cannot 
estimate the Testing effort and cost of testing if we do not have SRS. SRS tell us on 
which platform our software is going to be used and on basis of this we perform the test 
on the application. Some time end user want to know what type of testing we are going to 
execute on the application for this we can send our test plan to the client. 
 GARUDATRAININGS.COM +1-508-841-6144 Q37. What is the purpose of test 
strategy? We need Test Strategy for the following reason: 1. To have a signed, sealed, 
and delivered document, where the document contains details about the testing 
methodology, test plan, and test cases. 2. Test strategy document tells us how the 
software product will be tested. 3. Test strategy document helps to review the test plan 
with the project team members. 4. It describes the roles, responsibilities and the resources 
required for the test and schedule. 5. When we create a test strategy document, we have 
to put into writing any testing issues requiring resolution. 6. The test strategy is decided 
first, before lower level decisions are made on the test plan, test design, and other testing 
issues. Q38. What are the dimensions of the Risks? The dimensions of the risk are 
described below: Schedule: Unrealistic schedules. to develop a huge software in a single 
day.. Client: Ambiguous requirements definition, requirement and not clear, changes in 
the requirement etc. Human Resources: Non-availability of sufficient resources with the 
skill level expected in the project. System Resources: Non-availability of procuring all 
critical computer resources either hardware and software tools or licenses for software 
will have an adverse impact. Quality: Compound factors like lack of resources along with 
a tight delivery schedule and frequent changes to requirements will have an impact on the 
quality of the product tested. Q39. How to Estimate Testing effort ? Time Estimation 
method for Testing Process: Step 1 : count number of use cases (NUC) of system Step 2 : 
Set Avg. Time Test Cases(ATTC) as per test plan Step 3 : Estimate total number of test 
cases (NTC) Total number of test cases = Number of Use Cases X Avg. Test Cases per a 
use case Step 4 : Set Avg. Execution Time (AET) per a test case Step 5 : Calculate Total 
Execution Time (TET) TET = Total number of test cases * AET Step 6 : Calculate Test 
Case Creation Time (TCCT) usually we will take 1.5 times of TET as TCCT TCCT = 1.5 
* TET Step 7 : Time for Re-Test Case Execution (RTCE) this is for retesting usually we 
take 0.5 times of TET RTCE = 0.5 * TET Step 8 : Set Report generation Time (RGT 
 GARUDATRAININGS.COM +1-508-841-6144 usually we take 0.2 times of TET RGT 
= 0.2 * TET Step 9 : Set Test Environment Setup Time (TEST) it also depends on test 
plan Step 10 : Total Estimation time = TET + TCCT+ RTCE + RGT + TEST + some 
buffer. Q40. How to create requirements test matrix template? For a requirements test 
matrix template we perform following step: Step 1: Find out number of requirements. 
Step 2: Find out number of test cases. Step 3: Create a table based on these. Let we have 
10 requirements and 40 test cases, then we create a table of 11 rows and 41 columns. Step 
4: On the first column of table copy all your 10 requirement numbers, and paste them into 
rows 2 through 11 of the table. Step 5: Now copy all 40 test case numbers, and paste 
them into columns 2 through 41 of the table. Step 6: Examine each of your 40 test cases, 
determine which of the 10 requirements they satisfy. Q41. Can you perform regression 
testing performed manually? Yes we can perform regression testing manually, but it
requires lots of effort. To choose the way of doing the regression testing is totally 
depends on the initial testing approach. If the initial testing approach was manual testing, 
then the regression testing is usually performed manually. In case, if the initial testing 
approach was automated testing, then the regression testing is usually performed by 
automated testing. Automated regression testing is very easy task. Q42. You are a tester. 
Now How will you choose which defect to remove in 1000000 defects? First thing testers 
are not responsible for fixing the bug they are only responsible for debugging the bug and 
prioritizing those bugs. These bugs are now reported in bug report template with the 
severity and priority of the bug. Tester assigns severity level to the defects depending 
upon their impact on other parts of application. Every bug has its severity and priority 
values assign by tester. If a defect does not allow you to go ahead and test the product, it 
is critical one so it has to be fixed as soon as possible. We have 5 levels as:      
Critical High Medium Low Cosmetic Q43.How do you perform integration testing? 
 GARUDATRAININGS.COM +1-508-841-6144 Integration testing is black box testing. 
Integration testing focuses on the interfaces between units, to make sure the units work 
together. For integration testing we ensure that all units testing of the each component is 
performed earlier. Integration testing begins only after the unit testing. The purpose of 
integration testing is to ensure different components of the application interact with each 
other. So that, components work as per the customer requirements. Test cases are 
developed with the purpose of exercising the interfaces between the components. 
Integration testing is considered complete, when actual results and expected results are 
same. Q44. What is the testing lifecycle? There is no standard testing life cycle, but it is 
consist of following phases:       Test Planning (Test Strategy, Test Plan, Test Bed 
Creation) Test Development (Test Procedures, Test Scenarios, Test Cases) Test 
Execution Result Analysis (compare Expected to Actual results) Defect Tracking 
Reporting Q45.What is good code? A good code is code that works. The good code must 
not contain the defect or bug and is readable by other developers and easily maintainable. 
Organizations have coding standards all developers should follow, and also every 
programmer and software engineer has different ideas about what is best and what are too 
many or too few rules. We need to keep in mind that excessive use of rules can decrease 
both productivity and creativity. Peer reviews and code analysis tools can be used to 
check for problems and enforce standards. Q46. What are the main attributes of test 
automation? The main attributes are discussed below: Maintainability: For each new 
release need to update the test automation suites. Reliabil ity: Accuracy and repeatability 
of the test automation. Flexibility: Ease of working with all the different kinds of 
automation test ware. Efficiency: Total cost related to the effort needed for the 
automation. Portability: Ability of the automated test to run on different environments. 
Robustness: Effectiveness of automation on an unstable or rapidly changing system. 
Usability: Extent to which automation can be used by different types of user. Q47. What 
could go wrong with test automation? 
 GARUDATRAININGS.COM +1-508-841-6144 Followings things may be go wrong in 
test automation:       Ignoring automation, while planning the development phases. 
In design Phase not choosing the right technology. In coding Phase not automating the 
right test cases. Tool selection might go wrong. Test script not be updated when 
application is continuously changing. Test data should be unique, if the same data is 
available on the application then the application will not accept the data that we are going
to add via automation. Q48. What tools are available to support testing during 
development of application? Following tools can be used to support testing during 
development of application:     Test management tools example: Quality Center, 
JIRA. Defect management tool example: Bugzilla, Test Director. Project management: 
Sharepoint. Automation tools: QTP, RFT, WinRunner. Q49. What are the tests activities 
that you want to automate in a project? The following testing activities can be automated: 
     Functional tests: Identify some P1 and P2 cases which are most critical for 
project success and operations and automate them. After every new build, these scripts 
will assure the fixes does not broke any of the critical functionality. Regression test 
suites: Test the need to be run after each build. Performance tests: Identical test the need 
to be run on different browser. Stress tests Load tests Q50. What is the difference in 
responsibilities of Programmers and QA analyst? The differences in responsibilities are 
listed below:     QA is concern for Process Quality and Programmers are concern for 
Product Quality. QA ensure that the processes used for developing the product of high 
quality where as programmers used these processes so that end product is of good 
quality. Processes are decided by QA. Programmers are supposed to follow the processes 
so that they can produce a good quality product. Any issue found during execution of 
process by the programmers is communicated to the QA so that they can improve the 
process. 
************************************************************************************* 
************************************************************************************* 
*****8

