www.webster-engineering.com Air Density Trim Control TM
Webster Engineering, a leader in burner manufacturing and combustion control, now offers a combustion air temperature trim system that should give you a 2-3% savings in your fuel bill.   With out the cost and complexity of a conventional O 2  trim system.  www.webster-engineering.com
Combustion Fuel to Air Ratio Burner Set-up A burner is set up to run efficiently by mixing the proper mass of fuel and the proper mass of air. www.webster-engineering.com Air Gas
Combustion Fuel to Air Ratio Burner Set-up www.webster-engineering.com Air Efficient ratio at 80 o  F Results in 3% O 2 Efficient mass of Gas to mass of Air White circle = Volume  Yellow circle = Mass This represents a normal set-up @ 80 degrees - trying to make the burner as efficient as possible. Gas
Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air  @ 80 o Ratio at 120 o  F Burner Fans Produce Constant Volume of Air Combustion Air Temperature  Changes Volume increases with higher temperature, but mass remains the same Same Air  @ 120 o Gas
Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air  @ 80 o Ratio at 120 o  F Results in 1.5% O 2 Burner Fans Produce Constant Volume of Air Combustion Air Temperature  Changes Volume stays the same with the burner fan, although the mass is reduced Constant volume -  reduced mass Gas
Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air  @ 80 o Ratio at 120 o  F Results in 1.5% O 2 Combustion Air Temperature  Changes Volume stays the same with the burner fan, although the mass is reduced Unburned fuel and high CO Constant volume -  reduced mass Gas
Combustion Fuel to Air Ratio Results in 3.0% O 2 www.webster-engineering.com Volume of Air  @ 80 o Ratio at 120 o  F Efficient operation The Temp A Trim Solution Increase fan RPM to maintain mass Gas
Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air  @ 80 o Ratio at 40 o  F Burner Fans Produce Constant Volume of Air Volume decreases with lower temperature, but mass remains the same Same Air  @ 40 o Gas
Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air  @ 80 o Ratio at 40 o  F Volume decreases with lower temperature, but mass remains the same Inefficient operation Same Air  @ 40 o Gas
Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air  @ 80 o Ratio at 40 o  F Efficient operation The Temp A Trim Solution Decrease fan RPM to maintain mass Gas
www.webster-engineering.com That’s what the   does.  It measures the combustion air temperature and adjusts the fan motor speed to maintain the correct mass of air.  Thus allowing you to set and hold an optimum excess air or O 2  level.
www.webster-engineering.com Typical Combustion Air Temperature Variations Date: 8/2/07 Date: 10/23/07 Site located in Winfield, Kansas  Dry Cleaners High Temp. = 121 F. Low Temp. = 58 F. Burner saw a 63 F temperature swing prior to the cold of winter.  TEMP A TRIM maintained a consistent O 2  reading.
www.webster-engineering.com System Layout TAT Circuit Board VFD Control Flame Safeguard  (existing) Motor / Blower Wheel  (existing) Air Flow Sensor
www.webster-engineering.com System Layout  Retro-Fit Application Components TAT circuit board / slave relay in separate enclosure Sensor (Thermistor) Variable frequency drive VFD display Conduit and wiring by field personnel.
www.webster-engineering.com System Layout  Retro-Fit Application TAT circuit board / slave relay in separate enclosure Original Burner control panel Sensor (thermistor) mounted at Burner air inlet Variable frequency drive VFD display TAT Board, sensor and VFD field wired Flame Safeguard
www.webster-engineering.com System Layout  New Application –  Burner Mount Panel Burner Flame Safeguard Variable frequency drive, mounted on outside of panel VFD display TAT circuit board / slave relay in Burner panel
www.webster-engineering.com System Layout  New Application –  Burner Mount Panel Sensor (Thermistor) Air Louver Box Air flow Burner panel Burner
www.webster-engineering.com System Layout  New Application –  Remote Mount Panel TAT circuit board / slave relay in own junction box TAT circuit board and sensor wiring by Webster Sensor (Thermistor) Variable frequency drive, mounted on outside of panel (mounted in field) VFD display Remote Control Panel Air Louver Box
www.webster-engineering.com System Layout  New Application –  Remote Mount Panel TAT circuit board / slave relay in own junction box TAT circuit board and sensor wiring by Webster
www.webster-engineering.com TEMP A TRIM Circuit Board
www.webster-engineering.com Thermistor Location Boiler room wall louvers Combustion Air Flow Cooler Air Cold Ambient Air The TEMP A TRIM Sensor should be located within the path between the boiler room louvers and the burner louver box. Sensor Warmer Air Warmer Air
www.webster-engineering.com Patent Pending Using  you get the following…………… An estimated fuel savings of up to 3% An efficiency gain of 1% or greater An electrical savings of up to 30% due to the reduced motor speed Reduced noise level due to reduced motor speed Reduced seasonal tune-ups
www.webster-engineering.com View a  video by visiting the Webster website: www.webster-engineering.com Click on  TEMP A TRIM  bar Ask your Representative about using the LogTag temperature recorder to measure the temperature swing in your boiler room.
www.webster-engineering.com LogTag Temperature Recorder Sample Graph from LogTag Readings
www.webster-engineering.com Payback Analysis TEMP A TRIM savings  2% $5,500 Recalculation of payback in years (with TEMP A TRIM) 1.66 Energy savings rebate (gas & electric company) $1,000 Recalculation of payback in years (with rebate) 1.56 % capacity utilization (average firing rate including off time) 33.7% % capacity utilization (based on running hours only) 60.1% Total savings per year (not including rebate) $15,686 % utilization based on 8760 operating hr/yr (56% on – 44% off) 56% Payback in years 2.36 Cost of new  burner & installation $24,000 Percent fuel savings 3.7% Total retrofit burner savings $10,187 Savings from reduced hysteresis & excess air $6,023 Maintenance savings from reduced cycling $887 Savings from On-OFF cycling losses $3,277
www.webster-engineering.com Air Density Trim Control Thank you for your time TM

