History
• Founded in 1946 as electronic test equipment maker in Oregon.
• Expanded into manufacturing electronic tool and devices
• Business split: 1) Measurement Business Divison(MBD)
2) Color Printing and Imaging Division(CPID)
3)Video and Networking Division(VND)
• Presence in 60 countries and a worldwide leader in Oscilloscope,
television test measurement and monitoring equipment.
Need for New IT system
1) Lack of integration and presence of incoordination of IT
system.
2) Global competition was increasing
3) Financial performance was suffering
• 460 legacy systems in US alone
• No standardisation
• Redundancy of order entry at multiple places
• Chance of error
• Incomplete and Inaccurate information
MovingTowards ERP system
• Neun (CFO) vision’s: “Frankfurt is Orlando”
• Initiated by Roy Barker, President of CPID
• Inability of existing system to support the division
• CPID expansion plans: from niche market of graphics terminals in
mainframes to mass market PC based customers
• Easy justification for ERP implementation
ExpandingTheVision
Neun’s vision for the enterprise had 3 components
• Separability of the businesses
• Leveraging shared services
• Staying as “plain vanilla” as possible
Planning for ERP
Selecting Software Project Organization &
management
Worldwide business model Project Schedule
Selecting Software
•Retain manufacturing package
•Buy v/s Build
•Single vendor ERP strategy to refrain from issues like
• Maintenance
• Integration
• Upgradation
•Choosing Oracle
Worldwide business model
•Steering committee
• To develop a “Global business model”
• To develop “Business practice changes and guiding
principles”
•Complex Architecture
Business practice changes and guiding principles
ERP System Architecture
Project Organization and Management
• Key roles like program manager, user leader, global leader,
functional experts, power users, functional sub teams and test
teams.
• Combination of technical and functional strength to resolve
issues.
• Project headed by Carl Neun (CFO) – final arbiter and had
complete authority on implementation. Also established a set
of fundamentals.
• Division presidents and Neun acted to resolve major project
management problems.
Tektronix : Global ERP Implementation
Project Schedule
• Carl Neun believed scheduling much more important than
budget.
• A single change program consisting of many “waves”.
• Waves were scheduled to deliver a specific functionality
with feedback expected.
• Also some flexibility in scheduling.
Implementation
• Split into five major sub-projects
• First led by Gary Allen, IT Director – Finance and HR
Systems, two through four led by divisional IT
Directors consisting of OMAR projects and the final
global rollout led by Gordon
•Financials in parallel with OMAR in CPID division (first
in US)
Implementation - Financials
•Goal to have single view of all financial information
worldwide
•Required a number of changes in business processes
•Allow visibility of up-to-date information
about financial status by standardizing charts-
of-accounts and eliminating complexity
Implementation – Financials (contd.)
• Europe with larger changes
Profit-center to a straight commission basis
No supervisory duties but only administrative
Change in financial transaction processes with single location i.e.
Marlow, England
• Single language and single measurement basis insideTektronix
• Sales people using local language
• Oracle package not satisfying all requirements
Implementation Support
• Small and large consulting firms as well as independent
consultants
• Aris Consulting specialized in Oracle implementations
• Functional expert teamed with user and IT leads fromTektronix
• For less functional and business expertise  lower cost technical
