Software Project Team (YOU): JBB Software
Customer: Astin Martin Electronics LLC
RFP awarded for specific
message
services which will be incorporated into a
n
electronic instrument
company (Astin Martin
Electronics
LLC)
interface to electronic
gauges
. Topical level requirements for the software were provided.
Deliverable products
include:
-
Systems Engineering to provid
e appropriate requirements decomposition
-
Software Engineering to provide design/development/unit test
of software
-
System Test Engineering to provide component and enterprise
level testing
-
Quality Engineering to provide quality control through the
entire de
velopment life
cycle
-
Management functions to include all primary functions (project
management,
finance, planning & scheduling, Overhead support (contracts,
engineering matrix,
etc.)
Award date of May 15 and required completion date
(deliverables provided)
of
November 15.
Astin Martin
Electronics
request of planned deliverables, acceptance criteria, quality
plan, and work breakdown structure. These items need to be
provided in an acceptable
time for Astin Martin to review and approve.
Astin Martin
Electroni
cs
further requests other deliverables to include final software
(source and binary) which meets all approved acceptance
criteria, associated design
documents (system and development level)
All project questions or request for project scope changes
should
be directed to the
Astin Martin
Electronics
designee (course instructor).
There is no requirement relative to project tools used to
generate the required data.
Topical requirements
include:
-
System Engineering: UML design
artifacts
for
graphic widgets to di
splay
aeronautical expanse gauges
for interface testing
within the technical specs
guidelines for twenty
-
five different visual aspects. Include appropriate level of
peer review. Design should include graphical mock
-
up of gauges.
4
-
System Engineering: Derive
component level requirements for Software
Engineering to design, code, and unit test and System Test can
provide System
and Enterprise level testing
-
Software Engineering: Provide appropriate level design artifacts
from System
Engineering UML design artifac
ts. Include appropriate level of peer review.
-
Software Engineering: Code and Unit Test software modules
that execute the
software which meets all topical and derived requirements
-
System Test Engineering: Derive sell
-
off acceptance criteria. Include appropr
iate
peer review (including System Engineering) and customer
approval.
-
System Test Engineering: Derive System and Enterprise Level
Test Cases.
Include appropriate level of peer review.
-
System Test Engineering: Execute test cases as software
modules
become
available
-
Quality Engineering: Provide quality checks during the
processes described for
System Engineering, Software Engineering, and System Test
Engineering as
appropriate
-
Include the following customer related reviews: Design Review
(after System
Engineering completes design artifacts), Pre
-
Ship Review (provided prior to Astin
Martin
Electronics
acceptance of software), and Final Acceptance Test (software
demonstration at customer facility showing software meets all
requirements as
installed)
Appr
oved labor rates as follows:
-
System Engineer I: 4
1
.15
-
System Engineer II: 4
7
.37
-
System Engineer III: 51.17
-
Lead System Engineer: 5
6
.91
-
Software Engineer I: 4
2
.38
-
Software Engineer II: 47.62
-
Software Engineer III: 51.01
-
Lead Software Engineer: 5
8
.83
-
System Test Engineer I: 4
1
.78
-
System Test Engineer II: 43.
62
-
System Test Engineer III: 49.25
-
Lead System Test Engineer: 5
5
.25
-
Quality Engineer I: 40.38
-
Quality Engineer II: 47.55
-
Quality Engineer III: 5
2
.01
-
Lead Quality Engineer: 59.83
-
Project Manager: 91.
5
5
(LOE
–
Level of Effort
)
-
Chief Engineer: 7
5
.41 (LOE
–
Level of Effort
)
Approved
overhead
rates as follows:
-
Finance:
6
.
2
% of total hours
-
Planning & Scheduling:
5
.
5
% of total hours
5
-
Management (Contracts/Senior Management): 2.
1
% of total hours
-
Facility: 1.
2
% of total hours
-
HR/Staffing: 0.5
5
% of total hours
ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG
2.1
Systems Engineering
: UML Design
for Interface
System Engineering: Create outline of UML
and derived requirements artifacts
.
Software Engineering: Assist system engineering.
Quality Engineering: Provide quality checks
2.2
Systems Engineering:
System/
Software Design