More Related Content

PDF
210 MW BHEL Turbine Cycle Heat Balance
PPTX
210 mw turbine cycle heat rate
PDF
Power plant performance_efficiency
PDF
2013 ASME Power Conference Analysis of Turbine Cycle Performance, Operation a...
PDF
Cliffbergin
PDF
Residential house energy class a+
PDF
Alpha aire presentation web 0521
PDF
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
210 MW BHEL Turbine Cycle Heat Balance
210 mw turbine cycle heat rate
Power plant performance_efficiency
2013 ASME Power Conference Analysis of Turbine Cycle Performance, Operation a...
Cliffbergin
Residential house energy class a+
Alpha aire presentation web 0521
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE

What's hot (20)

PDF
A43010109
PDF
Fis CO Boiler Brochure
PDF
Hp heater ch-8.3
PPT
High Efficient Furnaces and Zoning
PDF
Performance and Optimization of Residential Condensing Combi Systems
PDF
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
PPT
210 mw turbine cycle heat rate
PDF
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
PPT
Misubishi eti and etw heat pump presentation may 4th, 2011 rev.1
PDF
Dc inverter heat pump blueway
PPTX
Air Source Heat Pumps - Thomas Dickson - Glow Worm
PPTX
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
PDF
Ticari Mutfaklar için Enerji Verimliliği Çözümleri
PDF
BAXI residential boilers brochure 2016
PDF
Radiant floor heat system
PPT
Mach High Efficiency Boilers
PPTX
Pallantzas 20150905 see_dpass_5_pillars
PDF
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
PDF
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
PPTX
Heat balance diagram
A43010109
Fis CO Boiler Brochure
Hp heater ch-8.3
High Efficient Furnaces and Zoning
Performance and Optimization of Residential Condensing Combi Systems
2003 ASME Power Conference Heat Balance Techniques for Diagnosing and Evaluat...
210 mw turbine cycle heat rate
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
Misubishi eti and etw heat pump presentation may 4th, 2011 rev.1
Dc inverter heat pump blueway
Air Source Heat Pumps - Thomas Dickson - Glow Worm
Thermal Efficiency of Buildings - Stefan Huber - Paul Heat Recovery Scotland
Ticari Mutfaklar için Enerji Verimliliği Çözümleri
BAXI residential boilers brochure 2016
Radiant floor heat system
Mach High Efficiency Boilers
Pallantzas 20150905 see_dpass_5_pillars
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Cea’s perspective on_energy_efficiency_in_thermal_power_generation_cea
Heat balance diagram
Ad

