Chapter 3
 Agile Development
Introduction to Software Engineering
2
The Manifesto for
Agile Software Development
“We are uncovering better ways of developing
software by doing it and helping others do it.
Through this work we have come to value:
•Individuals and interactions over processes
and tools
•Working software over comprehensive
documentation
•Customer collaboration over contract
negotiation
•Responding to change over following a plan
That is, while there is value in the items on the
right, we value the items on the left more.”
3
What is “Agility”?
 Effective (rapid and adaptive) response to change (team members, new
technology, requirements)
 Effective communication in structure and attitudes among all team
members, technological and business people, software engineers and
managers。
 Drawing the customer into the team. Eliminate “us and them” attitude.
Planning in an uncertain world has its limits and plan must be flexible.
 Organizing a team so that it is in control of the work performed
 Eliminate all but the most essential work products and keep them lean.
 Emphasize an incremental delivery strategy as opposed to intermediate
products that gets working software to the customer as rapidly as feasible.
4
What is “Agility”?
Yielding …
 Rapid, incremental delivery of software
 The development guidelines stress delivery over analysis and
design although these activates are not discouraged, and
active and continuous communication between developers and
customers.
5
Why and What Steps are“Agility” important?
 Why? The modern business environment is fast-paced and ever-changing. It
represents a reasonable alternative to conventional software engineering for
certain classes of software projects. It has been demonstrated to deliver
successful systems quickly.
 What? May be termed as “software engineering lite” The basic activities-
communication, planning, modeling, construction and deployment remain.
But they morph into a minimal task set that push the team toward
construction and delivery sooner.
 The only really important work product is an operational “ software
increment” that is delivered.
6
Agility and the Cost of Change
 Conventional wisdom is that the cost of change increases nonlinearly as a
project progresses. It is relatively easy to accommodate a change when a team
is gathering requirements early in a project. If there are any changes, the costs
of doing this work are minimal. But if the middle of validation testing, a
stakeholder is requesting a major functional change. Then the change requires
a modification to the architectural design, construction of new components,
changes to other existing components, new testing and so on. Costs escalate
quickly.
 A well-designed agile process may “flatten” the cost of change curve by
coupling incremental delivery with agile practices such as continuous unit
testing and pair programming. Thus team can accommodate changes late in
the software project without dramatic cost and time impact.
7
Agility and the Cost of Change
8
An Agile Process
 Is driven by customer descriptions of what is required (scenarios). Some
assumptions:
 Recognizes that plans are short-lived (some requirements will persist, some will change.
Customer priorities will change)
 Develops software iteratively with a heavy emphasis on construction activities
(design and construction are interleaved, hard to say how much design is necessary before
construction. Design models are proven as they are created. )
 Analysis, design, construction and testing are not predictable.
 Thus has to Adapt as changes occur due to unpredictability
 Delivers multiple ‘software increments’, deliver an operational prototype
or portion of an OS to collect customer feedback for adaption.
9
Agility Principles - I
1. Our highest priority is to satisfy the customer through early and continuous
delivery of valuable software.
2. Welcome changing requirements, even late in development. Agile
processes harness change for the customer's competitive advantage.
3. Deliver working software frequently, from a couple of weeks to a couple of
months, with a preference to the shorter timescale.
4. Business people and developers must work together daily throughout the
project.
5. Build projects around motivated individuals. Give them the environment and
support they need, and trust them to get the job done.
6. The most efficient and effective method of conveying information to and
within a development team is face–to–face conversation.
10
Agility Principles - II
7. Working software is the primary measure of progress.
8. Agile processes promote sustainable development. The sponsors,
developers, and users should be able to maintain a constant pace
indefinitely.
9. Continuous attention to technical excellence and good design
enhances agility.
10. Simplicity – the art of maximizing the amount of work not done – is
essential.
