SlideShare a Scribd company logo
Some Key Considerations RelatingSome Key Considerations Relating
to the Deployment of Nuclearto the Deployment of Nuclear
Powerplants in AustraliaPowerplants in Australia
Presented at the 35Presented at the 35thth Annual Meeting of theAnnual Meeting of the
Australasian Radiation Protection SocietyAustralasian Radiation Protection Society
Adelaide, South AustraliaAdelaide, South Australia
October 2010October 2010
George Anastas, ConsultantGeorge Anastas, Consultant
PE, CHP, FHPS, DEE, FARPSPE, CHP, FHPS, DEE, FARPS
PastPast--President, Health Physics SocietyPresident, Health Physics Society
11021 BridgePointe, NE11021 BridgePointe, NE
Albuquerque, NM 87111Albuquerque, NM 87111
USAUSA
22
Ye Olde DisclaimerYe Olde Disclaimer
• The views expressed herein reflect only the views and
opinions of the author. These may or may not
represent or reflect the views and opinions of any
past, current or future employer(s), professional
societies, my wife, children, sons-in-law, daughter-in-
law, present and future grandchildren, friends or
colleagues.
• George Anastas, Albuquerque, New Mexico
October 2010
33
Some FactsFacts
• The fissioning of atoms produces energy
which can be used to generate steam, to
drive a turbine generator to produce
electricity.
• There are hundreds of operating nuclear
powerplants worldwide.
• There are over 100 nuclear powerplants in
the construction or planning process.
44
Additional Facts
• kWhr (energy) is growing in Australia
(?4%/yr since 1990).
• Peak electrical load (in MegaWatts) is
growing in Australia.
55
More Facts
• There are advantages to using nuclear power to
produce electricity. (reduced “greenhouse
gases”, diversity of fuel mix, displace additional
coal fueled units, brown and black coal =70% of
electricity generation, …)
• Australia emits ~1.5% of the world’s GHG.
• There are disadvantages to using nuclear power
to produce electricity. (capital costs,
infrastructure needs, dis-economies of scale, …)
66
A Quote from George
(Not Anastas)
• As George Santanya (Jorge Agustín
Nicolás Ruiz de Santayana y Borrás) a
Spanish-American philosopher, essayist,
poet, and novelist once said,
“Those who cannot remember the past
are condemned to repeat it.”
77
Prelude
• If, for a variety of reasons, it is in
the “public interest” to pursue the
development of nuclear
powerplants in Australia, then…
88
Australia Is in a Unique (and
envious) Situation
• Australia can critically evaluate the path
forward, learning from the mistakes/errors
missteps of others.
One does not have to be first, but one
should try to be the best.
George Anastas, October 2010
99
Suggestions/Considerations (1)
• Select one or two vendors/types of reactors (proven
track record for design, construction and operation,
do not go for a large size, unique design, etc.).
• Assure management has experience overseeing
massive projects over a long time horizon.
• Train/educate utility staff (assignment overseas,
particularly for operators).
• Select a turbine generator that “fits” with the
characteristics of the steam produced by the NSSS.
• Be wary of language and culture of vendor(s).
1010
Suggestions/Considerations (2)
• Insurance (limit liability?, property)
• Size of powerplant (operating reserve {single