consultants, developing interface between Oracle and
manufacturing package  small firms
• Cost reduction due to resell the interface to other companies
Order Management/Accounts Receivables
(OMAR)
• Omar implementation was similar to financials in its approach, but
different in execution. “PlainVanilla” implementation is not fully
possible here because of following reasons :
1.Different business lines have different types of customers.
2.Oracle did not have some of the functionality required for OMAR.
3.Customer facing documents should be in local language.
4.Each country had slightly different legal language for official
documents.
Implementing OMAR at CPID
• Natural choice – Favoring Management, build to order stock.
• Initially launched in beta version and instability forced
implementation team to spend months on debugging.
• Initially Poor results by large consulting firm, later hired Aris,
oracle and other consultants.
• Tektronix took responsibility of business change while
consultants worked on the system details.
• For additional ManpowerTektronix hired contractors from otther
small firms.
Implementing OMAR at MBD
• More Complex Structure, large number of Products.
• CPID assembled products domestically and relied heavily on
local distribution centers, while MBD’s new business model
demanded direct shipment to end customers.
• Hired Oracle consultants at a very early stage.
• Extensive testing was done which delayed the project but
resulted in zero startup problems.
Implementing OMAR atVND
•Advantage:
• VND was the smallest of the three divisions atTektronix.
• The implementation team was in a position to benefit from all
the prior work that had been done in the other two divisions.
•Issues:
• The most complex products.
• Division was in the process of absorbing a recent acquisition.
Implementing OMAR atVND
•VND went for a rapid implementation.
•They were helped by their small size, since few people
needed training and few people could mount aggressive
resistance.
•In the end, the fast, high risk approach worked forVND.
•They were able to implement ERP quickly.
Global Rollout
• Taking the “wave“ approach to the international sites, starting
from Europe.
• Because implementation in Europe would address majority of
international implementation issues.
• Started with distribution center in Holland because everybody
used that.
• Implementation was successful.They were able to ship even more
quickly than before.
Global Rollout
• After Holland DC implementation, theTektronix team opted to
implement Oracle in pilot set of countries representing both EU
and Non-EU nations.
• This followed by big bang for the rest of the European countries
• Big bang implemented all three divisional systems together.
• After Europe, the American implementation adopted similar big
bang approach.
• For implementing in Asia/Pacific regionTektronix team first went
after English-speaking countries Singapore and India.
Global Rollout
• After this two countries they tackled the language difficulties in
Korea,Taiwan, and Hong Kong.
• The final country to be implemented was Australia, which had
older, mature business processes, and complex legacy systems
needing simplifications.
• The rollout covered 23 countries in less than 500 days.
Results
• Same day shipments in some divisions rose from 15% to 75%.
• Tektronix had visibility into business goods inventory regardless
of where the inventory was located
• Improved inventory turnover ratio.
• Employees satisfaction level increased.
Results cont…
• Improvement in data integration lead to drilling down of detail to
single account
• Better position to expand business.
• Company become more flexible to acquire new businesses.
• Time spend on data collection reduced from 90% to 10% and time
for analyzing

