QUALITY DEFINITION:
Quality control (QC): The operational
techniques or a system of maintaining
standards by reviewing, checking,
inspecting and testing.
Quality Assurance (QA): The planned and
systematic actions and implementations
necessary to provide adequate confidence that
the work will satisfy quality requirements
• Quality System (QS): A set of documented
processes, which seek to provide satisfaction that
the project outputs will fulfill all the requirements
for which it is being planned. The Quality System
should fully incorporate the organization, human
resources, materials, equipments, processes,
inspections, testing and other parameters of the
project. A key element of QS is the QA/QC
Manual
• Quality Surveillance
• : This normally covers two aspects.
• At the project level, a review is required to
ensure that the quality practices are
implemented and documented to ensure in
relation to the quality system.
• At the contract package level, inspection and
testing is required to ensure that the works
executed meet the required quality standards.
QA/QC MANUAL
This QA/QC Manual focuses on the implementation
activities of the project following contract award,
primarily on supervision and quality control of
construction works It will provide a base outline
towards, procedure, responsibilities, compliance
acceptance criteria and documentation for carrying
out inspection, testing and reporting on various
materials, The QA/QC Manual for the Construction
activity does not attempt to suggest technical
specifications, since these are stated in the contract
documents
• Key Parameters Of Quality Assurance
• Site documents
• Mandatory and optional testing
• Availability of field and departmental laboratories
• Manufacturing test certificates
• Departmental team inspections
• Checklist guide for works
• Site inspections
• Post quality testing of finished works
• Quality certification
• Monthly reporting and review meetings
• HEALTH SAFETY & ENVIRONMENT
• Display of Notices
• Warning tape, lighting arrangement at location of any
excavated trench, electrical installation or mechanical
erection.
• Fire Prevention and Protection
• Environment & Health
• House Keeping
• Lighting
• Monsoon Precaution
• Noise and Vibration
• Personnel protective equipment (PPE) for field staff
• Designs/Drawings for contract
• Maintain design / drawing register at site
• Use only approved drawings for construction
•
• Test laboratory and equipment
• Intimate the details, date of completion with requisite
manufacturers’ and calibration certificates of equipments.
• Maintain the equipments in good condition and calibrate as
necessary
•
• Material receipts Materials testing
• Enter receipts in material register
• Materials to be tested only in approved laboratories
• Prepare concrete mix proportions as per volume as required by
contract and submit test results
• Take test samples in presence of QCwhen requested
• Perform material tests
• Submit test reports to QCwith monthly reports
• Rejected materials
• Entries to be made in material register at site
• Tag and record all rejected materials
• Intimate QCin writing the proposed date of removal of material
from site and confirm after removal
•
• Material consumption
• Enter daily consumption of materials in material register and
indicate balance quantity
•
• Construction equipment
• Intimate ownerthe details, date of mobilization along with
requisite insurance certificate
• Maintain equipments in good working condition
• Intimate breakdown of construction equipments
•
Construction
•
• Intimate owner in writing when construction is going to
commence and what activities are proposed to be
undertaken
• Intimate owner in advance when critical works, such as
concreting, embankment, paving, pipeline laying and
jointing, testing, etc., would be undertaken, along with the
test certificates of the materials proposed to be used in
these works. No critical activity shall start unless the
material is tested. Certificates are verified and approved by
the Engineer.
• Concreting to take place only after pour card is signed.
• To provide any other necessary QA/QC requirement.
•
• Daily work progress
• To maintain in daily log.
•
• Testing of works in progress
• Perform tests as per contract requirements.
• Submit test reports to QC
• Maintain test log during the execution of works.
•
• Rejected work items
• Intimate GPWSC/DWSS in writing the proposed
date of removal from site and confirm after
removal.
• Rectify defective work and invite QC for re-
inspection.
•
• Instructions from Engineer
• Enter change orders, site instructions, letter
and minutes of meetings issued by the Engineer
and Consultants in the Instruction Log.
•
• Inspection of Engineer
• Take instructions in Site Order Book.
• Intimate QCof compliance.
•
• Progress scheduling and control
• Prepare and maintain project schedules and
undertake work in accordance with approved schedule.
•
• Reporting
• Prepare and submit Monthly Progress Reports and
other reports as per contractual requirements.
•
•
• Records Maintain the following records on
Site/Contractor’s Office/Laboratory as given in Annexure C.
• Site Order book
• Material Register
• Daily Progress Report.
• Concrete pour Register
• Test Record
• Design &Drawing Record
• Non conforming item record
• Cube test record
•
• Workmanship All the work executed against the
contract shall be of good workmanship.
• Disposal Of Debris All the Debris should be disposed
of properly after completion of construction work.
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Engineer’s Diary
Sample Register
• The register can consist of a ruled book which has columns
ruled vertically, headed in sequence from the left to right
across both pages as follows:
• Col. 1. Sample number
• 2. Source
• 3. Location
• 4. Description (brief only)
• 5. Depth
• 6. Date taken
• 7. Where tested
• 8. Remarks/references
• Construction Quality Control (CQC) is intended
to provide a comprehensive, common and
consistent framework for quality control
across various contract packages. CQC
comprises two main elements of quality
control:
• Testing
• Inspections
CQC should be affected at five stages:
• Input Materials and Equipment Components
• In-process Activities
• Stage Completion
• Interfacing (of special importance in water and
sewerage contract packages)
• Final completion
• The contractor is responsible for informing EIC
giving sufficient notice time so that they can
witness the tests.
Qaqc in civil construction
Qaqc in civil construction
Periodical Inspection For Quality
Qaqc in civil construction
Random Checks
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Process chart for concrete with stages
of inspection
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction
Qaqc in civil construction