11. The best architectures, requirements, and designs emerge from
self–organizing teams.
12. At regular intervals, the team reflects on how to become more
effective, then tunes and adjusts its behavior accordingly.
11
Human Factors
 the process molds to the needs of the people and team, not the other way
around
 key traits must exist among the people on an agile team and the team itself:
 Competence. ( talent, skills, knowledge)
 Common focus. ( deliver a working software increment )
 Collaboration. ( peers and stakeholders)
 Decision-making ability. ( freedom to control its own destiny)
 Fuzzy problem-solving ability.(ambiguity and constant changes, today
problem may not be tomorrow’s problem)
 Mutual trust and respect.
 Self-organization. ( themselves for the work done, process for its local
environment, the work schedule)
12
Extreme Programming (XP)
 The most widely used agile process, originally proposed by Kent Beck in 2004. It
uses an object-oriented approach.
 XP Planning
 Begins with the listening, leads to creation of “user stories” that describes required output,
features, and functionality. Customer assigns a value(i.e., a priority) to each story.
 Agile team assesses each story and assigns a cost (development weeks. If more than 3 weeks,
customer asked to split into smaller stories)
 Working together, stories are grouped for a deliverable increment next release.
 A commitment (stories to be included, delivery date and other project matters) is made.
Three ways: 1. Either all stories will be implemented in a few weeks, 2. high priority stories first, or 3.
the riskiest stories will be implemented first.
 After the first increment “project velocity”, namely number of stories implemented during
the first release is used to help define subsequent delivery dates for other increments.
Customers can add stories, delete existing stories, change values of an existing story, split
stories as development work proceeds.
13
Extreme Programming (XP)
 XP Design ( occurs both before and after coding as refactoring is encouraged)
 Follows the KIS principle (keep it simple) Nothing more nothing less than the story.
 Encourage the use of CRC (class-responsibility-collaborator) cards in an object-oriented
context. The only design work product of XP. They identify and organize the classes
that are relevant to the current software increment. (see Chapter 8)
 For difficult design problems, suggests the creation of “spike solutions”—a design
prototype for that portion is implemented and evaluated.
 Encourages “refactoring”—an iterative refinement of the internal program design. Does
not alter the external behavior yet improve the internal structure. Minimize chances of
bugs. More efficient, easy to read.
 XP Coding
 Recommends the construction of a unit test for a story before coding commences. So
implementer can focus on what must be implemented to pass the test.
 Encourages “pair programming”. Two people work together at one workstation. Real
time problem solving, real time review for quality assurance. Take slightly different roles.
 XP Testing
 All unit tests are executed daily and ideally should be automated. Regression tests are
conducted to test current and previous components.
 “Acceptance tests” are defined by the customer and executed to assess customer
visible functionality
14
Extreme Programming (XP)
unit t est
cont inuous int egrat ion
accept ance t est ing
pair
programming
Release
user st ories
values
accept ance t est crit eria
it erat ion plan
simple design
CRC cards
spike solut ions
prot ot ypes
refact oring
software increment
project velocity computed
The XP Debate
 Requirements volatility: customer is an active member of XP team, changes to
requirements are requested informally and frequently.
 Conflicting customer needs: different customers' needs need to be assimilated.
Different vision or beyond their authority.
 Requirements are expressed informally: Use stories and acceptance tests are
the only explicit manifestation of requirements. Formal models may avoid
inconsistencies and errors before the system is built. Proponents said
changing nature makes such models obsolete as soon as they are developed.
 Lack of formal design: XP deemphasizes the need for architectural design.
Complex systems need overall structure to exhibit quality and maintainability.
Proponents said incremental nature limits complexity as simplicity is a core
value.
15
16
Adaptive Software Development (ASD)
 Originally proposed by Jim Highsmith (2000)focusing on human
collaboration and team self-organization as a technique to build
complex software and system.
 ASD — distinguishing features
 Mission-driven planning
 Component-based focus
 Uses “time-boxing” (See Chapter 24)
 Explicit consideration of risks
 Emphasizes collaboration for requirements gathering
 Emphasizes “learning” throughout the process
Three Phases of ASD