largest generator + fraction of peak load},
sharing reserves, transmission constraints,
cooling water, market forces, baseload, etc.).
• Siting considerations (bank sites, ?Jervis
Bay?)
• Financing/Capital cost (Loan Guarantees?).
• Construction time
1111
Suggestions/Considerations (3)
• Begin to develop the infrastructure (education,
training, nuclear engineering, assignment to
similar nuclear powerplants).
• Begin to develop the INDEPENDENT regulatory
structure (and training for the regulatory staff).
• Regulatory Agency = Absolutely and
Unambiguously, No Promotion.
• Regulatory Agency=Transparent, Arms Length
(do not let the dingoes tend the sheep!).
1212
Suggestions/Considerations (4)
• Enticing offshore experienced human
resources with nuclear power project
experience to support available Australian
human resources (?)
• Turnkey arrangements
• Russia’ recent arrangements with Turkey
– Finance
– Operation
1313
The Ugly Difficult, The BadThe Ugly Difficult, The Bad
and The Goodand The Good
(Apologies to(Apologies to
Clint Eastwood, et al)Clint Eastwood, et al)
1414
Chaos (?) at the Vendor LevelChaos (?) at the Vendor Level
• KEPCO, PWR
• AREVA, PWR
• Westinghouse, PWR
• General Electric, BWR
• Toshiba
• Hitachi
• Mitsubishi Heavy Industries
• AECL, CANDU
• Numerous Joint Ventures
• Russia (?) VEER
• China (?)
• India (?)
1515
NotNot--SoSo--Minor Reliability ItemsMinor Reliability Items
• Turbine generator supplier (have to match
NSSS steam conditions with TG, so TG
supplier and NSSS vendor have to talk)
• Forced Outage Rates for NSSS
• Forced outage rates for TG
1616
Other NotOther Not--So Minor ItemsSo Minor Items
• Enrichment Services (?)
• Low/Intermediate level waste disposal
(Ngapa land at Muckaty Station??)
• Spent Fuel Storage/Disposal
• Financing (1000 MWe, $US 5-10 B, 5-10
years construction time period)
1717
Additional NotAdditional Not--SoSo--Minor ItemsMinor Items
• A/E Services
• Construction (QA)
• Outage management
• Cooling water (cooling towers, perhaps:
fresh water cooling, don’t think so: that
leaves once through sea water)
• Then because of the above, thermal
discharge
1818
The BadThe Bad
• Anything that is not UGLY Difficult and
not Good
1919
The GoodThe Good
• Do it right (correctly) the first time.
2020
EpilogueEpilogue
• Beware the regulator that promotes.
• Beware the promoters.
• Base decisions on facts, not wishful thinking.
• If it is too good to be true, then …
• Since there may be VAST HUGE sums
involved at an unknown financial risk, perhaps
proceed carefully in an incremental risk adverse
approach.
2121
Epilogue (2)Epilogue (2)
• What organization owns/operates the
power reactor?
– Australian Private industry
– Foreign entity (like Russian/Turkish
arrangement)
– Australian Federal government
• Federal Authority
• Federal Company
– Some combination
2222
Ye Olde DisclaimerYe Olde Disclaimer
• The views expressed herein reflect only the views and
opinions of the author. These may or may not
represent or reflect the views and opinions of any
past, current or future employer(s), professional
societies, my wife, children, sons-in-law, daughter-in-
law, present and future grandchildren, friends or
colleagues.
• George Anastas, Albuquerque, New Mexico
October 2010