System Engineering: Design appropriate
software components
to display aeronautical
expanse gauges within the techn
ical specs guidelines for twenty
-
five different visual
aspects. Include appropriate level of peer review.
Software Engineering: Assist system engineering.
Quality Engineering: Provide quality checks.
2.3
Systems Engineering:
Approve design
System Enginee
ring: Derive component level requirements for Software
Engineering to
design, code, and unit test and System Test can provide System
and Enterprise level
testing.
Software Engineering: Assist system engineering
System Test Engineering: Derive sell
-
off acce
ptance criteria. Include appropriate peer
review (including System Engineering) and customer approval.
Quality Engineering: Provide quality checks.
3.
1
Software Engineering:
Approve
C
ontent
S/W Component Design
System Engineering: Assist software
engineering
Software Engineering: Provide appropriate level design artifacts
from System
Engineering UML design artifacts. Include appropriate level of
peer review.
System Test Engineering: Derive sell
-
off acceptance criteria. Include appropriate peer
revi
ew (including System Engineering) and customer approval.
6
Quality Engineering: Provide quality checks.
3.
2
Software Engineering: Code and Unit Test
System Engineering: Assist software engineering
Software Engineering: Code and Unit Test software
modules that execute the software
which meets all topical and derived requirements.
Quality Engineering: Provide quality checks.
3.3
Software Engineering: Function Test (with actual gauges)
System Engineering: Assist software engineering
Software Engineer
ing: Check the function
Quality Engineering: Provide quality checks.
4.1
Test Engineering: Design Test Artifacts
System Engineering:
Support
with other engineers for opinion
Software Engineering:
Support
with other engineers for opinion
System Test Engine
ering: Derive System and Enterprise Level Test Cases. Include
appropriate level of peer review.
Quality Engineering: Provide quality checks.
4.2
Test Engineering:
Perform
Environment Level Tests
System Engineering:
Support
with other engineers for opinion
Software Engineering:
Support
with other engineers for opinion
System Test Engineering: Execute test cases as software
modules become available
Quality Engineering: Provide quality checks.
4.3
Test Engineering:
Approve
Test Services (with Customer
Acceptance
Criteria
)
System Test Engineering: Assist Quality Engineering
Quality Engineering: Quality checks during the processes
described for System
Engineering, Software Engineering, and System Test
Engineering as appropriat
e
7
Include the following customer related reviews: Design Review
(after System
Engineering completes design artifacts), Pre
-
Ship Review (provided prior to Astin Martin
Electronics
acceptance of software).
4.4
Test Engineering: Run Test on Live
Environment (Customer Facility)
System Test Engineering: Assist Quality engineering
Quality Engineering: quality checks, and Final Acceptance Test
(software demonstration
at customer facility showing software meets all requirements as
installed) installed)
4.
5
System Test Engineering: Deploy to Operational Environment
(Customer Facility)
System Test Engineering:
work with customer facility team for full deployment
Use approved installation instructions to deploy software into
operational environment
with s
upport from customer facility team
*** Add more WBS activities as required or you deem
necessary ***
Example: May want to add WBS level for Quality Engineering
for derived tasks or those
tasks could be incorporated in the WBS items noted above.
NOTIONAL
ACTIVITY DURATION
SCHEDULE
Notional
Activity estimated Duration
The estimated total elapsed time for how long an activity will
take from starts
to finish, including associated waiting time. Also referred to as
activity
resource estimated or
estimated activity resources.
Example only:
Does not reflect tasks of this assignment
.
8
PROJECT QUESTIONS & TASKS
1.
Provide a
project objective
associated with the
Astin Martin Electronics
project.
Include a list of
assumptions
about the project.
2.
What is a work breakdown structure? What is a resp
onsibility matrix?
Using the Astin
Martin
Astin Martin
Electronics
project
activity list and activity duration schedule
,
create a WBS and RAM.
Work Breakdown Structure
(Should provide
hierarchical graph)
???
Responsibility Assignment Matrix
???
(Example