Similar to Temp A Trim Slides 2009 (20)

PPTX
An overview of diagnostic tools used in RESNET testing
PDF
HVAC Innovations in Light Commercial Rooftop Units
DOCX
GE Jebachers Gas Engine JGS620 technical specifications
PPT
Measuring And Controlling Energy Costs Mike Brumm Brumm Swine Consultancy Inc
PPT
Load Match Next Generation
PPTX
Furnace Improvement (FIS): Smart Stack Damper
TXT
197264747 104999991-aph-performance-improvements
PDF
Trane Airconditioning Clinic. Introduction to HVAC Systems.pdf
PPTX
Cooling system by Bhanupratap Niranjan IIT kanpur
PPTX
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
PPTX
Innovative compressed air case studies
PDF
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
PPT
Afcom air control solution presentation
PDF
Ersr y un50_00
PPTX
Gas turbine technology
PDF
Presentation mechanical car parking ventilation system
PDF
Presentation mechanical car parking ventilation system
PDF
02 hap-4 4-systems-CARRIER
An overview of diagnostic tools used in RESNET testing
HVAC Innovations in Light Commercial Rooftop Units
GE Jebachers Gas Engine JGS620 technical specifications
Measuring And Controlling Energy Costs Mike Brumm Brumm Swine Consultancy Inc
Load Match Next Generation
Furnace Improvement (FIS): Smart Stack Damper
197264747 104999991-aph-performance-improvements
Trane Airconditioning Clinic. Introduction to HVAC Systems.pdf
Cooling system by Bhanupratap Niranjan IIT kanpur
AIChE Smart Stack Damper Design Provides Better Control of Fired Heaters
Innovative compressed air case studies
4DES-7; R404A; t0 -5; tc 45.pdf for CS S
Afcom air control solution presentation
Ersr y un50_00
Gas turbine technology
Presentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation system
02 hap-4 4-systems-CARRIER
Ad

Recently uploaded (20)