More Related Content

PPT
Quality in Construction
PPTX
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
PPTX
Insepction and quality control
PPTX
Quality Management In Construction
PPTX
total quality management in construction industry
PPTX
Basic concepts of QA and QC
PDF
Quality control IN CONSTRUCTION
PPT
Quality control in construction
Quality in Construction
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
Insepction and quality control
Quality Management In Construction
total quality management in construction industry
Basic concepts of QA and QC
Quality control IN CONSTRUCTION
Quality control in construction

What's hot (20)

PPTX
Quality management for civil engineering
PDF
1. Quality Assurance and Quality Control.pdf
PDF
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
PPTX
Repair and Rehabilitation
PPTX
Quality management
PDF
Construction technology presentation
PPTX
Underwater concrete
PPTX
Total Quality Management In Construction
PPTX
Quality control of concrete
PPTX
Repair and rehabilitation of structures
PPT
3. construction planning. construction project management
PPTX
Repairs and rehabilitation 2012
PDF
Maintenance of concrete structures
PDF
Maintenance and repair strategies
PPTX
Types of Contract in Construction Management
PPT
Sub grade preperation
PPTX
Rebound Hammer Test-priciple,procedure,cons&pros.....
PPTX
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
PPTX
Construction management
PPT
Rates Analysis For Calculating Material and Labour for building works
Quality management for civil engineering
1. Quality Assurance and Quality Control.pdf
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Repair and Rehabilitation
Quality management
Construction technology presentation
Underwater concrete
Total Quality Management In Construction
Quality control of concrete
Repair and rehabilitation of structures
3. construction planning. construction project management
Repairs and rehabilitation 2012
Maintenance of concrete structures
Maintenance and repair strategies
Types of Contract in Construction Management
Sub grade preperation
Rebound Hammer Test-priciple,procedure,cons&pros.....
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
Construction management
Rates Analysis For Calculating Material and Labour for building works
Ad

Similar to Qaqc in civil construction (20)

PPTX
Presentation1
DOC
Waji Ul Hassan_original
DOC
RESUME FOR QC INSPECTOR
PDF
Construction Quality Control Checklist with eAuditor Audits & Inspections
DOC
Saqib Shahzad CV updated
DOC
DOC
ROGELIO DE GUZMAN Piping welding Inspector
DOC
Khurshid WI cswip 3.1
PDF
Umar iqbal qc.cv
DOC
PRAKASH VIJAYAN NEW CV 2015
DOC
arun megarme
DOC
Praneshkumar QC Supervisor
PPTX
Mechanical Projects.pptx
DOC
SHAMSHAD QAQC RESUME
DOC
ANAND CV
DOC
K PRAJIN RESUME - 2015
DOC
ars resume
PPTX
DOC
Muhammed Riswan-QC rev1
Presentation1
Waji Ul Hassan_original
RESUME FOR QC INSPECTOR
Construction Quality Control Checklist with eAuditor Audits & Inspections
Saqib Shahzad CV updated
ROGELIO DE GUZMAN Piping welding Inspector
Khurshid WI cswip 3.1
Umar iqbal qc.cv
PRAKASH VIJAYAN NEW CV 2015
arun megarme
Praneshkumar QC Supervisor
Mechanical Projects.pptx
SHAMSHAD QAQC RESUME
ANAND CV
K PRAJIN RESUME - 2015
ars resume
Muhammed Riswan-QC rev1
Ad