More Related Content

DOCX
Fall 2018 Project guideline Name CWID Identifi.docx
ShiraPrater50
 
PPT
Manual testing concepts course 1
Raghu Kiran
 
PPTX
SOFTWARE TESTING unit 1 types of software testing.pptx
dishamasane
 
PPTX
Software testing
Ravi Dasari
 
PPT
UNIT V SOFTWARE QUALITY ASSUARANCE (1).ppt
BoyaRaghuveera
 
PPTX
Software Testing Foundations Part 2 - Testing in Software Lifecycle
Nikita Knysh
 
PPTX
Software Engineering
Zahoorali Khan
 
DOC
Processes of website application development
BlazeDream Technologies Pvt Ltd
 
Fall 2018 Project guideline Name CWID Identifi.docx
ShiraPrater50
 
Manual testing concepts course 1
Raghu Kiran
 
SOFTWARE TESTING unit 1 types of software testing.pptx
dishamasane
 
Software testing
Ravi Dasari
 
UNIT V SOFTWARE QUALITY ASSUARANCE (1).ppt
BoyaRaghuveera
 
Software Testing Foundations Part 2 - Testing in Software Lifecycle
Nikita Knysh
 
Software Engineering
Zahoorali Khan
 
Processes of website application development
BlazeDream Technologies Pvt Ltd
 

Similar to Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx (20)

PPTX
System Engineering ppt it is useful for students
AnushaAnusha291014
 
PPTX
Ch 2 what is software quality
Kittitouch Suteeca
 
PPS
Software Development Life Cycle Testingtypes
vladimir zaremba
 
PPTX
Planning the development Process in SE.pptx
V.V.Vanniaperumal College for Women
 
PPS
Test Process
tokarthik
 
PPTX
Ch 10 cost of software quality
Kittitouch Suteeca
 
PPT
Hirschmann: Automotive SPICE Requirements for development process and tools
Intland Software GmbH
 
PPTX
software testing technique
Rana assad ali
 
PPT
software-quality-assurance.pptQuality assurance consists of those procedures,...
amitavabondyopadhyay
 
PPTX
Presentacion testing-procesos
Dilia Ortega
 
PPT
Learn software testing with tech partnerz 1
Techpartnerz
 
PPTX
Ch 8 configuration management
Kittitouch Suteeca
 
PPTX
verification and validation
Dinesh Pasi
 
DOC
Testing Process
maheshpadwal
 
PPTX
Software Engineering
UMA PARAMESWARI
 
PPTX
Software Engineering
UMA PARAMESWARI
 
PPTX
Object oriented testing
Haris Jamil
 
PPT
SQA
Vivastream
 
PPT
Qa
Rapunzall
 
System Engineering ppt it is useful for students
AnushaAnusha291014
 
Ch 2 what is software quality
Kittitouch Suteeca
 
Software Development Life Cycle Testingtypes
vladimir zaremba
 
Planning the development Process in SE.pptx
V.V.Vanniaperumal College for Women
 
Test Process
tokarthik
 
Ch 10 cost of software quality
Kittitouch Suteeca
 
Hirschmann: Automotive SPICE Requirements for development process and tools
Intland Software GmbH
 
software testing technique
Rana assad ali
 
software-quality-assurance.pptQuality assurance consists of those procedures,...
amitavabondyopadhyay
 
Presentacion testing-procesos
Dilia Ortega
 
Learn software testing with tech partnerz 1
Techpartnerz
 
Ch 8 configuration management
Kittitouch Suteeca
 
verification and validation
Dinesh Pasi
 
Testing Process
maheshpadwal
 
Software Engineering
UMA PARAMESWARI
 
Software Engineering
UMA PARAMESWARI
 
Object oriented testing
Haris Jamil
 
Ad

More from rronald3 (20)