More Related Content

What's hot (19)

DOC
38475471 qa-and-software-testing-interview-questions-and-answers
Maria FutureThoughts
 
PPT
Test plan
Mahfuz1061
 
DOCX
Manual testing interview questions and answers
karanmca
 
PDF
Agile testing: from Quality Assurance to Quality Assistance
Luca Giovenzana
 
PDF
Fundamentals of testing 1
Hoang Nguyen
 
PDF
Fundamentals of Testing 2
Hoang Nguyen
 
DOCX
General technical interview questions
Kevalkumar Shah
 
PDF
software testing for beginners
Bharathi Ashok
 
PPT
Manual testing ppt
Santosh Maranabasari
 
PDF
Software Testing Principles
Kanoah
 
PPTX
Basics in software testing
TOPS Technologies
 
PPTX
Software testing-in-gurgaon
AP EDUSOFT
 
PDF
Introduction to automation testing
onewomanmore witl
 
PPTX
Importance of a Test Management Tool for Your Project
Sarah Elson
 
PPT
Sdlc
Mahfuz1061
 
PDF
Software testing interview Q&A – Part 2
Khoa Bui
 
PPT
Beginners QA Testing
Danielle Mickey
 
DOCX
Testing concept definition
Vivek V
 
PDF
Software testing
Kalyan Vadapalli
 
38475471 qa-and-software-testing-interview-questions-and-answers
Maria FutureThoughts
 
Test plan
Mahfuz1061
 
Manual testing interview questions and answers
karanmca
 
Agile testing: from Quality Assurance to Quality Assistance
Luca Giovenzana
 
Fundamentals of testing 1
Hoang Nguyen
 
Fundamentals of Testing 2
Hoang Nguyen
 
General technical interview questions
Kevalkumar Shah
 
software testing for beginners
Bharathi Ashok
 
Manual testing ppt
Santosh Maranabasari
 
Software Testing Principles
Kanoah
 
Basics in software testing
TOPS Technologies
 
Software testing-in-gurgaon
AP EDUSOFT
 
Introduction to automation testing
onewomanmore witl
 
Importance of a Test Management Tool for Your Project
Sarah Elson
 
Software testing interview Q&A – Part 2
Khoa Bui
 
Beginners QA Testing
Danielle Mickey
 
Testing concept definition
Vivek V
 
Software testing
Kalyan Vadapalli
 

Viewers also liked (9)