More Related Content

What's hot (20)

PPTX
Cisco System Inc. Implementing ERP
Vinay Gk
 
PPTX
L'oréal case - Globalisation of AMerican Beauty
ashwinkumarc100
 
PPTX
McKinsey & Company: Managing Knowledge and Learning
Disha Ghoshal
 
PPTX
Bi sysco
Nabduan Duangmanee
 
PPT
Zara: Fast Fashion
Burak Günbal
 
PPTX
Montreaux (1)
Bheemendra Narayan
 
PPTX
Siebel System: Anatomy of a Sale, Part 1
Anant Lodha
 
PPTX
Barilla Spa: A case on Supply Chain Integration
Himadri Singha
 
PPTX
Operations strategy at galanz
Gaurav Bisht
 
PPTX
Lego Outsourcing
Prasant Patro
 
DOC
207285085 classic-knitwear-case-study
homeworkping7
 
PPT
ingersoll rand
Tushar Arora
 
PPTX
The Microfridge Case
Karan Jaidka
 
PDF
Brand Differentiation through Customer Relationship Management - HBR Case review
Angga Kusumanegara
 
PDF
Zara : it for fast fashion
Akshay Borhade
 
PPTX
Apex corporation case study
Utkarsh Shivam
 
PPTX
Dell's Working Capital
Rohit Patidar
 
PPTX
Tektronics casestudy- ERP Implementation
Rachna Gupta
 
PPTX
Case study kulicke and soffa industries inc - group 4
Piyush Sogra
 
PPTX
Colgate vs P&G
Jeevan Rathod
 
Cisco System Inc. Implementing ERP
Vinay Gk
 
L'oréal case - Globalisation of AMerican Beauty
ashwinkumarc100
 
McKinsey & Company: Managing Knowledge and Learning
Disha Ghoshal
 
Zara: Fast Fashion
Burak Günbal
 
Montreaux (1)
Bheemendra Narayan
 
Siebel System: Anatomy of a Sale, Part 1
Anant Lodha
 
Barilla Spa: A case on Supply Chain Integration
Himadri Singha
 
Operations strategy at galanz
Gaurav Bisht
 
Lego Outsourcing
Prasant Patro
 
207285085 classic-knitwear-case-study
homeworkping7
 
ingersoll rand
Tushar Arora
 
The Microfridge Case
Karan Jaidka
 
Brand Differentiation through Customer Relationship Management - HBR Case review
Angga Kusumanegara
 
Zara : it for fast fashion
Akshay Borhade
 
Apex corporation case study
Utkarsh Shivam
 
Dell's Working Capital
Rohit Patidar
 
Tektronics casestudy- ERP Implementation
Rachna Gupta
 
Case study kulicke and soffa industries inc - group 4
Piyush Sogra
 
Colgate vs P&G
Jeevan Rathod
 

Similar to Tektronix : Global ERP Implementation (20)

DOC
Tektronix case study assignment
prasgopala
 
PPT
ERP - Implementation is The Challenge
vinaya.hs
 
PPTX
Chainsys proposal ki v1-28-feb-2013
Uppiliappan Gopalan
 
PPTX
Odoo ERP functional
مصعب محمد زكريا
 
PPTX
Group-4.case studyxpptxxxxxxxxxxxxxxxxxx
nguyenthanhnhan28
 
PDF
The erp experience
John Carne
 
DOCX
Oracle A.I.M. Methodology Documentation
runjithrocking
 
PDF
Mnod linsync10 oba
InSync Conference
 
PPTX
Success and Failure Examples of ERP Implementation
Sunidhi Kumari
 
PPTX
ERP in Detail
Rashmi Vaishya
 
PPT
ERP MODULES - Historical development details
Adrian Yap
 
PDF
Erp b
amitcdesai
 
PPTX
ERP Implementation at Cisco
Lavanya Sattiraju
 
PDF
Suiteworld Oracle & Netsuite: IDENT Oil & Gas Solution Case Study
IDENT Oil & Gas Signage
 
DOCX
IRCTC projects
Karan Kukreja
 
PDF
TIRTA ERP
Wildan Maulana
 
PPT
Erp case study
UMaine
 
PPT
Erp case study
UMaine
 
PDF
ctoforum
S K Goel
 
ODP
ERP 101 By Open Source ERP Guru
Yossi Ben Haroosh
 
Tektronix case study assignment
prasgopala
 
ERP - Implementation is The Challenge
vinaya.hs
 
Chainsys proposal ki v1-28-feb-2013
Uppiliappan Gopalan
 
Odoo ERP functional
مصعب محمد زكريا
 
Group-4.case studyxpptxxxxxxxxxxxxxxxxxx
nguyenthanhnhan28
 
The erp experience
John Carne
 
Oracle A.I.M. Methodology Documentation
runjithrocking
 
Mnod linsync10 oba
InSync Conference
 
Success and Failure Examples of ERP Implementation
Sunidhi Kumari
 
ERP in Detail
Rashmi Vaishya
 
ERP MODULES - Historical development details
Adrian Yap
 
Erp b
amitcdesai
 
ERP Implementation at Cisco
Lavanya Sattiraju
 
Suiteworld Oracle & Netsuite: IDENT Oil & Gas Solution Case Study
IDENT Oil & Gas Signage
 