 1. Speculation: project is initiated and adaptive cycle planning is
conducted. Adaptive cycle planning uses project initiation
information- the customer’s mission statement, project constraints
(e.g. delivery date), and basic requirements to define the set of
release cycles (increments) that will be required for the project.
Based on the information obtained at the completion of the first
cycle, the plan is reviewed and adjusted so that planned work
better fits the reality.
17
18
Three Phases of ASD
 2. Collaborations are used to multiply their talent and creative output beyond
absolute number (1+1>2). It encompasses communication and teamwork, but it
also emphasizes individualism, because individual creativity plays an important
role in collaborative thinking.
 It is a matter of trust. 1) criticize without animosity, 2) assist without resentments,
3) work as hard as or harder than they do. 4) have the skill set to contribute to
the work at hand, 5) communicate problems or concerns in a way that leas to
effective action.
 3. Learning: As members of ASD team begin to develop the components, the
emphasis is on “learning”. Highsmith argues that software developers often
overestimate their own understanding of the technology, the process, and the
project and that learning will help them to improve their level of real
understanding. Three ways: focus groups, technical reviews and project
postmortems.
19
Adaptive Software Development
adapt ive cycle planning
uses mission st at ement
project const raint s
basic requirement s
t ime-boxed release plan
Requirement s gat hering
JAD
mini-specs
component s implement ed/ t est ed
focus groups for feedback
formal t echnical reviews
post mort ems
software increment
adjustments for subsequent cycles
Release
20
Dynamic Systems Development Method
 It is an agile software development approach that provides a
framework for building and maintaining systems which meet tight time
constraints through the use of incremental prototyping in a controlled
project environment.
 Promoted by the DSDM Consortium
 DSDM—distinguishing features
 Similar in most respects to XP and/or ASD
 Nine guiding principles
• Active user involvement is imperative.
• DSDM teams must be empowered to make decisions.
• The focus is on frequent delivery of products.
• Fitness for business purpose is the essential criterion for acceptance of deliverables.
• Iterative and incremental development is necessary to converge on an accurate business solution.
• All changes during development are reversible.
• Requirements are baselined at a high level
• Testing is integrated throughout the life-cycle.
21
Dynamic Systems Development Method
DSDM Life Cycle (with permission of the DSDM consortium)
22
Scrum
 A software development method Originally proposed by Schwaber
and Beedle (an activity occurs during a rugby match) in early 1990.
 Scrum—distinguishing features
 Development work is partitioned into “packets”
 Testing and documentation are on-going as the product is constructed
 Work units occurs in “sprints” and is derived from a “backlog” of existing
changing prioritized requirements
 Changes are not introduced in sprints (short term but stable) but in
backlog.
 Meetings are very short (15 minutes daily) and sometimes conducted
without chairs ( what did you do since last meeting? What obstacles are
you encountering? What do you plan to accomplish by next meeting?)
 “demos” are delivered to the customer with the time-box allocated. May
not contain all functionalities. So customers can evaluate and give
feedbacks.
23
Scrum
Scrum Process Flow (used with permission)
24
Crystal
 Proposed by Cockburn and Highsmith
 Crystal—distinguishing features
 Actually a family of process models that allow
“maneuverability” based on problem characteristics
 Face-to-face communication is emphasized
 Suggests the use of “reflection workshops” to
review the work habits of the team
25
Feature Driven Development
 Originally proposed by Peter Coad et al as a object-oriented
software engineering process model.
 FDD—distinguishing features
 Emphasis is on defining “features” which can be organized
hierarchically.
• a feature “is a client-valued function that can be implemented in two weeks
or less.”
 Uses a feature template
• <action> the <result> <by | for | of | to> a(n) <object>
• E.g. Add the product to shopping cart.
• Display the technical-specifications of the product.
• Store the shipping-information for the customer.
 A features list is created and “plan by feature” is conducted
 Design and construction merge in FDD
26
Feature Driven Development
Reprinted with permission of Peter Coad
27
Agile Modeling
 Originally proposed by Scott Ambler
 Suggests a set of agile modeling principles
 Model with a purpose
 Use multiple models
 Travel light
 Content is more important than representation
 Know the models and the tools you use to create them
 Adapt locally