PDF
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf
PDF
Build Real-Time ML Apps with Python, Feast & NoSQL
PDF
CXOs-Are-you-still-doing-manual-DevOps-in-the-age-of-AI.pdf
PDF
Electrocardiogram sequences data analytics and classification using unsupervi...
PDF
Advancing precision in air quality forecasting through machine learning integ...
PPTX
Module 1 Introduction to Web Programming .pptx
PPTX
Internet of Everything -Basic concepts details
PDF
LMS bot: enhanced learning management systems for improved student learning e...
PDF
zbrain.ai-Scope Key Metrics Configuration and Best Practices.pdf
PDF
SaaS reusability assessment using machine learning techniques
PDF
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
PPTX
agenticai-neweraofintelligence-250529192801-1b5e6870.pptx
PPTX
Build automations faster and more reliably with UiPath ScreenPlay
PDF
Human Computer Interaction Miterm Lesson
PDF
A hybrid framework for wild animal classification using fine-tuned DenseNet12...
PDF
Ensemble model-based arrhythmia classification with local interpretable model...
PDF
giants, standing on the shoulders of - by Daniel Stenberg
PDF
The-2025-Engineering-Revolution-AI-Quality-and-DevOps-Convergence.pdf
PPTX
MuleSoft-Compete-Deck for midddleware integrations
PDF
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf
The-Future-of-Automotive-Quality-is-Here-AI-Driven-Engineering.pdf
Build Real-Time ML Apps with Python, Feast & NoSQL
CXOs-Are-you-still-doing-manual-DevOps-in-the-age-of-AI.pdf
Electrocardiogram sequences data analytics and classification using unsupervi...
Advancing precision in air quality forecasting through machine learning integ...
Module 1 Introduction to Web Programming .pptx
Internet of Everything -Basic concepts details
LMS bot: enhanced learning management systems for improved student learning e...
zbrain.ai-Scope Key Metrics Configuration and Best Practices.pdf
SaaS reusability assessment using machine learning techniques
AI.gov: A Trojan Horse in the Age of Artificial Intelligence
agenticai-neweraofintelligence-250529192801-1b5e6870.pptx
Build automations faster and more reliably with UiPath ScreenPlay
Human Computer Interaction Miterm Lesson
A hybrid framework for wild animal classification using fine-tuned DenseNet12...
Ensemble model-based arrhythmia classification with local interpretable model...
giants, standing on the shoulders of - by Daniel Stenberg
The-2025-Engineering-Revolution-AI-Quality-and-DevOps-Convergence.pdf
MuleSoft-Compete-Deck for midddleware integrations
Transform-Your-Streaming-Platform-with-AI-Driven-Quality-Engineering.pdf