PPTX
La adolescencia y la autoestima
Ana Godoy
 
PPTX
Top 8 finance consultant resume samples
fumarichsi
 
PPT
Bharti axa
Supreeth Amruth
 
PPTX
Top 8 insurance consultant resume samples
fumarichsi
 
PPTX
Celula 3
jmedina05
 
PPTX
Vowels
Sunny River
 
PPTX
Top 8 immigration consultant resume samples
fumarichsi
 
PPTX
Top 8 investment consultant resume samples
fumarichsi
 
PDF
The asylum of horrors 001
LUIS NARBONA
 
La adolescencia y la autoestima
Ana Godoy
 
Top 8 finance consultant resume samples
fumarichsi
 
Bharti axa
Supreeth Amruth
 
Top 8 insurance consultant resume samples
fumarichsi
 
Celula 3
jmedina05
 
Vowels
Sunny River
 
Top 8 immigration consultant resume samples
fumarichsi
 
Top 8 investment consultant resume samples
fumarichsi
 
The asylum of horrors 001
LUIS NARBONA
 
Ad

Similar to Qa interview questions and answers (20)

PDF
Qa interview questions and answers for placements
Garuda Trainings
 
PDF
QA interview questions and answers
Mehul Chauhan
 
PDF
Manual testing interview questions and answers
Testbytes
 
PPTX
1651003086422.pptx
Sravya221181
 
DOCX
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Computer Trainings Online
 
PDF
Manual Testing Interview Questions | Edureka
Edureka!
 
PDF
Manual Testing real time questions .pdf
TiktokIndia2
 
PDF
Software testing q as collection by ravi
Ravindranath Tagore
 
DOCX
Manual Testing Interview Questions & Answers.docx
ssuser305f65
 
PPTX
Software testing & Quality Assurance
Webtech Learning
 
PPT
Software Engineering (Software Quality Assurance & Testing: Supplementary Mat...
ShudipPal
 
PPTX
Software Testing interview - Q&A and tips
Pankaj Dubey
 
PDF
Manual testing
Mehul Chauhan
 
PPTX
Manual testing interview questions and answers
Rajnish Sharma
 
ODP
Testing Software
Sibel Kuzgun AKIN
 
PPTX
Software Quality Assurance
Saqib Raza
 
PDF
Manual Tester Interview Questions(1).pdf
SupriyaDongare
 
PPTX
Learn sqa from expert class 2reviewed
Sharmin Khan Urmi
 
PDF
Mastering Software Testing: The Ultimate Guide to Quality Assurance
akshat4957
 
Qa interview questions and answers for placements
Garuda Trainings
 
QA interview questions and answers
Mehul Chauhan
 
Manual testing interview questions and answers
Testbytes
 
1651003086422.pptx
Sravya221181
 
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Computer Trainings Online
 
Manual Testing Interview Questions | Edureka
Edureka!
 
Manual Testing real time questions .pdf
TiktokIndia2
 
Software testing q as collection by ravi
Ravindranath Tagore
 
Manual Testing Interview Questions & Answers.docx
ssuser305f65
 
Software testing & Quality Assurance
Webtech Learning
 
Software Engineering (Software Quality Assurance & Testing: Supplementary Mat...
ShudipPal
 
Software Testing interview - Q&A and tips
Pankaj Dubey
 
Manual testing
Mehul Chauhan
 
Manual testing interview questions and answers
Rajnish Sharma
 
Testing Software
Sibel Kuzgun AKIN
 
Software Quality Assurance
Saqib Raza
 
Manual Tester Interview Questions(1).pdf
SupriyaDongare
 
Learn sqa from expert class 2reviewed
Sharmin Khan Urmi
 
Mastering Software Testing: The Ultimate Guide to Quality Assurance
akshat4957
 
Ad

Recently uploaded (20)

PPTX
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
PDF
Top Agile Project Management Tools for Teams in 2025
Orangescrum
 
PDF
TheFutureIsDynamic-BoxLang witch Luis Majano.pdf
Ortus Solutions, Corp
 
PPTX
Agentic Automation Journey Series Day 2 – Prompt Engineering for UiPath Agents
klpathrudu
 
PDF
SciPy 2025 - Packaging a Scientific Python Project
Henry Schreiner
 
PDF
How to Hire AI Developers_ Step-by-Step Guide in 2025.pdf
DianApps Technologies
 
PDF
SAP Firmaya İade ABAB Kodları - ABAB ile yazılmıl hazır kod örneği
Salih Küçük
 
PPTX
Customise Your Correlation Table in IBM SPSS Statistics.pptx
Version 1 Analytics
 
PPTX
Foundations of Marketo Engage - Powering Campaigns with Marketo Personalization
bbedford2
 
PPTX
Empowering Asian Contributions: The Rise of Regional User Groups in Open Sour...
Shane Coughlan
 
PDF
vMix Pro 28.0.0.42 Download vMix Registration key Bundle
kulindacore
 
PDF
Empower Your Tech Vision- Why Businesses Prefer to Hire Remote Developers fro...
logixshapers59
 