More Related Content

Similar to SE Lecture 3.ppt (20)

PDF
ch2-Agile-Software-Development-engineerning.pdf
yedej15330
 
PPTX
Agile development
JoshuaU1
 
PPTX
Chapter 5
TehreemSaleem5
 
PDF
XP vs Lean vs FDD
Suman Guha
 
PPTX
Software engineering MODULE3__Agile.pptx
ssuser2801af1
 
PDF
4. ch 3-agile process
Delowar hossain
 
PDF
Role of Agile model in software development
RaviRai305867
 
PPTX
Agile Software Development
مصعب محمد زكريا
 
PPT
Agile Software Development in Bachelor of Computer Applications.ppt
JASVEERSINGHVU21CSCI
 
PDF
Chapter 3.pdf Agile Development + framework
MaheenVohra
 
PPT
Software Engineering (An Agile View of Process)
ShudipPal
 
PPTX
ISTQB Agile Extension
Davis Thomas
 
PPTX
Agile Process models
Student
 
PPT
Chapter 3 - Agile Software Development.ppt
RaviRaval36
 
PPT
Agiel sw development
Noor Ul Hudda Memon
 
PPT
Project Requriement Management Vs Agile software development
bizpresenter
 
PDF
Lect7
Sulman Ahmed
 
PDF
Lect7
Sulman Ahmed
 
PPT
Agile intro resources
Anwar Sadat
 
PDF
International Journal of Computational Engineering Research(IJCER)
ijceronline
 
ch2-Agile-Software-Development-engineerning.pdf
yedej15330
 
Agile development
JoshuaU1
 
Chapter 5
TehreemSaleem5
 
XP vs Lean vs FDD
Suman Guha
 
Software engineering MODULE3__Agile.pptx
ssuser2801af1
 
4. ch 3-agile process
Delowar hossain
 
Role of Agile model in software development
RaviRai305867
 
Agile Software Development
مصعب محمد زكريا
 
Agile Software Development in Bachelor of Computer Applications.ppt
JASVEERSINGHVU21CSCI
 
Chapter 3.pdf Agile Development + framework
MaheenVohra
 
Software Engineering (An Agile View of Process)
ShudipPal
 
ISTQB Agile Extension
Davis Thomas
 
Agile Process models
Student
 
Chapter 3 - Agile Software Development.ppt
RaviRaval36
 
Agiel sw development
Noor Ul Hudda Memon
 
Project Requriement Management Vs Agile software development
bizpresenter
 
Agile intro resources
Anwar Sadat
 
International Journal of Computational Engineering Research(IJCER)
ijceronline
 

More from ssusere16bd9 (20)