DOCX
Some experts assert that who we are is a result of nurture—the rel.docx
rronald3
 
DOCX
Some examples of writingThis is detailed practical guidance with.docx
rronald3
 
DOCX
Some common biometric techniques includeFingerprint recognition.docx
rronald3
 
DOCX
Some common biometric techniques includeFingerprint recogniti.docx
rronald3
 
DOCX
Some common biometric techniques include1. Fingerprint reco.docx
rronald3
 
DOCX
Some common biometric techniques includeFingerprint recog.docx
rronald3
 
DOCX
SOME BROAD TOPICS FOR CRITICAL ESSAYS ON FICTION I .docx
rronald3
 
DOCX
Some Better Practices for Measuring Racial and Ethnic Identity.docx
rronald3
 
DOCX
Some 19th century commentators argued that the poor are not well-ada.docx
rronald3
 
DOCX
Solving the Problem Five-Step Marketing Research Approach.docx
rronald3
 
DOCX
Somatic Symptom and Related DisordersPrior to beginning work o.docx
rronald3
 
DOCX
Soma Bay Prospers with ERP in the CloudSoma Bay is a 10-millio.docx
rronald3
 
DOCX
Somatic symptom disorder has a long history. Sigmund Freud described.docx
rronald3
 
DOCX
Solve dy dx = 2 cos 2x 3+2y , with y(0) = −1. (i) For what values .docx
rronald3
 
DOCX
SolveConsider this hypothetical situationDavid Doe is a ne.docx
rronald3
 
DOCX
SolveConsider this hypothetical situationDavid Doe is a netw.docx
rronald3
 
DOCX
SolutionsPro here is Part II of COMP 101 DB response to classmates. .docx
rronald3
 
DOCX
Solution of Assessment 2Change Management Plan 1.I.docx
rronald3
 
DOCX
Solution-Focused Therapy (Ch 10)Solution-focused practice is.docx
rronald3
 
DOCX
SolutionsPro here is Part II of the Psychology assignment as we disc.docx
rronald3
 
Some experts assert that who we are is a result of nurture—the rel.docx
rronald3
 
Some examples of writingThis is detailed practical guidance with.docx
rronald3
 
Some common biometric techniques includeFingerprint recognition.docx
rronald3
 
Some common biometric techniques includeFingerprint recogniti.docx
rronald3
 
Some common biometric techniques include1. Fingerprint reco.docx
rronald3
 
Some common biometric techniques includeFingerprint recog.docx
rronald3
 
SOME BROAD TOPICS FOR CRITICAL ESSAYS ON FICTION I .docx
rronald3
 
Some Better Practices for Measuring Racial and Ethnic Identity.docx
rronald3
 
Some 19th century commentators argued that the poor are not well-ada.docx
rronald3
 
Solving the Problem Five-Step Marketing Research Approach.docx
rronald3
 
Somatic Symptom and Related DisordersPrior to beginning work o.docx
rronald3
 
Soma Bay Prospers with ERP in the CloudSoma Bay is a 10-millio.docx
rronald3
 
Somatic symptom disorder has a long history. Sigmund Freud described.docx
rronald3
 
Solve dy dx = 2 cos 2x 3+2y , with y(0) = −1. (i) For what values .docx
rronald3
 
SolveConsider this hypothetical situationDavid Doe is a ne.docx
rronald3
 
SolveConsider this hypothetical situationDavid Doe is a netw.docx
rronald3
 
SolutionsPro here is Part II of COMP 101 DB response to classmates. .docx
rronald3
 
Solution of Assessment 2Change Management Plan 1.I.docx
rronald3
 
Solution-Focused Therapy (Ch 10)Solution-focused practice is.docx
rronald3
 
SolutionsPro here is Part II of the Psychology assignment as we disc.docx
rronald3
 
Ad

Recently uploaded (20)