PPTX
Comprehensive Risk Assessment Module for Smarter Risk Management
EHA Soft Solutions
 
PDF
Odoo CRM vs Zoho CRM: Honest Comparison 2025
Odiware Technologies Private Limited
 
PPTX
ChiSquare Procedure in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
PDF
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
PPTX
Home Care Tools: Benefits, features and more
Third Rock Techkno
 
PDF
Technical-Careers-Roadmap-in-Software-Market.pdf
Hussein Ali
 
PDF
MiniTool Partition Wizard 12.8 Crack License Key LATEST
hashhshs786
 
PDF
iTop VPN With Crack Lifetime Activation Key-CODE
utfefguu
 
Agentic Automation: Build & Deploy Your First UiPath Agent
klpathrudu
 
Top Agile Project Management Tools for Teams in 2025
Orangescrum
 
TheFutureIsDynamic-BoxLang witch Luis Majano.pdf
Ortus Solutions, Corp
 
Agentic Automation Journey Series Day 2 – Prompt Engineering for UiPath Agents
klpathrudu
 
SciPy 2025 - Packaging a Scientific Python Project
Henry Schreiner
 
How to Hire AI Developers_ Step-by-Step Guide in 2025.pdf
DianApps Technologies
 
SAP Firmaya İade ABAB Kodları - ABAB ile yazılmıl hazır kod örneği
Salih Küçük
 
Customise Your Correlation Table in IBM SPSS Statistics.pptx
Version 1 Analytics
 
Foundations of Marketo Engage - Powering Campaigns with Marketo Personalization
bbedford2
 
Empowering Asian Contributions: The Rise of Regional User Groups in Open Sour...
Shane Coughlan
 
vMix Pro 28.0.0.42 Download vMix Registration key Bundle
kulindacore
 
Empower Your Tech Vision- Why Businesses Prefer to Hire Remote Developers fro...
logixshapers59
 
Comprehensive Risk Assessment Module for Smarter Risk Management
EHA Soft Solutions
 
Odoo CRM vs Zoho CRM: Honest Comparison 2025
Odiware Technologies Private Limited
 