PPT
OSLec 4& 5(Processesinoperatingsystem).ppt
ssusere16bd9
 
PPTX
OSLec14&15(Deadlocksinopratingsystem).pptx
ssusere16bd9
 
PPTX
Agents and environment.pptx
ssusere16bd9
 
PPTX
Cache Memory.pptx
ssusere16bd9
 
PPT
Data Communication-1.ppt
ssusere16bd9
 
PPTX
COMPUTER ARCHITECTURE-2.pptx
ssusere16bd9
 
PPTX
jyatesproject4-111025223823-phpapp02.pptx
ssusere16bd9
 
PPTX
What is SRS & REP.pptx
ssusere16bd9
 
PPTX
semantic web.pptx
ssusere16bd9
 
PPTX
business communication.pptx
ssusere16bd9
 
PPTX
xml and xhtml.pptx
ssusere16bd9
 
PPTX
cloudcomputing5-141224231751-conversion-gate02-1.pptx
ssusere16bd9
 
PPTX
presentation.pptx
ssusere16bd9
 
PPTX
SE PRESENTATION (1).pptx
ssusere16bd9
 
PPTX
CBSE.pptx
ssusere16bd9
 
PPTX
What is SRS & REP.pptx
ssusere16bd9
 
PPTX
How social Norms is Understood as Deviant Behavior-rauf.pptx
ssusere16bd9
 
PPT
SE Lecture 1.ppt
ssusere16bd9
 
PPT
SE Lecture 2.ppt
ssusere16bd9
 
PPT
SE Lecture 1.ppt
ssusere16bd9
 
OSLec 4& 5(Processesinoperatingsystem).ppt
ssusere16bd9
 
OSLec14&15(Deadlocksinopratingsystem).pptx
ssusere16bd9
 
Agents and environment.pptx
ssusere16bd9
 
Cache Memory.pptx
ssusere16bd9
 
Data Communication-1.ppt
ssusere16bd9
 
COMPUTER ARCHITECTURE-2.pptx
ssusere16bd9
 
jyatesproject4-111025223823-phpapp02.pptx
ssusere16bd9
 
What is SRS & REP.pptx
ssusere16bd9
 
semantic web.pptx
ssusere16bd9
 
business communication.pptx
ssusere16bd9
 
xml and xhtml.pptx
ssusere16bd9
 
cloudcomputing5-141224231751-conversion-gate02-1.pptx
ssusere16bd9
 
presentation.pptx
ssusere16bd9
 
SE PRESENTATION (1).pptx
ssusere16bd9
 
CBSE.pptx
ssusere16bd9
 
What is SRS & REP.pptx
ssusere16bd9
 
How social Norms is Understood as Deviant Behavior-rauf.pptx
ssusere16bd9
 
SE Lecture 1.ppt
ssusere16bd9
 
SE Lecture 2.ppt
ssusere16bd9
 
SE Lecture 1.ppt
ssusere16bd9
 
Ad

Recently uploaded (20)

PPTX
Inventory management chapter in automation and robotics.
atisht0104
 
PDF
勉強会資料_An Image is Worth More Than 16x16 Patches
NABLAS株式会社
 
PPTX
MT Chapter 1.pptx- Magnetic particle testing
ABCAnyBodyCanRelax
 
PDF
Advanced LangChain & RAG: Building a Financial AI Assistant with Real-Time Data
Soufiane Sejjari
 
PDF
2025 Laurence Sigler - Advancing Decision Support. Content Management Ecommer...
Francisco Javier Mora Serrano
 
PDF
Construction of a Thermal Vacuum Chamber for Environment Test of Triple CubeS...
2208441
 
PPTX
Water resources Engineering GIS KRT.pptx
Krunal Thanki
 
PDF
Air -Powered Car PPT by ER. SHRESTH SUDHIR KOKNE.pdf
SHRESTHKOKNE
 
PPTX
cybersecurityandthe importance of the that
JayachanduHNJc
 
PDF
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
PPTX
IoT_Smart_Agriculture_Presentations.pptx
poojakumari696707
 
PPTX
Introduction to Fluid and Thermal Engineering
Avesahemad Husainy
 
PPTX
MULTI LEVEL DATA TRACKING USING COOJA.pptx
dollysharma12ab
 
PDF
Biodegradable Plastics: Innovations and Market Potential (www.kiu.ac.ug)
publication11
 
PPTX
ENSA_Module_7.pptx_wide_area_network_concepts
RanaMukherjee24
 
PDF
Introduction to Ship Engine Room Systems.pdf
Mahmoud Moghtaderi
 
PPTX
FUNDAMENTALS OF ELECTRIC VEHICLES UNIT-1
MikkiliSuresh
 
PPTX
Ground improvement techniques-DEWATERING
DivakarSai4
 
PPTX
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
PPTX
MSME 4.0 Template idea hackathon pdf to understand
alaudeenaarish
 
Inventory management chapter in automation and robotics.
atisht0104
 
勉強会資料_An Image is Worth More Than 16x16 Patches
NABLAS株式会社
 
MT Chapter 1.pptx- Magnetic particle testing
ABCAnyBodyCanRelax
 
Advanced LangChain & RAG: Building a Financial AI Assistant with Real-Time Data
Soufiane Sejjari
 
2025 Laurence Sigler - Advancing Decision Support. Content Management Ecommer...
Francisco Javier Mora Serrano
 
Construction of a Thermal Vacuum Chamber for Environment Test of Triple CubeS...
2208441
 