More from kaladharan pillai (7)

PPTX
The uk construction industry
PPTX
PPTX
Finial accont
PPTX
Contract stu1
PPTX
Radiography introduction
PPTX
Magnetic particle test
PPTX
Radiography ndt
The uk construction industry
Finial accont
Contract stu1
Radiography introduction
Magnetic particle test
Radiography ndt

Recently uploaded (20)

PDF
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
PDF
INTERSPEECH 2025 「Recent Advances and Future Directions in Voice Conversion」
PPTX
Module 1 Introduction to Web Programming .pptx
PDF
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
PDF
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
PDF
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
PDF
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
PDF
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PDF
4 layer Arch & Reference Arch of IoT.pdf
PPTX
SGT Report The Beast Plan and Cyberphysical Systems of Control
PDF
Data Virtualization in Action: Scaling APIs and Apps with FME
PPTX
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
PPTX
future_of_ai_comprehensive_20250822032121.pptx
PDF
Enhancing plagiarism detection using data pre-processing and machine learning...
PDF
Improvisation in detection of pomegranate leaf disease using transfer learni...
PPTX
Training Program for knowledge in solar cell and solar industry
PDF
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
PDF
NewMind AI Weekly Chronicles – August ’25 Week IV
PDF
Connector Corner: Transform Unstructured Documents with Agentic Automation
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
INTERSPEECH 2025 「Recent Advances and Future Directions in Voice Conversion」
Module 1 Introduction to Web Programming .pptx
Transform-Your-Factory-with-AI-Driven-Quality-Engineering.pdf
MENA-ECEONOMIC-CONTEXT-VC MENA-ECEONOMIC
5-Ways-AI-is-Revolutionizing-Telecom-Quality-Engineering.pdf
Aug23rd - Mulesoft Community Workshop - Hyd, India.pdf
Transform-Quality-Engineering-with-AI-A-60-Day-Blueprint-for-Digital-Success.pdf
giants, standing on the shoulders of - by Daniel Stenberg
4 layer Arch & Reference Arch of IoT.pdf
SGT Report The Beast Plan and Cyberphysical Systems of Control
Data Virtualization in Action: Scaling APIs and Apps with FME
AI-driven Assurance Across Your End-to-end Network With ThousandEyes
future_of_ai_comprehensive_20250822032121.pptx
Enhancing plagiarism detection using data pre-processing and machine learning...
Improvisation in detection of pomegranate leaf disease using transfer learni...
Training Program for knowledge in solar cell and solar industry
IT-ITes Industry bjjbnkmkhkhknbmhkhmjhjkhj
NewMind AI Weekly Chronicles – August ’25 Week IV
Connector Corner: Transform Unstructured Documents with Agentic Automation