ChiSquare Procedure in IBM SPSS Statistics Version 31.pptx
Version 1 Analytics
 
Automate Cybersecurity Tasks with Python
VICTOR MAESTRE RAMIREZ
 
Home Care Tools: Benefits, features and more
Third Rock Techkno
 
Technical-Careers-Roadmap-in-Software-Market.pdf
Hussein Ali
 
MiniTool Partition Wizard 12.8 Crack License Key LATEST
hashhshs786
 
iTop VPN With Crack Lifetime Activation Key-CODE
utfefguu
 

Qa interview questions and answers

  • 1. Qa interview questions and answers Follow    by Garuda Trainings on Feb 25, 2014  1,426 views Qa interview questions and answers.    nidhi patel, QA Engineer at Grace Strategies Pvt Ltd 2 weeks ago Qa interview questions and answers Document Transcript  GARUDATRAININGS.COM +1-508-841-6144 QA Interview Questions And Answers 2013 Q1. What is difference between QA, QC and Software Testing? Quality Assurance (QA): QA refers to the planned and systematic way of monitoring the quality of process which is followed to produce a quality product. QA tracks the outcomes and adjusts the process to meet the expectation. Quality Control (QC): Concern with the quality of the product. QC finds the defects and suggests improvements. The process set by QA is implemented by QC. The QC is the responsibility of the tester. Software Testing: is the process of ensuring that product which is developed by the developer meets the user requirement. The motive to perform testing is to find the bugs and make sure that they get
  • 2. fixed. Q2. When to start QA in a project? A good time to start the QA is from the beginning of the project startup. This will lead to plan the process which will make sure that product coming out meets the customer quality expectation. QA also plays a major role in the communication between teams. It gives time to step up the testing environment. The testing phase starts after the test plans are written, reviewed and approved. Q3. What are verification and validation and difference between these two? Verification: process of evaluating steps which is followed up to development phase to determine whether they meet the specified requirements for that stage. Validation: process of evaluating product during or at the end of the development process to determine whether product meets specified requirements. Difference between Verification and Validation:      Verification is Static Testing where as Validations is Dynamic Testing. Verification takes place before validation. Verification evaluates plans, documents, requirements and specifications, where as Validation evaluates product. Verification inputs are checklist, issues list, walkthroughs and inspection, where as in Validation testing of actual product. Verification output is set of documents, plans, specifications and requirement documents where as in Validation actual product is output. Q4. What is difference between Smoke testing and Sanity Testing?  GARUDATRAININGS.COM +1-508-841-6144 The difference between smoke and sanity testing is described below:     Sanity testing is performed when new build is released after fixing bugs where as smoke testing is performed to check the major functionalities of the application. Sanity is performed by the tester or the developer but smoke testing can be performed by the tester or developer. Smoke testing is performed earlier where as sanity is performed after the smoke testing. Sanity testing is narrow and deep approach of testing and smoke testing is focused testing based on major functionalities. Q5. What is destructive testing, and what are its benefits? Destructive testing includes methods where material is broken down to evaluate the mechanical properties, such as strength, toughness and hardness. For example, finding the quality of a weld is good enough to withstand extreme pressure and also to verify the properties of a material. Benefits of Destructive Testing (DT)     Verifies properties of a material Determines quality of welds Helps you to reduce failures, accidents and costs Ensures compliance with regulations Q6. What is Testware? The testware is:    The subset of software which helps in performing the testing of application. Testware are required to plan, design, and execute tests. It contains documents, scripts, inputs, expected results, set-up and additional software or utilities used in testing. Testware is term given to combination of all utilities and application software that required for testing a software package. Testware is special because it has: 1. Different purpose 2. Different metrics for quality and 3. Different users  GARUDATRAININGS.COM +1-508-841-6144 Q7. What is difference between Retesting and Regression testing? The difference between Retesting and Regression testing are below:     Retesting is done to verify defects fixes where as regression is perform to check if the defect fix have not impacted other functionality that was working fine before doing changes in the code. Retesting is planned testing based on the defect fixes listed where as regression is not be always specific to any defect fix. Also regression can be executed for some modules or all modules. Retesting concern with executing those test cases that are failed earlier whereas regression concern with executing test cases that was passed in earlier builds. Retesting has higher priority over
  • 3. regression, but in some case retesting and regression testing are carried out in parallel. Q8. Explain bug life cycle. Bug Life Cycle:         When a tester finds a bug .The bug is assigned with NEW or OPEN status. The bug is assigned to development project manager who will analyze the bug .He will check whether it is a valid defect. If it is not valid bug is rejected, now status is REJECTED. If not, next the defect is checked whether it is in scope. When bug is not part of the current release .Such defects are POSTPONED Now, Tester checks whether similar defect was raised earlier. If yes defect is assigned a status DUPLICATE When bug is assigned to developer. During this stage bug is assigned a status INPROGRESS Once code is fixed. Defect is assigned with FIXED status. Next the tester will re-test the code. In case the test case passes the defect is CLOSED If the test case fails again the bug is RE-OPENED and assigned to the developer. That’s all to Bug Life Cycle. Q9. What is severity and priority of bug? Give some example. Priority: concern with application from the business point of view. It answers: How quickly we need to fix the bug? Or How soon the bug should get fixed? Severity: concern with functionality of application. It deals with the impact of the bug on the application. How much the bug is affecting the functionality of the application? Ex.  