Temp A Trim Slides 2009

  • 2. Webster Engineering, a leader in burner manufacturing and combustion control, now offers a combustion air temperature trim system that should give you a 2-3% savings in your fuel bill. With out the cost and complexity of a conventional O 2 trim system. www.webster-engineering.com
  • 3. Combustion Fuel to Air Ratio Burner Set-up A burner is set up to run efficiently by mixing the proper mass of fuel and the proper mass of air. www.webster-engineering.com Air Gas
  • 4. Combustion Fuel to Air Ratio Burner Set-up www.webster-engineering.com Air Efficient ratio at 80 o F Results in 3% O 2 Efficient mass of Gas to mass of Air White circle = Volume Yellow circle = Mass This represents a normal set-up @ 80 degrees - trying to make the burner as efficient as possible. Gas
  • 5. Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air @ 80 o Ratio at 120 o F Burner Fans Produce Constant Volume of Air Combustion Air Temperature Changes Volume increases with higher temperature, but mass remains the same Same Air @ 120 o Gas
  • 6. Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air @ 80 o Ratio at 120 o F Results in 1.5% O 2 Burner Fans Produce Constant Volume of Air Combustion Air Temperature Changes Volume stays the same with the burner fan, although the mass is reduced Constant volume - reduced mass Gas
  • 7. Combustion Fuel to Air Ratio www.webster-engineering.com Volume of Air @ 80 o Ratio at 120 o F Results in 1.5% O 2 Combustion Air Temperature Changes Volume stays the same with the burner fan, although the mass is reduced Unburned fuel and high CO Constant volume - reduced mass Gas
  • 8. Combustion Fuel to Air Ratio Results in 3.0% O 2 www.webster-engineering.com Volume of Air @ 80 o Ratio at 120 o F Efficient operation The Temp A Trim Solution Increase fan RPM to maintain mass Gas
  • 9. Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air @ 80 o Ratio at 40 o F Burner Fans Produce Constant Volume of Air Volume decreases with lower temperature, but mass remains the same Same Air @ 40 o Gas
  • 10. Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air @ 80 o Ratio at 40 o F Volume decreases with lower temperature, but mass remains the same Inefficient operation Same Air @ 40 o Gas
  • 11. Combustion Fuel to Air Ratio Results in 4.5% O 2 www.webster-engineering.com Volume of Air @ 80 o Ratio at 40 o F Efficient operation The Temp A Trim Solution Decrease fan RPM to maintain mass Gas
  • 12. www.webster-engineering.com That’s what the does. It measures the combustion air temperature and adjusts the fan motor speed to maintain the correct mass of air. Thus allowing you to set and hold an optimum excess air or O 2 level.
  • 13. www.webster-engineering.com Typical Combustion Air Temperature Variations Date: 8/2/07 Date: 10/23/07 Site located in Winfield, Kansas Dry Cleaners High Temp. = 121 F. Low Temp. = 58 F. Burner saw a 63 F temperature swing prior to the cold of winter. TEMP A TRIM maintained a consistent O 2 reading.
  • 14. www.webster-engineering.com System Layout TAT Circuit Board VFD Control Flame Safeguard (existing) Motor / Blower Wheel (existing) Air Flow Sensor
  • 15. www.webster-engineering.com System Layout Retro-Fit Application Components TAT circuit board / slave relay in separate enclosure Sensor (Thermistor) Variable frequency drive VFD display Conduit and wiring by field personnel.
  • 16. www.webster-engineering.com System Layout Retro-Fit Application TAT circuit board / slave relay in separate enclosure Original Burner control panel Sensor (thermistor) mounted at Burner air inlet Variable frequency drive VFD display TAT Board, sensor and VFD field wired Flame Safeguard
  • 17. www.webster-engineering.com System Layout New Application – Burner Mount Panel Burner Flame Safeguard Variable frequency drive, mounted on outside of panel VFD display TAT circuit board / slave relay in Burner panel
  • 18. www.webster-engineering.com System Layout New Application – Burner Mount Panel Sensor (Thermistor) Air Louver Box Air flow Burner panel Burner
  • 19. www.webster-engineering.com System Layout New Application – Remote Mount Panel TAT circuit board / slave relay in own junction box TAT circuit board and sensor wiring by Webster Sensor (Thermistor) Variable frequency drive, mounted on outside of panel (mounted in field) VFD display Remote Control Panel Air Louver Box
  • 20. www.webster-engineering.com System Layout New Application – Remote Mount Panel TAT circuit board / slave relay in own junction box TAT circuit board and sensor wiring by Webster
  • 22. www.webster-engineering.com Thermistor Location Boiler room wall louvers Combustion Air Flow Cooler Air Cold Ambient Air The TEMP A TRIM Sensor should be located within the path between the boiler room louvers and the burner louver box. Sensor Warmer Air Warmer Air
  • 23. www.webster-engineering.com Patent Pending Using you get the following…………… An estimated fuel savings of up to 3% An efficiency gain of 1% or greater An electrical savings of up to 30% due to the reduced motor speed Reduced noise level due to reduced motor speed Reduced seasonal tune-ups
  • 24. www.webster-engineering.com View a video by visiting the Webster website: www.webster-engineering.com Click on TEMP A TRIM bar Ask your Representative about using the LogTag temperature recorder to measure the temperature swing in your boiler room.
  • 25. www.webster-engineering.com LogTag Temperature Recorder Sample Graph from LogTag Readings
  • 26. www.webster-engineering.com Payback Analysis TEMP A TRIM savings 2% $5,500 Recalculation of payback in years (with TEMP A TRIM) 1.66 Energy savings rebate (gas & electric company) $1,000 Recalculation of payback in years (with rebate) 1.56 % capacity utilization (average firing rate including off time) 33.7% % capacity utilization (based on running hours only) 60.1% Total savings per year (not including rebate) $15,686 % utilization based on 8760 operating hr/yr (56% on – 44% off) 56% Payback in years 2.36 Cost of new burner & installation $24,000 Percent fuel savings 3.7% Total retrofit burner savings $10,187 Savings from reduced hysteresis & excess air $6,023 Maintenance savings from reduced cycling $887 Savings from On-OFF cycling losses $3,277