IRCTC projects
Karan Kukreja
 
TIRTA ERP
Wildan Maulana
 
Erp case study
UMaine
 
Erp case study
UMaine
 
ctoforum
S K Goel
 
ERP 101 By Open Source ERP Guru
Yossi Ben Haroosh
 
Ad

Recently uploaded (20)

PDF
LAW OF CONTRACT ( 5 YEAR LLB & UNITARY LLB)- MODULE-3 - LEARN THROUGH PICTURE
APARNA T SHAIL KUMAR
 
PDF
People & Earth's Ecosystem -Lesson 2: People & Population
marvinnbustamante1
 
PPTX
Growth and development and milestones, factors
BHUVANESHWARI BADIGER
 
PPTX
How to Configure Access Rights of Manufacturing Orders in Odoo 18 Manufacturing
Celine George
 
PPTX
How to Create Rental Orders in Odoo 18 Rental
Celine George
 
PPTX
Stereochemistry-Optical Isomerism in organic compoundsptx
Tarannum Nadaf-Mansuri
 
PDF
LAW OF CONTRACT (5 YEAR LLB & UNITARY LLB )- MODULE - 1.& 2 - LEARN THROUGH P...
APARNA T SHAIL KUMAR
 
PDF
IMP NAAC-Reforms-Stakeholder-Consultation-Presentation-on-Draft-Metrics-Unive...
BHARTIWADEKAR
 
PPTX
Unit 2 COMMERCIAL BANKING, Corporate banking.pptx
AnubalaSuresh1
 
PPTX
How to Manage Large Scrollbar in Odoo 18 POS
Celine George
 
PDF
ARAL_Orientation_Day-2-Sessions_ARAL-Readung ARAL-Mathematics ARAL-Sciencev2.pdf
JoelVilloso1
 
PPTX
Views on Education of Indian Thinkers J.Krishnamurthy..pptx
ShrutiMahanta1
 
PDF
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - GLOBAL SUCCESS - CẢ NĂM - NĂM 2024 (VOCABULARY, ...
Nguyen Thanh Tu Collection
 
PPTX
A PPT on Alfred Lord Tennyson's Ulysses.
Beena E S
 
PDF
Dimensions of Societal Planning in Commonism
StefanMz
 
PPT
Talk on Critical Theory, Part II, Philosophy of Social Sciences
Soraj Hongladarom
 
PPTX
ASRB NET 2023 PREVIOUS YEAR QUESTION PAPER GENETICS AND PLANT BREEDING BY SAT...
Krashi Coaching
 
PDF
ARAL-Orientation_Morning-Session_Day-11.pdf
JoelVilloso1
 
PPTX
Capitol Doctoral Presentation -July 2025.pptx
CapitolTechU
 
PPTX
Gall bladder, Small intestine and Large intestine.pptx
rekhapositivity
 
LAW OF CONTRACT ( 5 YEAR LLB & UNITARY LLB)- MODULE-3 - LEARN THROUGH PICTURE
APARNA T SHAIL KUMAR
 
People & Earth's Ecosystem -Lesson 2: People & Population
marvinnbustamante1
 
Growth and development and milestones, factors
BHUVANESHWARI BADIGER
 
How to Configure Access Rights of Manufacturing Orders in Odoo 18 Manufacturing
Celine George
 
How to Create Rental Orders in Odoo 18 Rental
Celine George
 
Stereochemistry-Optical Isomerism in organic compoundsptx
Tarannum Nadaf-Mansuri
 
LAW OF CONTRACT (5 YEAR LLB & UNITARY LLB )- MODULE - 1.& 2 - LEARN THROUGH P...
APARNA T SHAIL KUMAR
 
IMP NAAC-Reforms-Stakeholder-Consultation-Presentation-on-Draft-Metrics-Unive...
BHARTIWADEKAR
 