PPTX
Basics and rules of probability with real-life uses
ravatkaran694
 
PPTX
Artificial-Intelligence-in-Drug-Discovery by R D Jawarkar.pptx
Rahul Jawarkar
 
PPTX
BASICS IN COMPUTER APPLICATIONS - UNIT I
suganthim28
 
PPTX
Information Texts_Infographic on Forgetting Curve.pptx
Tata Sevilla
 
PPTX
How to Track Skills & Contracts Using Odoo 18 Employee
Celine George
 
PPTX
An introduction to Prepositions for beginners.pptx
drsiddhantnagine
 
PPTX
A Smarter Way to Think About Choosing a College
Cyndy McDonald
 
PPTX
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
PDF
The Minister of Tourism, Culture and Creative Arts, Abla Dzifa Gomashie has e...
nservice241
 
PPTX
INTESTINALPARASITES OR WORM INFESTATIONS.pptx
PRADEEP ABOTHU
 
PPTX
HISTORY COLLECTION FOR PSYCHIATRIC PATIENTS.pptx
PoojaSen20
 
PDF
Module 2: Public Health History [Tutorial Slides]
JonathanHallett4
 
PPTX
Artificial Intelligence in Gastroentrology: Advancements and Future Presprec...
AyanHossain
 
PDF
RA 12028_ARAL_Orientation_Day-2-Sessions_v2.pdf
Seven De Los Reyes
 
PDF
BÀI TẬP TEST BỔ TRỢ THEO TỪNG CHỦ ĐỀ CỦA TỪNG UNIT KÈM BÀI TẬP NGHE - TIẾNG A...
Nguyen Thanh Tu Collection
 
PPTX
How to Close Subscription in Odoo 18 - Odoo Slides
Celine George
 
PDF
Health-The-Ultimate-Treasure (1).pdf/8th class science curiosity /samyans edu...
Sandeep Swamy
 
DOCX
Action Plan_ARAL PROGRAM_ STAND ALONE SHS.docx
Levenmartlacuna1
 
DOCX
Modul Ajar Deep Learning Bahasa Inggris Kelas 11 Terbaru 2025
wahyurestu63
 
DOCX
pgdei-UNIT -V Neurological Disorders & developmental disabilities
JELLA VISHNU DURGA PRASAD
 
Basics and rules of probability with real-life uses
ravatkaran694
 
Artificial-Intelligence-in-Drug-Discovery by R D Jawarkar.pptx
Rahul Jawarkar
 
BASICS IN COMPUTER APPLICATIONS - UNIT I
suganthim28
 
Information Texts_Infographic on Forgetting Curve.pptx
Tata Sevilla
 
How to Track Skills & Contracts Using Odoo 18 Employee
Celine George
 
An introduction to Prepositions for beginners.pptx
drsiddhantnagine
 
A Smarter Way to Think About Choosing a College
Cyndy McDonald
 
TEF & EA Bsc Nursing 5th sem.....BBBpptx
AneetaSharma15
 
The Minister of Tourism, Culture and Creative Arts, Abla Dzifa Gomashie has e...
nservice241
 
INTESTINALPARASITES OR WORM INFESTATIONS.pptx
PRADEEP ABOTHU
 
HISTORY COLLECTION FOR PSYCHIATRIC PATIENTS.pptx
PoojaSen20
 
Module 2: Public Health History [Tutorial Slides]
JonathanHallett4
 
Artificial Intelligence in Gastroentrology: Advancements and Future Presprec...
AyanHossain
 
RA 12028_ARAL_Orientation_Day-2-Sessions_v2.pdf
Seven De Los Reyes
 
BÀI TẬP TEST BỔ TRỢ THEO TỪNG CHỦ ĐỀ CỦA TỪNG UNIT KÈM BÀI TẬP NGHE - TIẾNG A...
Nguyen Thanh Tu Collection
 