More Related Content

PDF
Tesco CDS Questions & Answers
Benji George
 
PDF
Bucket Builds - Undercarriage Parts
conversion2015
 
PPTX
123
H00202945
 
PPT
ฉันเหมือนใคร
phaiza
 
PDF
4 sesons
Nadine Shammas
 
PPTX
Mauna Loa
sudaratkaenjan
 
PDF
Parnassus data recovery manager prm overview
maclean liu
 
PDF
Parnassus data技术白皮书v0.1
maclean liu
 
Tesco CDS Questions & Answers
Benji George
 
Bucket Builds - Undercarriage Parts
conversion2015
 
ฉันเหมือนใคร
phaiza
 
4 sesons
Nadine Shammas
 
Mauna Loa
sudaratkaenjan
 
Parnassus data recovery manager prm overview
maclean liu
 
Parnassus data技术白皮书v0.1
maclean liu
 

Viewers also liked (20)

PPTX
สุขศึกษา
saly12300
 
PDF
【Maclean liu技术分享】拨开oracle cbo优化器迷雾,探究histogram直方图之秘 0321
maclean liu
 
PDF
Sparago poetry anthology
jimbothewalrus
 
PDF
Research wire salarysurvey-2009
maclean liu
 
PPTX
New Zealand Franchising Confidence Index | October 2011
Franchize Consultants
 
PDF
Book Of Hours
The City of Toronto
 
PPTX
Introduction: Jukka Huhtamäki | Dagstuhl 16141
Jukka Huhtamäki
 
DOCX
Puntuaciones provisionales (miércoles 26 a las 16h)
Emi Voces
 
PDF
如何安装Oracle one off临时小补丁及注意事项
maclean liu
 
PDF
Kisi-kisi Materi PLPG IPA SMP
Irma Muthiara Sari
 
PPTX
контекстная реклама
Илья Ялунин
 
PDF
图文详解安装Net backup 6.5备份恢复oracle 10g rac 数据库
maclean liu
 
PDF
深入了解Oracle自动内存管理asmm
maclean liu
 
PPTX
2 clasificación de los ángulos
Ricardo Castro
 
PDF
What if I can design my care?
Stefania Marcoli
 
PPTX
Recruitment Services of M/s. Diverse
ManpowerGroup India
 
PDF
Permendikbud no-104-tahun-2014
Irma Muthiara Sari
 
PDF
Ubuntu Social Media Brief
Molly Aaker
 
สุขศึกษา
saly12300
 
【Maclean liu技术分享】拨开oracle cbo优化器迷雾,探究histogram直方图之秘 0321
maclean liu
 
Sparago poetry anthology
jimbothewalrus
 
Research wire salarysurvey-2009
maclean liu
 
New Zealand Franchising Confidence Index | October 2011
Franchize Consultants
 
Book Of Hours
The City of Toronto
 
Introduction: Jukka Huhtamäki | Dagstuhl 16141
Jukka Huhtamäki
 
Puntuaciones provisionales (miércoles 26 a las 16h)
Emi Voces
 
如何安装Oracle one off临时小补丁及注意事项
maclean liu
 
Kisi-kisi Materi PLPG IPA SMP
Irma Muthiara Sari
 
контекстная реклама
Илья Ялунин
 
图文详解安装Net backup 6.5备份恢复oracle 10g rac 数据库
maclean liu
 
深入了解Oracle自动内存管理asmm
maclean liu
 
2 clasificación de los ángulos
Ricardo Castro
 
What if I can design my care?
Stefania Marcoli
 
Recruitment Services of M/s. Diverse
ManpowerGroup India
 
Permendikbud no-104-tahun-2014
Irma Muthiara Sari
 
Ubuntu Social Media Brief
Molly Aaker
 
Ad

Similar to Some key considerations relating anastas (20)

PDF
The Future of Nuclear Power after Fukushima
Société Française d'Energie Nucléaire
 
PDF
CRCARE conference_Nuclear Power_FINAL
Sharon Kelly
 
PDF
Electricity Journal Article
jcarter1972
 
PPTX
Nuclear Energy in Australia From Barriers to Benefits.pptx
University of Canberra
 
PDF
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
Nick Bentley
 
PDF
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Denis Senin
 
PDF
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Versli Lietuva (Enterprise Lithuania)
 
PDF
Jens Gunnars, „Inspecta Technology“ technikos vadovas, Mikael Kuokkanen, „Ins...
Versli Lietuva (Enterprise Lithuania)
 
PDF
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Denis Senin
 
PPTX
Nuclear energy
abhishekshah97
 
PPTX
Presentation On Nuclear power plant By Khairul Bashar
Khairul Bashar
 
PPTX
Post Fukushima
Nicholas Girard
 
PDF
Nuclear technology
Probodh Mallick
 
PDF
Nuclear Global and European Markets status
Capgemini
 
PDF
An Architect Engineers Response to Fukushima
Alexander Wolski
 
PPT
Nuclear Power Plant.ppt
SambhajiHarwandkar1
 
PPTX
Michigan Energy Forum - November 7, 2013 - Balancing Energy and Environmental...
AnnArborSPARK
 