GARUDATRAININGS.COM     +1-508-841-6144 High Priority and Low Severity: Company logo is not properly displayed on their website. High Priority and High Severity: Suppose you are doing online shopping and filled payment information, but after submitting the form, you get a message like "Order has been cancelled." Low Priority and High Severity: If we have a typical scenario in which the application get crashed, but that scenario exists rarely. Low Priority and Low Severity: There is a mistake like "You have registered success" instead of successfully, success is written. Q10. What are the common problems with software automation? Software problem are listed below: 1. Purchasing the license of tool (QTP, selenium, QC, LR) 2. Lack of skilled Tester to run the tool 3. Expectation that automated tests will find a lot of new defects 4. Maintenance of automated tests 5. Technical problems of tools Q11. What is the role of QA in a project development? QA stands for QUALITY ASSURANCE. QA team assures the quality by monitor the whole development process. QA tracks the outcomes and adjusting process to meet the expectation. The role of Quality Assurance is discussed below:      QA team is responsible for monitoring the process to be carried out for development. Responsibilities of QA team are planning testing execution process. QA Lead creates the time tables and agrees on a Quality Assurance plan for the product. QA team communicated QA process to the team members. QA team ensures traceability of test cases to requirements. Q13. What is the difference between build and release? BUILD: is a number given to installable software that is given to testing team for testing by the development team. Build number assigned are incremental and sequential. RELEASE: is a number given to installable software that is handed over to customer by the developer or tester. The information of build, release and version are displayed in software help page. Using this build and release customer can let the customer team know which release version build thet are using.  GARUDATRAININGS.COM +1-508-841-6144 eg "9.4.123.2" (Release Number.Version Number.Build Number.Patch Number) Q14. What are the key challenges of software testing? Following are some challenges of software testing 1. Application should be stable enough to be tested. 2. Testing always under time constraint 3. Understanding requirements, Domain knowledge and business user perspective
  • 4. understanding 4. Which tests to execute first? 5. Testing the Complete Application 6. Regression testing 7. Lack of skilled testers. 8. Changing requirements 9. Lack of resources, tools and training Q15.Why you choose automated testing over manual testing? The reasons for choosing automation testing over manual testing are following: 1. Frequency of use of test case 2. Time Comparison (automated script run much faster than manual execution.) 3. Reusability of Automation Script 4. Adaptability of test case for automation. 5. Exploitation of automation tool. Q16. What is the basis for choosing the SDLC model for development of software? The choice of SDLC depends on the various factors, how stable are the requirements:    When the requirements are very clearly know, documented and not subject to change then we can follow the waterfall model. Most of the companies follow the V mode for the development because this model includes both verification and validation activities and testing is involved in earlier phase. Iterative model can be used to build application where requirement changes after a period of times or application features or added on with smaller release. When the client is ready for the delivery of the product in parts or phases. Q17. Explain bug leakage and bug release. Bug Leakage: When customer or end user discovered a bug which can be detected by the testing team. Or when a bug is detected which can be detected in pervious build then this is called as Bug Leakage.  GARUDATRAININGS.COM +1-508-841-6144 Bug release: is when a build is handed to testing team with knowing that defect is present in the release. The priority and severity of bug is low. It is done when customer want the application on the time. Customer can tolerate the bug in the released then the delay in getting the application and the cost involved in removing that bug. These bugs are mentioned in the Release Notes handed to client for the future improvement chances. Q18. What is regression testing? Regression Testing: When changes in the code of the software are made to fix the previous bug. Then testing needs to be perform to ensure that it will not generate a new bug in the application and it works as specified and that it has not negatively impacted any functionality that it offered previously. Regression Testing is important because of following reason:    That the application works even after the alteration in the code were made. The original functionality continues to work as specified even after doing changes in the software application. The alteration to the software application has not introduced any new bugs. Q19.What is data driven testing? Data Driven is an automation testing part in which test input or output values, these values are read from data files. It is performed when the values are changing by the time. The different data files may include data pools, csv files, Excel files. The data is then loaded into variables in recorded or manually coded scripts. For data driven testing we use Parameterzing and Regular expression Technique. Ex: To evaluate login functionality, we use different user name and password combinations, variables are used to access different username and password. The list of username and password are stored in a data table or excel sheet. Q20. What is alpha and beta testing? Alpha testing: is performed by the IN-House developers. After alpha testing the software is handed over to software QA team, for additional testing in an environment that is similar to the client environment. Beta testing: It is performed by end user. So that they can make sure that the product is bug free or working as per the requirement. IN-house developers and software QA team perform alpha testing. The public, a few select prospective customers or the general public performs beta testing.
  • 5.  GARUDATRAININGS.COM +1-508-841-6144 Q21. What are test driver and test stub and why we need them? The Stub is called from the software component to be tested. It is used in top down approach. The driver calls a component to be tested. It is used in bottom up approach. Both test stub and test driver are dummy software components. We need test stub and test driver because of following reason:   Suppose we want to test the interface between modules A and B and we have developed only module A. So we cannot test module A but if a dummy module is prepare, using that we can test module A. Now module B cannot send or receive data from module A directly so, in these cases we have to transfer data from one module to another module by some external features. This external feature used is called Driver. Q22. What is Monkey testing? Monkey testing is a type of Black Box Testing used mostly at the Unit Level. In this tester enter the data in any format and check the software is not crashing. In this testing we use Smart monkey and Dumb monkey.   Smart monkeys are used for load and stress testing, they will help in finding the bugs. They are very expensive to develop. Dumb monkey, they are important for basic testing. They help in finding those bugs which are having high severity. Dumb monkey are less expensive as compare to Smart monkeys. Example: In phone number filed Symbols are entered. Q23. What is Bug Triage? Bug triage is a process to:      Ensure bug report completeness. Analyze and assign bug to proper component. Assign bug to proper bug owner. Set appropriate bug priority. Adjust bug severity properly. Q24. What is Traceability Matrix? Traceability Matrix is a method used to validate the compliance of product with requirements for that product. The requirement is written in a row of the matrix and the columns of the matrix. Now they are used to identify how and where each requirement has been addressed.  