How to Close Subscription in Odoo 18 - Odoo Slides
Celine George
 
Health-The-Ultimate-Treasure (1).pdf/8th class science curiosity /samyans edu...
Sandeep Swamy
 
Action Plan_ARAL PROGRAM_ STAND ALONE SHS.docx
Levenmartlacuna1
 
Modul Ajar Deep Learning Bahasa Inggris Kelas 11 Terbaru 2025
wahyurestu63
 
pgdei-UNIT -V Neurological Disorders & developmental disabilities
JELLA VISHNU DURGA PRASAD
 

Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx

  • 1. Software Project Team (YOU): JBB Software Customer: Astin Martin Electronics LLC RFP awarded for specific message services which will be incorporated into a n electronic instrument company (Astin Martin Electronics LLC) interface to electronic gauges . Topical level requirements for the software were provided. Deliverable products include: - Systems Engineering to provid e appropriate requirements decomposition
  • 2. - Software Engineering to provide design/development/unit test of software - System Test Engineering to provide component and enterprise level testing - Quality Engineering to provide quality control through the entire de velopment life cycle - Management functions to include all primary functions (project management, finance, planning & scheduling, Overhead support (contracts, engineering matrix, etc.) Award date of May 15 and required completion date (deliverables provided) of November 15.
  • 3. Astin Martin Electronics request of planned deliverables, acceptance criteria, quality plan, and work breakdown structure. These items need to be provided in an acceptable time for Astin Martin to review and approve. Astin Martin Electroni cs further requests other deliverables to include final software (source and binary) which meets all approved acceptance criteria, associated design documents (system and development level) All project questions or request for project scope changes should be directed to the Astin Martin Electronics designee (course instructor). There is no requirement relative to project tools used to
  • 4. generate the required data. Topical requirements include: - System Engineering: UML design artifacts for graphic widgets to di splay aeronautical expanse gauges for interface testing within the technical specs guidelines for twenty - five different visual aspects. Include appropriate level of peer review. Design should include graphical mock - up of gauges.
  • 5. 4 - System Engineering: Derive component level requirements for Software Engineering to design, code, and unit test and System Test can provide System and Enterprise level testing - Software Engineering: Provide appropriate level design artifacts from System Engineering UML design artifac ts. Include appropriate level of peer review. - Software Engineering: Code and Unit Test software modules that execute the software which meets all topical and derived requirements - System Test Engineering: Derive sell -
  • 6. off acceptance criteria. Include appropr iate peer review (including System Engineering) and customer approval. - System Test Engineering: Derive System and Enterprise Level Test Cases. Include appropriate level of peer review. - System Test Engineering: Execute test cases as software modules become available - Quality Engineering: Provide quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriate - Include the following customer related reviews: Design Review
  • 7. (after System Engineering completes design artifacts), Pre - Ship Review (provided prior to Astin Martin Electronics acceptance of software), and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) Appr oved labor rates as follows: - System Engineer I: 4 1 .15 - System Engineer II: 4 7
  • 8. .37 - System Engineer III: 51.17 - Lead System Engineer: 5 6 .91 - Software Engineer I: 4 2 .38 - Software Engineer II: 47.62 - Software Engineer III: 51.01 - Lead Software Engineer: 5 8
  • 9. .83 - System Test Engineer I: 4 1 .78 - System Test Engineer II: 43. 62 - System Test Engineer III: 49.25 - Lead System Test Engineer: 5 5 .25 - Quality Engineer I: 40.38 - Quality Engineer II: 47.55
  • 10. - Quality Engineer III: 5 2 .01 - Lead Quality Engineer: 59.83 - Project Manager: 91. 5 5 (LOE – Level of Effort ) - Chief Engineer: 7 5 .41 (LOE
  • 11. – Level of Effort ) Approved overhead rates as follows: - Finance: 6 . 2 % of total hours - Planning & Scheduling: 5 . 5 % of total hours
  • 12. 5 - Management (Contracts/Senior Management): 2. 1 % of total hours - Facility: 1. 2 % of total hours - HR/Staffing: 0.5 5 % of total hours ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG 2.1 Systems Engineering : UML Design