PPTX
Facts behind Chernobyl
Greg Lipka
 
PDF
Nuclear power plant
Abishek Arumugam
 
The Future of Nuclear Power after Fukushima
Société Française d'Energie Nucléaire
 
CRCARE conference_Nuclear Power_FINAL
Sharon Kelly
 
Electricity Journal Article
jcarter1972
 
Nuclear Energy in Australia From Barriers to Benefits.pptx
University of Canberra
 
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
Nick Bentley
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Denis Senin
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Versli Lietuva (Enterprise Lithuania)
 
Jens Gunnars, „Inspecta Technology“ technikos vadovas, Mikael Kuokkanen, „Ins...
Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Denis Senin
 
Nuclear energy
abhishekshah97
 
Presentation On Nuclear power plant By Khairul Bashar
Khairul Bashar
 
Post Fukushima
Nicholas Girard
 
Nuclear technology
Probodh Mallick
 
Nuclear Global and European Markets status
Capgemini
 
An Architect Engineers Response to Fukushima
Alexander Wolski
 
Nuclear Power Plant.ppt
SambhajiHarwandkar1
 
Michigan Energy Forum - November 7, 2013 - Balancing Energy and Environmental...
AnnArborSPARK
 
Facts behind Chernobyl
Greg Lipka
 
Nuclear power plant
Abishek Arumugam
 
Ad

More from Leishman Associates (20)

PPS
1410 young
Leishman Associates
 
PDF
General physicians and the adf Heddle
Leishman Associates
 
PDF
Navy asbestos containing material (acm) Westphalen
Leishman Associates
 
PDF
Endurance, Courage and Care: The 1942 Kokoda Track Campaign of Captain Alan W...
Leishman Associates
 
PDF
The Loss of HMAS SYDNEY 2: Medical Aspects- Westphalen
Leishman Associates
 
PDF
Recognising early deteriorating signs a project at kapooka health centre pocius
Leishman Associates
 
PDF
Pilot selection anthropometry a comparison with measures taken by a single a...
Leishman Associates
 
PDF
Introduction of the mrh90 helicopter and top owl helmet for operational use b...
Leishman Associates
 
PDF
Understanding the impact of military deployment on families an australian stu...
Leishman Associates
 
PDF
Innovation in joint health command clinical governance murphy
Leishman Associates
 
PDF
Managing expectations can we really call on our big blue brother- busch
Leishman Associates
 
PDF
Afganistan was i ready for that- langcake
Leishman Associates
 
PDF
Mobile Field RAP, Regimental Aid Post- Gordon
Leishman Associates
 
PDF
Are suicide rates for young australian males really falling the recent contr...
Leishman Associates
 
PDF
Finding AHS Centaur- mearns
Leishman Associates
 
PDF
The Uniformed Services University of the Health Sciences- A Unique Resource- ...
Leishman Associates
 
PDF
The US army public health command initiative transforming public health serv...
Leishman Associates
 
PDF
Comprehensive Soldier Fitness Concept- Baker
Leishman Associates
 
PDF
Case report of thoracic spine fractures from ied blast in armoured vehicle Y...
Leishman Associates
 
PDF
Real world attenuation of foam earplugs- Smith
Leishman Associates
 
General physicians and the adf Heddle
Leishman Associates
 
Navy asbestos containing material (acm) Westphalen
Leishman Associates
 
Endurance, Courage and Care: The 1942 Kokoda Track Campaign of Captain Alan W...
Leishman Associates
 
The Loss of HMAS SYDNEY 2: Medical Aspects- Westphalen
Leishman Associates
 
Recognising early deteriorating signs a project at kapooka health centre pocius
Leishman Associates
 