GARUDATRAININGS.COM +1-508-841-6144 It is in the form of table that correlates two base lined documents that require a many-to-many relationship. It is used with high level requirement and detailed requirement of the software product to the matching parts of high level design, detailed design, test plan, and test cases. The relationship to the source documents is required for both backward traceability and forward traceability. Q26. Explain paradigms for interfacing module. The paradigms for interfacing modules:    Procedure Call Interface: A procedure from one module calls to procedure of another module. The caller can pass data to the called procedure while calling and also the called procedure can pass data to the caller while returning control back to the caller procedure. Shared Memory: When a block of memory is shared between two modules. The memory block may be allocated by one of the two modules or third module of the same application. Message Passing Interface: One module generates a message and sends the message to another module. It helps in building up the communication between different process or modules. Q27. What are the factors responsible for the estimation of system integration test cycle and total integration time? The number of system integration test cycle and total integration time are determined by the following parameters:       Number of modules in the system. Relative complexity of the modules. Relative complexity of the interface between the modules. Number of modules needed to be clustered together in each test cycle. Whether the modules to be integrated have been adequately tested before. Turnaround time for each test-debug-fix cycle. Q28. What are the things the tests ensure? Test must ensure that:      The number of parameters sent in a message agrees with the number of parameters expected to receive. The parameter order in the message match the order expected. The field sizes and data type
  • 6. match. When a message is generated from stored data prior to being sent, the message truly reflects the stored data. When a received message is stored, data copying is consistent with the received message.  GARUDATRAININGS.COM +1-508-841-6144 Q29. What is random testing? When test inputs are selected randomly from the input domain of the system, this is Random Testing. Random testing involve following procedure:     The input domain is selected. Test inputs are selected independently from the domain. The system under test is executed on these inputs. The inputs constitute a random test set. The results are compared to the system specification. The test is a failure if any input leads to incorrect results, otherwise it is a success. Q30. What are the benefits of Automated Testing? The benefits of Automation Testing are below:        Test engineer productivity. Coverage of regression testing. Reusability of test cases. Consistency in testing. Test interval reduction Reduced software maintenance cost Increased test effectiveness Q31. What is Agile Testing? Agile Testing means to quickly validation of the client requirements and make the application of good quality user interface. When the build is released to the testing team, testing of the application is started to find the bugs. As a Tester, we need to focus on the customer or end user requirements. We put the efforts to deliver the quality product in spite of short time frame which will further help in reducing the cost of development and test feedbacks will be implemented in the code which will avoid the defects coming from the end user. Q32. Describe Use Case Testing. Use Case: A use case is a description of the process which is performed by the end user for a particular task. Use case contains a sequence of step which is performed by the end user to complete a specific task or a step by step process that describe how the application and end user interact with each other. Use case is written by the user point of view. Use case Testing: the use case testing uses this use case to evaluate the application. So that, the tester can examines all the functionalities of the application. Use case testing cover whole application, tester performs this testing in step by step process to complete one task.  GARUDATRAININGS.COM +1-508-841-6144 Q33. What type of tests you perform on the web based application? For web application we perform following time of test: 1. Functionality Testing. 2. Usability Testing. 3. Navigation Testing. 4. Configuration and Compatibility testing. 5. Reliability and Availability Testing. 6. Performance Testing. 7. Load and Stress Testing. 8. Security Testing Q34. What is Gantt Chart? A Gantt Chart is used to represent a project schedule that includes duration of individual tasks or phases, their dependencies and ordering.     It displays the start and end points of each task and the percentage of completion of each task It allows the planner to assess the duration of a project, identify the resources needed, and lay out the order in which tasks need to be performed. It is useful in managing the dependencies between tasks. Using Gantt chart each team member can view the product development schedule. Q35 How to find all the Bugs during first round of Testing? There could be several reasons for not debugging the entire bug in the first round of testing process. Debugging the showstopper in the first or second build is almost impossible. A found defect can cover up the other defects in the application. The thread which leads to on defect could be redirected to another defect, as the tester find the bug and lock that bug in report and after fixing of those bugs new bugs may also arises. It is difficult to keep testing on a known defective application. That is the reason we cannot find all the bug in first run and also we cannot perform Exhaustive testing. Q36 How can u prepares the Test Plan without SRS? We can prepare a test plan
  • 7. directly without having SRS, When the Requirements and URD(User Requirement Document )are available to us. URD is very helpful to determine the requirement of the user. The SRS document only contains the requirement of the user, but tester can also determine the requirement form the product. Without having SRS document we cannot estimate the Testing effort and cost of testing if we do not have SRS. SRS tell us on which platform our software is going to be used and on basis of this we perform the test on the application. Some time end user want to know what type of testing we are going to execute on the application for this we can send our test plan to the client.  GARUDATRAININGS.COM +1-508-841-6144 Q37. What is the purpose of test strategy? We need Test Strategy for the following reason: 1. To have a signed, sealed, and delivered document, where the document contains details about the testing methodology, test plan, and test cases. 2. Test strategy document tells us how the software product will be tested. 3. Test strategy document helps to review the test plan with the project team members. 4. It describes the roles, responsibilities and the resources required for the test and schedule. 5. When we create a test strategy document, we have to put into writing any testing issues requiring resolution. 