Water resources Engineering GIS KRT.pptx
Krunal Thanki
 
Air -Powered Car PPT by ER. SHRESTH SUDHIR KOKNE.pdf
SHRESTHKOKNE
 
cybersecurityandthe importance of the that
JayachanduHNJc
 
2010_Book_EnvironmentalBioengineering (1).pdf
EmilianoRodriguezTll
 
IoT_Smart_Agriculture_Presentations.pptx
poojakumari696707
 
Introduction to Fluid and Thermal Engineering
Avesahemad Husainy
 
MULTI LEVEL DATA TRACKING USING COOJA.pptx
dollysharma12ab
 
Biodegradable Plastics: Innovations and Market Potential (www.kiu.ac.ug)
publication11
 
ENSA_Module_7.pptx_wide_area_network_concepts
RanaMukherjee24
 
Introduction to Ship Engine Room Systems.pdf
Mahmoud Moghtaderi
 
FUNDAMENTALS OF ELECTRIC VEHICLES UNIT-1
MikkiliSuresh
 
Ground improvement techniques-DEWATERING
DivakarSai4
 
22PCOAM21 Session 1 Data Management.pptx
Guru Nanak Technical Institutions
 
MSME 4.0 Template idea hackathon pdf to understand
alaudeenaarish
 
Ad

SE Lecture 3.ppt

  • 1. 1 Chapter 3  Agile Development Introduction to Software Engineering
  • 2. 2 The Manifesto for Agile Software Development “We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: •Individuals and interactions over processes and tools •Working software over comprehensive documentation •Customer collaboration over contract negotiation •Responding to change over following a plan That is, while there is value in the items on the right, we value the items on the left more.”
  • 3. 3 What is “Agility”?  Effective (rapid and adaptive) response to change (team members, new technology, requirements)  Effective communication in structure and attitudes among all team members, technological and business people, software engineers and managers。  Drawing the customer into the team. Eliminate “us and them” attitude. Planning in an uncertain world has its limits and plan must be flexible.  Organizing a team so that it is in control of the work performed  Eliminate all but the most essential work products and keep them lean.  Emphasize an incremental delivery strategy as opposed to intermediate products that gets working software to the customer as rapidly as feasible.
  • 4. 4 What is “Agility”? Yielding …  Rapid, incremental delivery of software  The development guidelines stress delivery over analysis and design although these activates are not discouraged, and active and continuous communication between developers and customers.
  • 5. 5 Why and What Steps are“Agility” important?  Why? The modern business environment is fast-paced and ever-changing. It represents a reasonable alternative to conventional software engineering for certain classes of software projects. It has been demonstrated to deliver successful systems quickly.  What? May be termed as “software engineering lite” The basic activities- communication, planning, modeling, construction and deployment remain. But they morph into a minimal task set that push the team toward construction and delivery sooner.  The only really important work product is an operational “ software increment” that is delivered.
  • 6. 6 Agility and the Cost of Change  Conventional wisdom is that the cost of change increases nonlinearly as a project progresses. It is relatively easy to accommodate a change when a team is gathering requirements early in a project. If there are any changes, the costs of doing this work are minimal. But if the middle of validation testing, a stakeholder is requesting a major functional change. Then the change requires a modification to the architectural design, construction of new components, changes to other existing components, new testing and so on. Costs escalate quickly.  A well-designed agile process may “flatten” the cost of change curve by coupling incremental delivery with agile practices such as continuous unit testing and pair programming. Thus team can accommodate changes late in the software project without dramatic cost and time impact.
  • 7. 7 Agility and the Cost of Change
  • 8. 8 An Agile Process  Is driven by customer descriptions of what is required (scenarios). Some assumptions:  Recognizes that plans are short-lived (some requirements will persist, some will change. Customer priorities will change)  Develops software iteratively with a heavy emphasis on construction activities (design and construction are interleaved, hard to say how much design is necessary before construction. Design models are proven as they are created. )  Analysis, design, construction and testing are not predictable.  Thus has to Adapt as changes occur due to unpredictability  Delivers multiple ‘software increments’, deliver an operational prototype or portion of an OS to collect customer feedback for adaption.
  • 9. 9 Agility Principles - I 1. Our highest priority is to satisfy the customer through early and continuous delivery of valuable software. 2. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage. 3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale. 4. Business people and developers must work together daily throughout the project. 5. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. 6. The most efficient and effective method of conveying information to and within a development team is face–to–face conversation.