Pilot selection anthropometry a comparison with measures taken by a single a...
Leishman Associates
 
Introduction of the mrh90 helicopter and top owl helmet for operational use b...
Leishman Associates
 
Understanding the impact of military deployment on families an australian stu...
Leishman Associates
 
Innovation in joint health command clinical governance murphy
Leishman Associates
 
Managing expectations can we really call on our big blue brother- busch
Leishman Associates
 
Afganistan was i ready for that- langcake
Leishman Associates
 
Mobile Field RAP, Regimental Aid Post- Gordon
Leishman Associates
 
Are suicide rates for young australian males really falling the recent contr...
Leishman Associates
 
Finding AHS Centaur- mearns
Leishman Associates
 
The Uniformed Services University of the Health Sciences- A Unique Resource- ...
Leishman Associates
 
The US army public health command initiative transforming public health serv...
Leishman Associates
 
Comprehensive Soldier Fitness Concept- Baker
Leishman Associates
 
Case report of thoracic spine fractures from ied blast in armoured vehicle Y...
Leishman Associates
 
Real world attenuation of foam earplugs- Smith
Leishman Associates
 

Some key considerations relating anastas

  • 1. Some Key Considerations RelatingSome Key Considerations Relating to the Deployment of Nuclearto the Deployment of Nuclear Powerplants in AustraliaPowerplants in Australia Presented at the 35Presented at the 35thth Annual Meeting of theAnnual Meeting of the Australasian Radiation Protection SocietyAustralasian Radiation Protection Society Adelaide, South AustraliaAdelaide, South Australia October 2010October 2010 George Anastas, ConsultantGeorge Anastas, Consultant PE, CHP, FHPS, DEE, FARPSPE, CHP, FHPS, DEE, FARPS PastPast--President, Health Physics SocietyPresident, Health Physics Society 11021 BridgePointe, NE11021 BridgePointe, NE Albuquerque, NM 87111Albuquerque, NM 87111 USAUSA
  • 2. 22 Ye Olde DisclaimerYe Olde Disclaimer • The views expressed herein reflect only the views and opinions of the author. These may or may not represent or reflect the views and opinions of any past, current or future employer(s), professional societies, my wife, children, sons-in-law, daughter-in- law, present and future grandchildren, friends or colleagues. • George Anastas, Albuquerque, New Mexico October 2010
  • 3. 33 Some FactsFacts • The fissioning of atoms produces energy which can be used to generate steam, to drive a turbine generator to produce electricity. • There are hundreds of operating nuclear powerplants worldwide. • There are over 100 nuclear powerplants in the construction or planning process.
  • 4. 44 Additional Facts • kWhr (energy) is growing in Australia (?4%/yr since 1990). • Peak electrical load (in MegaWatts) is growing in Australia.
  • 5. 55 More Facts • There are advantages to using nuclear power to produce electricity. (reduced “greenhouse gases”, diversity of fuel mix, displace additional coal fueled units, brown and black coal =70% of electricity generation, …) • Australia emits ~1.5% of the world’s GHG. • There are disadvantages to using nuclear power to produce electricity. (capital costs, infrastructure needs, dis-economies of scale, …)
  • 6. 66 A Quote from George (Not Anastas) • As George Santanya (Jorge Agustín Nicolás Ruiz de Santayana y Borrás) a Spanish-American philosopher, essayist, poet, and novelist once said, “Those who cannot remember the past are condemned to repeat it.”
  • 7. 77 Prelude • If, for a variety of reasons, it is in the “public interest” to pursue the development of nuclear powerplants in Australia, then…
  • 8. 88 Australia Is in a Unique (and envious) Situation • Australia can critically evaluate the path forward, learning from the mistakes/errors missteps of others. One does not have to be first, but one should try to be the best. George Anastas, October 2010
