Testing Life Cycle(TLC) Test plan preparation Test case design Test execution and Test Log preparation Defect Tracking Test report preparation
TLC Test Plan : A document that defines the overall    testing approach is called Test Plan. Test Case Design : Document that defines what is    selected to test,and describes the    expected result is called Test    Design.Set of procedures inorder to    find out the defects. Test Execution : Executing the test cases.
TLC Test log : Pass and fail information will be    stored in this test log. Defect tracking : All the failed items will come under    the defect tracking. (closing defect) Test report : Reports are generated during    the TLC.Final test summary report.  (generated at the end of testing for   making decisions)
Test Plan Preparation (manual) Test Objective  :  A test objective is simply a   testing “goal”.It is a statement of   what the tester is expected  to   perform during the testing activity.  Test strategy   : 1.   Techniques that are going to be used  during    the testing. 2. What types of tests must be conducted.   3. What stages of testing are    required.(e.g.unit,system)
Test Risk Analysis: A risk is a condition that can result in a loss.The risk that may occur/arise during the analysis of the testing. * The probability that the negative event      will occur.
Risk identified  - - - Unavailability of  resources - software hardware  etc . Mitigation plan  - - -  What are the ways  to overcome
Test schedule & Resources Task  Duration  Resource Test plan  3  1 Test design  5  3
Roles and Responsibilities Test Manager   - Manages the entire    testing activity (approve). Test leader   - Prepare the test plan, Review    test case, monitor defect    tracking and Reports    Preparation. Test Engineer  - Prepare test case design and   Daily reports.
Communications Approach The communications during the project  will be informed through this communication  approach.
Test Environment The Test Bed for the Testing Activity is identified. Like, * Software Requirements.   * hardware Requirements.
Automated Test Tools Identify which tools is used for each individual test Should know the test level criteria
Test Case Design (manual) Test case ID     : Sys_xyz_o1 Test case description   : A short note about    the testing. Test case procedure   : Each and every step    has to be mentioned    in test case    procedure. Test inputs (or) Test Data  : Input data
Expected result : The Expected out come of the test case.   Test Execution Actual result   : What we have received is the actual result. Expected result = Actual result  then the test is pass otherwise it is fail.
Test Log *  Failed test case are going to be the defects Fail dfgdfg Sys_xyz_01 Pass hgfhgfh Sys_xyz_02 Test status/Result Test Case Description Test Case ID
Defect Tracking All the failed test execution/defects  will come under the defect tracking. Defect Tracking Contains : Defect Id  : Sys_def_xyz_o1 Test case Id   : Sys_xyz_o1
Defect Tracking Defect Description  : Specify the defect. Defect Recovery procedure :   Repeating the same test cases with some modifications.
Defect Status The Current Status of the defects New Open Fixed Reopen Closed Rejected
Defects Severity Critical Major Minor
Defect Classification Defects that affect limited areas of functionality that either can be worked around or ignored Minor/Trivial Major functions disabled or incorrect Non-conformance to standards Defects that cause incorrect behavior with known workaround Important areas of the system are affected which would not cause operational failure Major System inoperable Implementation that does not meet the requirement Defects that may cause the system to hang, crash, produce incorrect or unexpected behavior, corrupt user data with no work around  Critical
Defects Priority High Moderate Low