Unit 2 COMMERCIAL BANKING, Corporate banking.pptx
AnubalaSuresh1
 
How to Manage Large Scrollbar in Odoo 18 POS
Celine George
 
ARAL_Orientation_Day-2-Sessions_ARAL-Readung ARAL-Mathematics ARAL-Sciencev2.pdf
JoelVilloso1
 
Views on Education of Indian Thinkers J.Krishnamurthy..pptx
ShrutiMahanta1
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - GLOBAL SUCCESS - CẢ NĂM - NĂM 2024 (VOCABULARY, ...
Nguyen Thanh Tu Collection
 
A PPT on Alfred Lord Tennyson's Ulysses.
Beena E S
 
Dimensions of Societal Planning in Commonism
StefanMz
 
Talk on Critical Theory, Part II, Philosophy of Social Sciences
Soraj Hongladarom
 
ASRB NET 2023 PREVIOUS YEAR QUESTION PAPER GENETICS AND PLANT BREEDING BY SAT...
Krashi Coaching
 
ARAL-Orientation_Morning-Session_Day-11.pdf
JoelVilloso1
 
Capitol Doctoral Presentation -July 2025.pptx
CapitolTechU
 
Gall bladder, Small intestine and Large intestine.pptx
rekhapositivity
 
Ad

Tektronix : Global ERP Implementation

  • 1. Tektronix, Inc.: Global ERP Implementation Presented by- Deven Sudame (131119) Harsh Asthana (131125) Harshita Singh (131126) Kamesh Joshi (131128) Manjary Agrawal (131130) MihirThakor (131131) Mradul Saraswat (131133)
  • 2. History • Founded in 1946 as electronic test equipment maker in Oregon. • Expanded into manufacturing electronic tool and devices • Business split: 1) Measurement Business Divison(MBD) 2) Color Printing and Imaging Division(CPID) 3)Video and Networking Division(VND) • Presence in 60 countries and a worldwide leader in Oscilloscope, television test measurement and monitoring equipment.
  • 3. Need for New IT system 1) Lack of integration and presence of incoordination of IT system. 2) Global competition was increasing 3) Financial performance was suffering • 460 legacy systems in US alone • No standardisation • Redundancy of order entry at multiple places • Chance of error • Incomplete and Inaccurate information
  • 4. MovingTowards ERP system • Neun (CFO) vision’s: “Frankfurt is Orlando” • Initiated by Roy Barker, President of CPID • Inability of existing system to support the division • CPID expansion plans: from niche market of graphics terminals in mainframes to mass market PC based customers • Easy justification for ERP implementation
  • 5. ExpandingTheVision Neun’s vision for the enterprise had 3 components • Separability of the businesses • Leveraging shared services • Staying as “plain vanilla” as possible
  • 6. Planning for ERP Selecting Software Project Organization & management Worldwide business model Project Schedule
  • 7. Selecting Software •Retain manufacturing package •Buy v/s Build •Single vendor ERP strategy to refrain from issues like • Maintenance • Integration • Upgradation •Choosing Oracle
  • 8. Worldwide business model •Steering committee • To develop a “Global business model” • To develop “Business practice changes and guiding principles” •Complex Architecture
  • 9. Business practice changes and guiding principles
  • 11. Project Organization and Management • Key roles like program manager, user leader, global leader, functional experts, power users, functional sub teams and test teams. • Combination of technical and functional strength to resolve issues. • Project headed by Carl Neun (CFO) – final arbiter and had complete authority on implementation. Also established a set of fundamentals. • Division presidents and Neun acted to resolve major project management problems.
  • 13. Project Schedule • Carl Neun believed scheduling much more important than budget. • A single change program consisting of many “waves”. • Waves were scheduled to deliver a specific functionality with feedback expected. • Also some flexibility in scheduling.
  • 14. Implementation • Split into five major sub-projects • First led by Gary Allen, IT Director – Finance and HR Systems, two through four led by divisional IT Directors consisting of OMAR projects and the final global rollout led by Gordon •Financials in parallel with OMAR in CPID division (first in US)
  • 15. Implementation - Financials •Goal to have single view of all financial information worldwide •Required a number of changes in business processes •Allow visibility of up-to-date information about financial status by standardizing charts- of-accounts and eliminating complexity