  • 9. 99 Suggestions/Considerations (1) • Select one or two vendors/types of reactors (proven track record for design, construction and operation, do not go for a large size, unique design, etc.). • Assure management has experience overseeing massive projects over a long time horizon. • Train/educate utility staff (assignment overseas, particularly for operators). • Select a turbine generator that “fits” with the characteristics of the steam produced by the NSSS. • Be wary of language and culture of vendor(s).
  • 10. 1010 Suggestions/Considerations (2) • Insurance (limit liability?, property) • Size of powerplant (operating reserve {single largest generator + fraction of peak load}, sharing reserves, transmission constraints, cooling water, market forces, baseload, etc.). • Siting considerations (bank sites, ?Jervis Bay?) • Financing/Capital cost (Loan Guarantees?). • Construction time
  • 11. 1111 Suggestions/Considerations (3) • Begin to develop the infrastructure (education, training, nuclear engineering, assignment to similar nuclear powerplants). • Begin to develop the INDEPENDENT regulatory structure (and training for the regulatory staff). • Regulatory Agency = Absolutely and Unambiguously, No Promotion. • Regulatory Agency=Transparent, Arms Length (do not let the dingoes tend the sheep!).
  • 12. 1212 Suggestions/Considerations (4) • Enticing offshore experienced human resources with nuclear power project experience to support available Australian human resources (?) • Turnkey arrangements • Russia’ recent arrangements with Turkey – Finance – Operation
  • 13. 1313 The Ugly Difficult, The BadThe Ugly Difficult, The Bad and The Goodand The Good (Apologies to(Apologies to Clint Eastwood, et al)Clint Eastwood, et al)
  • 14. 1414 Chaos (?) at the Vendor LevelChaos (?) at the Vendor Level • KEPCO, PWR • AREVA, PWR • Westinghouse, PWR • General Electric, BWR • Toshiba • Hitachi • Mitsubishi Heavy Industries • AECL, CANDU • Numerous Joint Ventures • Russia (?) VEER • China (?) • India (?)
  • 15. 1515 NotNot--SoSo--Minor Reliability ItemsMinor Reliability Items • Turbine generator supplier (have to match NSSS steam conditions with TG, so TG supplier and NSSS vendor have to talk) • Forced Outage Rates for NSSS • Forced outage rates for TG
  • 16. 1616 Other NotOther Not--So Minor ItemsSo Minor Items • Enrichment Services (?) • Low/Intermediate level waste disposal (Ngapa land at Muckaty Station??) • Spent Fuel Storage/Disposal • Financing (1000 MWe, $US 5-10 B, 5-10 years construction time period)
  • 17. 1717 Additional NotAdditional Not--SoSo--Minor ItemsMinor Items • A/E Services • Construction (QA) • Outage management • Cooling water (cooling towers, perhaps: fresh water cooling, don’t think so: that leaves once through sea water) • Then because of the above, thermal discharge
  • 18. 1818 The BadThe Bad • Anything that is not UGLY Difficult and not Good
  • 19. 1919 The GoodThe Good • Do it right (correctly) the first time.
  • 20. 2020 EpilogueEpilogue • Beware the regulator that promotes. • Beware the promoters. • Base decisions on facts, not wishful thinking. • If it is too good to be true, then … • Since there may be VAST HUGE sums involved at an unknown financial risk, perhaps proceed carefully in an incremental risk adverse approach.
  • 21. 2121 Epilogue (2)Epilogue (2) • What organization owns/operates the power reactor? – Australian Private industry – Foreign entity (like Russian/Turkish arrangement) – Australian Federal government • Federal Authority • Federal Company – Some combination
  • 22. 2222 Ye Olde DisclaimerYe Olde Disclaimer • The views expressed herein reflect only the views and opinions of the author. These may or may not represent or reflect the views and opinions of any past, current or future employer(s), professional societies, my wife, children, sons-in-law, daughter-in- law, present and future grandchildren, friends or colleagues. • George Anastas, Albuquerque, New Mexico October 2010