Qaqc in civil construction

  • 1. QUALITY DEFINITION: Quality control (QC): The operational techniques or a system of maintaining standards by reviewing, checking, inspecting and testing. Quality Assurance (QA): The planned and systematic actions and implementations necessary to provide adequate confidence that the work will satisfy quality requirements
  • 2. • Quality System (QS): A set of documented processes, which seek to provide satisfaction that the project outputs will fulfill all the requirements for which it is being planned. The Quality System should fully incorporate the organization, human resources, materials, equipments, processes, inspections, testing and other parameters of the project. A key element of QS is the QA/QC Manual
  • 3. • Quality Surveillance • : This normally covers two aspects. • At the project level, a review is required to ensure that the quality practices are implemented and documented to ensure in relation to the quality system. • At the contract package level, inspection and testing is required to ensure that the works executed meet the required quality standards.
  • 4. QA/QC MANUAL This QA/QC Manual focuses on the implementation activities of the project following contract award, primarily on supervision and quality control of construction works It will provide a base outline towards, procedure, responsibilities, compliance acceptance criteria and documentation for carrying out inspection, testing and reporting on various materials, The QA/QC Manual for the Construction activity does not attempt to suggest technical specifications, since these are stated in the contract documents
  • 5. • Key Parameters Of Quality Assurance • Site documents • Mandatory and optional testing • Availability of field and departmental laboratories • Manufacturing test certificates • Departmental team inspections • Checklist guide for works • Site inspections • Post quality testing of finished works • Quality certification • Monthly reporting and review meetings
  • 6. • HEALTH SAFETY & ENVIRONMENT • Display of Notices • Warning tape, lighting arrangement at location of any excavated trench, electrical installation or mechanical erection. • Fire Prevention and Protection • Environment & Health • House Keeping • Lighting • Monsoon Precaution • Noise and Vibration • Personnel protective equipment (PPE) for field staff
  • 7. • Designs/Drawings for contract • Maintain design / drawing register at site • Use only approved drawings for construction • • Test laboratory and equipment • Intimate the details, date of completion with requisite manufacturers’ and calibration certificates of equipments. • Maintain the equipments in good condition and calibrate as necessary • • Material receipts Materials testing • Enter receipts in material register • Materials to be tested only in approved laboratories • Prepare concrete mix proportions as per volume as required by contract and submit test results • Take test samples in presence of QCwhen requested • Perform material tests • Submit test reports to QCwith monthly reports
  • 8. • Rejected materials • Entries to be made in material register at site • Tag and record all rejected materials • Intimate QCin writing the proposed date of removal of material from site and confirm after removal • • Material consumption • Enter daily consumption of materials in material register and indicate balance quantity • • Construction equipment • Intimate ownerthe details, date of mobilization along with requisite insurance certificate • Maintain equipments in good working condition • Intimate breakdown of construction equipments •
  • 9. Construction • • Intimate owner in writing when construction is going to commence and what activities are proposed to be undertaken • Intimate owner in advance when critical works, such as concreting, embankment, paving, pipeline laying and jointing, testing, etc., would be undertaken, along with the test certificates of the materials proposed to be used in these works. No critical activity shall start unless the material is tested. Certificates are verified and approved by the Engineer. • Concreting to take place only after pour card is signed. • To provide any other necessary QA/QC requirement. •
  • 10. • Daily work progress • To maintain in daily log. • • Testing of works in progress • Perform tests as per contract requirements. • Submit test reports to QC • Maintain test log during the execution of works. •
  • 11. • Rejected work items • Intimate GPWSC/DWSS in writing the proposed date of removal from site and confirm after removal. • Rectify defective work and invite QC for re- inspection. • • Instructions from Engineer • Enter change orders, site instructions, letter and minutes of meetings issued by the Engineer and Consultants in the Instruction Log. •
  • 12. • Inspection of Engineer • Take instructions in Site Order Book. • Intimate QCof compliance. • • Progress scheduling and control • Prepare and maintain project schedules and undertake work in accordance with approved schedule. • • Reporting • Prepare and submit Monthly Progress Reports and other reports as per contractual requirements. • •
  • 13. • Records Maintain the following records on Site/Contractor’s Office/Laboratory as given in Annexure C. • Site Order book • Material Register • Daily Progress Report. • Concrete pour Register • Test Record • Design &Drawing Record • Non conforming item record • Cube test record • • Workmanship All the work executed against the contract shall be of good workmanship. • Disposal Of Debris All the Debris should be disposed of properly after completion of construction work.
  • 20. Sample Register • The register can consist of a ruled book which has columns ruled vertically, headed in sequence from the left to right across both pages as follows: • Col. 1. Sample number • 2. Source • 3. Location • 4. Description (brief only) • 5. Depth • 6. Date taken • 7. Where tested • 8. Remarks/references
  • 21. • Construction Quality Control (CQC) is intended to provide a comprehensive, common and consistent framework for quality control across various contract packages. CQC comprises two main elements of quality control: • Testing • Inspections
  • 22. CQC should be affected at five stages: • Input Materials and Equipment Components • In-process Activities • Stage Completion • Interfacing (of special importance in water and sewerage contract packages) • Final completion • The contractor is responsible for informing EIC giving sufficient notice time so that they can witness the tests.
  • 43. Process chart for concrete with stages of inspection