  • 10. 10 Agility Principles - II 7. Working software is the primary measure of progress. 8. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. 9. Continuous attention to technical excellence and good design enhances agility. 10. Simplicity – the art of maximizing the amount of work not done – is essential. 11. The best architectures, requirements, and designs emerge from self–organizing teams. 12. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.
  • 11. 11 Human Factors  the process molds to the needs of the people and team, not the other way around  key traits must exist among the people on an agile team and the team itself:  Competence. ( talent, skills, knowledge)  Common focus. ( deliver a working software increment )  Collaboration. ( peers and stakeholders)  Decision-making ability. ( freedom to control its own destiny)  Fuzzy problem-solving ability.(ambiguity and constant changes, today problem may not be tomorrow’s problem)  Mutual trust and respect.  Self-organization. ( themselves for the work done, process for its local environment, the work schedule)
  • 12. 12 Extreme Programming (XP)  The most widely used agile process, originally proposed by Kent Beck in 2004. It uses an object-oriented approach.  XP Planning  Begins with the listening, leads to creation of “user stories” that describes required output, features, and functionality. Customer assigns a value(i.e., a priority) to each story.  Agile team assesses each story and assigns a cost (development weeks. If more than 3 weeks, customer asked to split into smaller stories)  Working together, stories are grouped for a deliverable increment next release.  A commitment (stories to be included, delivery date and other project matters) is made. Three ways: 1. Either all stories will be implemented in a few weeks, 2. high priority stories first, or 3. the riskiest stories will be implemented first.  After the first increment “project velocity”, namely number of stories implemented during the first release is used to help define subsequent delivery dates for other increments. Customers can add stories, delete existing stories, change values of an existing story, split stories as development work proceeds.
  • 13. 13 Extreme Programming (XP)  XP Design ( occurs both before and after coding as refactoring is encouraged)  Follows the KIS principle (keep it simple) Nothing more nothing less than the story.  Encourage the use of CRC (class-responsibility-collaborator) cards in an object-oriented context. The only design work product of XP. They identify and organize the classes that are relevant to the current software increment. (see Chapter 8)  For difficult design problems, suggests the creation of “spike solutions”—a design prototype for that portion is implemented and evaluated.  Encourages “refactoring”—an iterative refinement of the internal program design. Does not alter the external behavior yet improve the internal structure. Minimize chances of bugs. More efficient, easy to read.  XP Coding  Recommends the construction of a unit test for a story before coding commences. So implementer can focus on what must be implemented to pass the test.  Encourages “pair programming”. Two people work together at one workstation. Real time problem solving, real time review for quality assurance. Take slightly different roles.  XP Testing  All unit tests are executed daily and ideally should be automated. Regression tests are conducted to test current and previous components.  “Acceptance tests” are defined by the customer and executed to assess customer visible functionality
  • 14. 14 Extreme Programming (XP) unit t est cont inuous int egrat ion accept ance t est ing pair programming Release user st ories values accept ance t est crit eria it erat ion plan simple design CRC cards spike solut ions prot ot ypes refact oring software increment project velocity computed
  • 15. The XP Debate  Requirements volatility: customer is an active member of XP team, changes to requirements are requested informally and frequently.  Conflicting customer needs: different customers' needs need to be assimilated. Different vision or beyond their authority.  Requirements are expressed informally: Use stories and acceptance tests are the only explicit manifestation of requirements. Formal models may avoid inconsistencies and errors before the system is built. Proponents said changing nature makes such models obsolete as soon as they are developed.  Lack of formal design: XP deemphasizes the need for architectural design. Complex systems need overall structure to exhibit quality and maintainability. Proponents said incremental nature limits complexity as simplicity is a core value. 15
  • 16. 16 Adaptive Software Development (ASD)  Originally proposed by Jim Highsmith (2000)focusing on human collaboration and team self-organization as a technique to build complex software and system.  ASD — distinguishing features  Mission-driven planning  Component-based focus  Uses “time-boxing” (See Chapter 24)  Explicit consideration of risks  Emphasizes collaboration for requirements gathering  Emphasizes “learning” throughout the process
