By
1.ASIF ALI(27301314023)
2.ASHRAFUL ABEDIN(27301314022)
3.JITENDRA HALDER(27301313019)
M.a construction pvt ltd
 Land Acquisition
 Land Clearance
 Excavation & Compaction
 Leveling
 Demarcation Plan
 Layout , Shuttering And Footing
 Onward Construction Of Substructure & Super
Structure
 Project: Natural city
bardhaman
 Contract : Natural group
 Contractor: M.a
construction
(India)pvt.Ltd.
 16 Towers
 Tower –G+7(all
tower)
 Having 2/3/4 BHK
 600+ apartments
 450 cottahs
Spacers Fly ash bricks Chair
Tie rod sikanja
Prop-jack
 Batching Plant
 Mechanical Pump ETC.
• L –angles
• 5-7.5cms height
• High grade mortar
In case of column starter casting they
maintained the mixing ratio about 1:1.5:3.
After kicker casting of
column-2
Reinforcement
Placements of Column
Reinforcement
Placements of Column
Reinforcement Placements of Column
according to design
For beam-2 constriction:
3-16mmΦ bar in top
3-20mmΦ bar in bottom
2-20mmΦ extra bars in bottom
3-16mmΦ extra bars in top
For stirrup 10mmΦ bar
12
Floor beam-2
section
13
concrete mixing
in mixture
machine
using crane for
pulling up the
concrete
Beam casting
During slab
casting, using
vibrator & Steel
runner.
14
shuttering of Stair
15
Using vibrator during
stair casting
Curing of stair by moist
jute fabric
Brick work Masonry
Finishing
 Need to wear helmet all the time
 Proper fencing is done
 First aid kit is available along with safety
engineer as well as doctor
 At height safety belts are also required
 Gained basic knowledge in the field of
construction.
 Learned an importance of proper
communication between office and
work site.
 Learned wise use of available
resources.
 The training has revamped my
confidence.
 Learn about safety requirments at site.
 I m happy that I choose civil
engineering.

Residential project at natural city..