More Related Content

PPSX
Manual testing
Vivek V
 
PPT
TESTING LIFE CYCLE PPT
suhasreddy1
 
PPTX
Istqb foundation level day 1
Shuchi Singla AKT,SPC4,PMI-ACP,ITIL(F),CP-AAT
 
PPTX
ISTQB Agile Extension
Davis Thomas
 
PPTX
Software Testing Life Cycle – A Beginner’s Guide
Syed Hassan Raza
 
PPSX
Agile vs Iterative vs Waterfall models
Marraju Bollapragada V
 
PPT
Manual testing concepts course 1
Raghu Kiran
 
PPTX
Product Backlog Mapping
Paul Nil
 
Manual testing
Vivek V
 
TESTING LIFE CYCLE PPT
suhasreddy1
 
Istqb foundation level day 1
Shuchi Singla AKT,SPC4,PMI-ACP,ITIL(F),CP-AAT
 
ISTQB Agile Extension
Davis Thomas
 
Software Testing Life Cycle – A Beginner’s Guide
Syed Hassan Raza
 
Agile vs Iterative vs Waterfall models
Marraju Bollapragada V
 
Manual testing concepts course 1
Raghu Kiran
 
Product Backlog Mapping
Paul Nil
 

What's hot (20)

PPTX
Mistake proofing for web1
vedzen1234
 
PPTX
CTFL chapter 06
Davis Thomas
 
PPT
Agile testing
Yogita patil
 
PPTX
defect tracking and management
Manish Chaurasia
 
PPT
Risk management in software engineering
deep sharma
 
PPTX
Agile Testing - presentation for Agile User Group
suwalki24.pl
 
PPTX
AGILE Model (SDLC).pptx
MahithDias
 
PPTX
CTFL Module 01
Davis Thomas
 
PPT
Test case development
Hrushikesh Wakhle
 
PPT
Software Quality Management
Krishna Sujeer
 
PPTX
Test case techniques
Pina Parmar
 
PPT
Software Testing Life Cycle
Udayakumar Sree
 
PPTX
Chapter 1 - Fundamentals of Testing
Neeraj Kumar Singh
 
PPT
Testing in Agile Projects
sriks7
 
PPTX
Software testing and process
gouravkalbalia
 
PPSX
Fmea Presentation 2
Subikash Roy
 
PPTX
Software testing & Quality Assurance
Webtech Learning
 
DOCX
Software development engineer performance appraisal
MartinRay456
 
PDF
Chapter 4 - Defect Management
Neeraj Kumar Singh
 
PPTX
A Research Study on importance of Testing and Quality Assurance in Software D...
Sehrish Asif
 
Mistake proofing for web1
vedzen1234
 
CTFL chapter 06
Davis Thomas
 
Agile testing
Yogita patil
 
defect tracking and management
Manish Chaurasia
 
Risk management in software engineering
deep sharma
 
Agile Testing - presentation for Agile User Group
suwalki24.pl
 
AGILE Model (SDLC).pptx
MahithDias
 
CTFL Module 01
Davis Thomas
 
Test case development
Hrushikesh Wakhle
 
Software Quality Management
Krishna Sujeer
 
Test case techniques
Pina Parmar
 
Software Testing Life Cycle
Udayakumar Sree
 
Chapter 1 - Fundamentals of Testing
Neeraj Kumar Singh
 
Testing in Agile Projects
sriks7
 
Software testing and process
gouravkalbalia
 
Fmea Presentation 2
Subikash Roy
 
Software testing & Quality Assurance
Webtech Learning
 
Software development engineer performance appraisal
MartinRay456
 
Chapter 4 - Defect Management
Neeraj Kumar Singh
 
A Research Study on importance of Testing and Quality Assurance in Software D...
Sehrish Asif
 
Ad

Similar to Test Life Cycle - Manual Testing Concept. (20)