  • 16. Implementation – Financials (contd.) • Europe with larger changes Profit-center to a straight commission basis No supervisory duties but only administrative Change in financial transaction processes with single location i.e. Marlow, England • Single language and single measurement basis insideTektronix • Sales people using local language • Oracle package not satisfying all requirements
  • 17. Implementation Support • Small and large consulting firms as well as independent consultants • Aris Consulting specialized in Oracle implementations • Functional expert teamed with user and IT leads fromTektronix • For less functional and business expertise  lower cost technical consultants, developing interface between Oracle and manufacturing package  small firms • Cost reduction due to resell the interface to other companies
  • 18. Order Management/Accounts Receivables (OMAR) • Omar implementation was similar to financials in its approach, but different in execution. “PlainVanilla” implementation is not fully possible here because of following reasons : 1.Different business lines have different types of customers. 2.Oracle did not have some of the functionality required for OMAR. 3.Customer facing documents should be in local language. 4.Each country had slightly different legal language for official documents.
  • 19. Implementing OMAR at CPID • Natural choice – Favoring Management, build to order stock. • Initially launched in beta version and instability forced implementation team to spend months on debugging. • Initially Poor results by large consulting firm, later hired Aris, oracle and other consultants. • Tektronix took responsibility of business change while consultants worked on the system details. • For additional ManpowerTektronix hired contractors from otther small firms.
  • 20. Implementing OMAR at MBD • More Complex Structure, large number of Products. • CPID assembled products domestically and relied heavily on local distribution centers, while MBD’s new business model demanded direct shipment to end customers. • Hired Oracle consultants at a very early stage. • Extensive testing was done which delayed the project but resulted in zero startup problems.
  • 21. Implementing OMAR atVND •Advantage: • VND was the smallest of the three divisions atTektronix. • The implementation team was in a position to benefit from all the prior work that had been done in the other two divisions. •Issues: • The most complex products. • Division was in the process of absorbing a recent acquisition.
  • 22. Implementing OMAR atVND •VND went for a rapid implementation. •They were helped by their small size, since few people needed training and few people could mount aggressive resistance. •In the end, the fast, high risk approach worked forVND. •They were able to implement ERP quickly.
  • 23. Global Rollout • Taking the “wave“ approach to the international sites, starting from Europe. • Because implementation in Europe would address majority of international implementation issues. • Started with distribution center in Holland because everybody used that. • Implementation was successful.They were able to ship even more quickly than before.
  • 24. Global Rollout • After Holland DC implementation, theTektronix team opted to implement Oracle in pilot set of countries representing both EU and Non-EU nations. • This followed by big bang for the rest of the European countries • Big bang implemented all three divisional systems together. • After Europe, the American implementation adopted similar big bang approach. • For implementing in Asia/Pacific regionTektronix team first went after English-speaking countries Singapore and India.
  • 25. Global Rollout • After this two countries they tackled the language difficulties in Korea,Taiwan, and Hong Kong. • The final country to be implemented was Australia, which had older, mature business processes, and complex legacy systems needing simplifications. • The rollout covered 23 countries in less than 500 days.
  • 26. Results • Same day shipments in some divisions rose from 15% to 75%. • Tektronix had visibility into business goods inventory regardless of where the inventory was located • Improved inventory turnover ratio. • Employees satisfaction level increased.
  • 27. Results cont… • Improvement in data integration lead to drilling down of detail to single account • Better position to expand business. • Company become more flexible to acquire new businesses. • Time spend on data collection reduced from 90% to 10% and time for analyzing