6. The test strategy is decided first, before lower level decisions are made on the test plan, test design, and other testing issues. Q38. What are the dimensions of the Risks? The dimensions of the risk are described below: Schedule: Unrealistic schedules. to develop a huge software in a single day.. Client: Ambiguous requirements definition, requirement and not clear, changes in the requirement etc. Human Resources: Non-availability of sufficient resources with the skill level expected in the project. System Resources: Non-availability of procuring all critical computer resources either hardware and software tools or licenses for software will have an adverse impact. Quality: Compound factors like lack of resources along with a tight delivery schedule and frequent changes to requirements will have an impact on the quality of the product tested. Q39. How to Estimate Testing effort ? Time Estimation method for Testing Process: Step 1 : count number of use cases (NUC) of system Step 2 : Set Avg. Time Test Cases(ATTC) as per test plan Step 3 : Estimate total number of test cases (NTC) Total number of test cases = Number of Use Cases X Avg. Test Cases per a use case Step 4 : Set Avg. Execution Time (AET) per a test case Step 5 : Calculate Total Execution Time (TET) TET = Total number of test cases * AET Step 6 : Calculate Test Case Creation Time (TCCT) usually we will take 1.5 times of TET as TCCT TCCT = 1.5 * TET Step 7 : Time for Re-Test Case Execution (RTCE) this is for retesting usually we take 0.5 times of TET RTCE = 0.5 * TET Step 8 : Set Report generation Time (RGT  GARUDATRAININGS.COM +1-508-841-6144 usually we take 0.2 times of TET RGT = 0.2 * TET Step 9 : Set Test Environment Setup Time (TEST) it also depends on test plan Step 10 : Total Estimation time = TET + TCCT+ RTCE + RGT + TEST + some buffer. Q40. How to create requirements test matrix template? For a requirements test matrix template we perform following step: Step 1: Find out number of requirements. Step 2: Find out number of test cases. Step 3: Create a table based on these. Let we have 10 requirements and 40 test cases, then we create a table of 11 rows and 41 columns. Step 4: On the first column of table copy all your 10 requirement numbers, and paste them into rows 2 through 11 of the table. Step 5: Now copy all 40 test case numbers, and paste them into columns 2 through 41 of the table. Step 6: Examine each of your 40 test cases, determine which of the 10 requirements they satisfy. Q41. Can you perform regression testing performed manually? Yes we can perform regression testing manually, but it
  • 8. requires lots of effort. To choose the way of doing the regression testing is totally depends on the initial testing approach. If the initial testing approach was manual testing, then the regression testing is usually performed manually. In case, if the initial testing approach was automated testing, then the regression testing is usually performed by automated testing. Automated regression testing is very easy task. Q42. You are a tester. Now How will you choose which defect to remove in 1000000 defects? First thing testers are not responsible for fixing the bug they are only responsible for debugging the bug and prioritizing those bugs. These bugs are now reported in bug report template with the severity and priority of the bug. Tester assigns severity level to the defects depending upon their impact on other parts of application. Every bug has its severity and priority values assign by tester. If a defect does not allow you to go ahead and test the product, it is critical one so it has to be fixed as soon as possible. We have 5 levels as:      Critical High Medium Low Cosmetic Q43.How do you perform integration testing?  GARUDATRAININGS.COM +1-508-841-6144 Integration testing is black box testing. Integration testing focuses on the interfaces between units, to make sure the units work together. For integration testing we ensure that all units testing of the each component is performed earlier. Integration testing begins only after the unit testing. The purpose of integration testing is to ensure different components of the application interact with each other. So that, components work as per the customer requirements. Test cases are developed with the purpose of exercising the interfaces between the components. Integration testing is considered complete, when actual results and expected results are same. Q44. What is the testing lifecycle? There is no standard testing life cycle, but it is consist of following phases:       Test Planning (Test Strategy, Test Plan, Test Bed Creation) Test Development (Test Procedures, Test Scenarios, Test Cases) Test Execution Result Analysis (compare Expected to Actual results) Defect Tracking Reporting Q45.What is good code? A good code is code that works. The good code must not contain the defect or bug and is readable by other developers and easily maintainable. Organizations have coding standards all developers should follow, and also every programmer and software engineer has different ideas about what is best and what are too many or too few rules. We need to keep in mind that excessive use of rules can decrease both productivity and creativity. Peer reviews and code analysis tools can be used to check for problems and enforce standards. Q46. What are the main attributes of test automation? The main attributes are discussed below: Maintainability: For each new release need to update the test automation suites. Reliabil ity: Accuracy and repeatability of the test automation. Flexibility: Ease of working with all the different kinds of automation test ware. Efficiency: Total cost related to the effort needed for the automation. Portability: Ability of the automated test to run on different environments. Robustness: Effectiveness of automation on an unstable or rapidly changing system. Usability: Extent to which automation can be used by different types of user. Q47. What could go wrong with test automation?  GARUDATRAININGS.COM +1-508-841-6144 Followings things may be go wrong in test automation:       Ignoring automation, while planning the development phases. In design Phase not choosing the right technology. In coding Phase not automating the right test cases. Tool selection might go wrong. Test script not be updated when application is continuously changing. Test data should be unique, if the same data is available on the application then the application will not accept the data that we are going
  • 9. to add via automation. Q48. What tools are available to support testing during development of application? Following tools can be used to support testing during development of application:     Test management tools example: Quality Center, JIRA. Defect management tool example: Bugzilla, Test Director. Project management: Sharepoint. Automation tools: QTP, RFT, WinRunner. Q49. What are the tests activities that you want to automate in a project? The following testing activities can be automated:      Functional tests: Identify some P1 and P2 cases which are most critical for project success and operations and automate them. After every new build, these scripts will assure the fixes does not broke any of the critical functionality. Regression test suites: Test the need to be run after each build. Performance tests: Identical test the need to be run on different browser. Stress tests Load tests Q50. What is the difference in responsibilities of Programmers and QA analyst? The differences in responsibilities are listed below:     QA is concern for Process Quality and Programmers are concern for Product Quality. QA ensure that the processes used for developing the product of high quality where as programmers used these processes so that end product is of good quality. Processes are decided by QA. Programmers are supposed to follow the processes so that they can produce a good quality product. Any issue found during execution of process by the programmers is communicated to the QA so that they can improve the process. ************************************************************************************* ************************************************************************************* *****8