  • 17. Three Phases of ASD  1. Speculation: project is initiated and adaptive cycle planning is conducted. Adaptive cycle planning uses project initiation information- the customer’s mission statement, project constraints (e.g. delivery date), and basic requirements to define the set of release cycles (increments) that will be required for the project. Based on the information obtained at the completion of the first cycle, the plan is reviewed and adjusted so that planned work better fits the reality. 17
  • 18. 18 Three Phases of ASD  2. Collaborations are used to multiply their talent and creative output beyond absolute number (1+1>2). It encompasses communication and teamwork, but it also emphasizes individualism, because individual creativity plays an important role in collaborative thinking.  It is a matter of trust. 1) criticize without animosity, 2) assist without resentments, 3) work as hard as or harder than they do. 4) have the skill set to contribute to the work at hand, 5) communicate problems or concerns in a way that leas to effective action.  3. Learning: As members of ASD team begin to develop the components, the emphasis is on “learning”. Highsmith argues that software developers often overestimate their own understanding of the technology, the process, and the project and that learning will help them to improve their level of real understanding. Three ways: focus groups, technical reviews and project postmortems.
  • 19. 19 Adaptive Software Development adapt ive cycle planning uses mission st at ement project const raint s basic requirement s t ime-boxed release plan Requirement s gat hering JAD mini-specs component s implement ed/ t est ed focus groups for feedback formal t echnical reviews post mort ems software increment adjustments for subsequent cycles Release
  • 20. 20 Dynamic Systems Development Method  It is an agile software development approach that provides a framework for building and maintaining systems which meet tight time constraints through the use of incremental prototyping in a controlled project environment.  Promoted by the DSDM Consortium  DSDM—distinguishing features  Similar in most respects to XP and/or ASD  Nine guiding principles • Active user involvement is imperative. • DSDM teams must be empowered to make decisions. • The focus is on frequent delivery of products. • Fitness for business purpose is the essential criterion for acceptance of deliverables. • Iterative and incremental development is necessary to converge on an accurate business solution. • All changes during development are reversible. • Requirements are baselined at a high level • Testing is integrated throughout the life-cycle.
  • 21. 21 Dynamic Systems Development Method DSDM Life Cycle (with permission of the DSDM consortium)
  • 22. 22 Scrum  A software development method Originally proposed by Schwaber and Beedle (an activity occurs during a rugby match) in early 1990.  Scrum—distinguishing features  Development work is partitioned into “packets”  Testing and documentation are on-going as the product is constructed  Work units occurs in “sprints” and is derived from a “backlog” of existing changing prioritized requirements  Changes are not introduced in sprints (short term but stable) but in backlog.  Meetings are very short (15 minutes daily) and sometimes conducted without chairs ( what did you do since last meeting? What obstacles are you encountering? What do you plan to accomplish by next meeting?)  “demos” are delivered to the customer with the time-box allocated. May not contain all functionalities. So customers can evaluate and give feedbacks.
  • 23. 23 Scrum Scrum Process Flow (used with permission)
  • 24. 24 Crystal  Proposed by Cockburn and Highsmith  Crystal—distinguishing features  Actually a family of process models that allow “maneuverability” based on problem characteristics  Face-to-face communication is emphasized  Suggests the use of “reflection workshops” to review the work habits of the team
  • 25. 25 Feature Driven Development  Originally proposed by Peter Coad et al as a object-oriented software engineering process model.  FDD—distinguishing features  Emphasis is on defining “features” which can be organized hierarchically. • a feature “is a client-valued function that can be implemented in two weeks or less.”  Uses a feature template • <action> the <result> <by | for | of | to> a(n) <object> • E.g. Add the product to shopping cart. • Display the technical-specifications of the product. • Store the shipping-information for the customer.  A features list is created and “plan by feature” is conducted  Design and construction merge in FDD
  • 26. 26 Feature Driven Development Reprinted with permission of Peter Coad
  • 27. 27 Agile Modeling  Originally proposed by Scott Ambler  Suggests a set of agile modeling principles  Model with a purpose  Use multiple models  Travel light  Content is more important than representation  Know the models and the tools you use to create them  Adapt locally