  • 13. for Interface System Engineering: Create outline of UML and derived requirements artifacts . Software Engineering: Assist system engineering. Quality Engineering: Provide quality checks 2.2 Systems Engineering: System/ Software Design System Engineering: Design appropriate software components to display aeronautical expanse gauges within the techn ical specs guidelines for twenty - five different visual aspects. Include appropriate level of peer review.
  • 14. Software Engineering: Assist system engineering. Quality Engineering: Provide quality checks. 2.3 Systems Engineering: Approve design System Enginee ring: Derive component level requirements for Software Engineering to design, code, and unit test and System Test can provide System and Enterprise level testing. Software Engineering: Assist system engineering System Test Engineering: Derive sell - off acce ptance criteria. Include appropriate peer review (including System Engineering) and customer approval. Quality Engineering: Provide quality checks. 3.
  • 15. 1 Software Engineering: Approve C ontent S/W Component Design System Engineering: Assist software engineering Software Engineering: Provide appropriate level design artifacts from System Engineering UML design artifacts. Include appropriate level of peer review. System Test Engineering: Derive sell - off acceptance criteria. Include appropriate peer revi ew (including System Engineering) and customer approval. 6 Quality Engineering: Provide quality checks.
  • 16. 3. 2 Software Engineering: Code and Unit Test System Engineering: Assist software engineering Software Engineering: Code and Unit Test software modules that execute the software which meets all topical and derived requirements. Quality Engineering: Provide quality checks. 3.3 Software Engineering: Function Test (with actual gauges) System Engineering: Assist software engineering Software Engineer ing: Check the function Quality Engineering: Provide quality checks. 4.1 Test Engineering: Design Test Artifacts System Engineering: Support
  • 17. with other engineers for opinion Software Engineering: Support with other engineers for opinion System Test Engine ering: Derive System and Enterprise Level Test Cases. Include appropriate level of peer review. Quality Engineering: Provide quality checks. 4.2 Test Engineering: Perform Environment Level Tests System Engineering: Support with other engineers for opinion Software Engineering: Support with other engineers for opinion
  • 18. System Test Engineering: Execute test cases as software modules become available Quality Engineering: Provide quality checks. 4.3 Test Engineering: Approve Test Services (with Customer Acceptance Criteria ) System Test Engineering: Assist Quality Engineering Quality Engineering: Quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriat e 7 Include the following customer related reviews: Design Review (after System
  • 19. Engineering completes design artifacts), Pre - Ship Review (provided prior to Astin Martin Electronics acceptance of software). 4.4 Test Engineering: Run Test on Live Environment (Customer Facility) System Test Engineering: Assist Quality engineering Quality Engineering: quality checks, and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) installed) 4. 5 System Test Engineering: Deploy to Operational Environment (Customer Facility) System Test Engineering: work with customer facility team for full deployment Use approved installation instructions to deploy software into
  • 20. operational environment with s upport from customer facility team *** Add more WBS activities as required or you deem necessary *** Example: May want to add WBS level for Quality Engineering for derived tasks or those tasks could be incorporated in the WBS items noted above. NOTIONAL ACTIVITY DURATION SCHEDULE Notional Activity estimated Duration The estimated total elapsed time for how long an activity will take from starts to finish, including associated waiting time. Also referred to as activity resource estimated or estimated activity resources. Example only:
  • 21. Does not reflect tasks of this assignment . 8 PROJECT QUESTIONS & TASKS 1. Provide a project objective associated with the Astin Martin Electronics project. Include a list of assumptions about the project. 2. What is a work breakdown structure? What is a resp onsibility matrix? Using the Astin Martin
  • 22. Astin Martin Electronics project activity list and activity duration schedule , create a WBS and RAM. Work Breakdown Structure (Should provide hierarchical graph) ??? Responsibility Assignment Matrix ??? (Example