PPTX
Fundamentals of software testing
Transpose Solutions Inc
 
PPTX
Chapter 1 Fundamental of testing ISTQB v4
LinhNguye
 
PPT
Chap1 Istqb presentation Foundation level in QA
sree23411
 
PPT
Test planning
rahulcentra
 
PDF
Fundamentals of Software Testing
Sagar Joshi
 
DOCX
stlc
transformtoit
 
DOCX
stlc
transformtoit
 
PPTX
ISTQB Test Process
HoangThiHien1
 
PPT
ISTQB, ISEB Lecture Notes
onsoftwaretest
 
PPTX
chapter-no-4-test-management fudhg ddh j
AmitDeshai
 
PDF
ISTQB CTAL - Test Analyst
Samer Desouky
 
DOC
Question ISTQB foundation 3
Jenny Nguyen
 
DOC
Ôn tập kiến thức ISTQB
Jenny Nguyen
 
PPT
ISTQB / ISEB Foundation Exam Practice -1
Yogindernath Gupta
 
PDF
L software testing
Fáber D. Giraldo
 
PPTX
Test Plan.pptx
ChetanJadhav81
 
PPTX
Qa documentation pp
Bohdana Shaleva
 
PDF
Test process
Soori Joy
 
PPTX
Strategies For Software Test Documentation
Vishwak Solution
 
Fundamentals of software testing
Transpose Solutions Inc
 
Chapter 1 Fundamental of testing ISTQB v4
LinhNguye
 
Chap1 Istqb presentation Foundation level in QA
sree23411
 
Test planning
rahulcentra
 
Fundamentals of Software Testing
Sagar Joshi
 
ISTQB Test Process
HoangThiHien1
 
ISTQB, ISEB Lecture Notes
onsoftwaretest
 
chapter-no-4-test-management fudhg ddh j
AmitDeshai
 
ISTQB CTAL - Test Analyst
Samer Desouky
 
Question ISTQB foundation 3
Jenny Nguyen
 
Ôn tập kiến thức ISTQB
Jenny Nguyen
 
ISTQB / ISEB Foundation Exam Practice -1
Yogindernath Gupta
 
L software testing
Fáber D. Giraldo
 
Test Plan.pptx
ChetanJadhav81
 
Qa documentation pp
Bohdana Shaleva
 
Test process
Soori Joy
 
Strategies For Software Test Documentation
Vishwak Solution
 
Ad

Recently uploaded (20)

PDF
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
 
PPTX
Agile Chennai 18-19 July 2025 Ideathon | AI Powered Microfinance Literacy Gui...
AgileNetwork
 
PDF
Economic Impact of Data Centres to the Malaysian Economy
flintglobalapac
 
PDF
Structs to JSON: How Go Powers REST APIs
Emily Achieng
 
PDF
Responsible AI and AI Ethics - By Sylvester Ebhonu
Sylvester Ebhonu
 
PDF
Oracle AI Vector Search- Getting Started and what's new in 2025- AIOUG Yatra ...
Sandesh Rao
 
PDF
How Open Source Changed My Career by abdelrahman ismail
a0m0rajab1
 
PPTX
New ThousandEyes Product Innovations: Cisco Live June 2025
ThousandEyes
 
PDF
Presentation about Hardware and Software in Computer
snehamodhawadiya
 
PDF
Research-Fundamentals-and-Topic-Development.pdf
ayesha butalia
 
PDF
A Strategic Analysis of the MVNO Wave in Emerging Markets.pdf
IPLOOK Networks
 
PDF
The Future of Artificial Intelligence (AI)
Mukul
 
PDF
MASTERDECK GRAPHSUMMIT SYDNEY (Public).pdf
Neo4j
 
PPTX
IT Runs Better with ThousandEyes AI-driven Assurance
ThousandEyes
 
PDF
Software Development Methodologies in 2025
KodekX
 
PPTX
Applied-Statistics-Mastering-Data-Driven-Decisions.pptx
parmaryashparmaryash
 
PPTX
cloud computing vai.pptx for the project
vaibhavdobariyal79
 
PDF
Tea4chat - another LLM Project by Kerem Atam
a0m0rajab1
 
PDF
Trying to figure out MCP by actually building an app from scratch with open s...
Julien SIMON
 
PDF
AI Unleashed - Shaping the Future -Starting Today - AIOUG Yatra 2025 - For Co...
Sandesh Rao
 
Using Anchore and DefectDojo to Stand Up Your DevSecOps Function
Anchore
 
Agile Chennai 18-19 July 2025 Ideathon | AI Powered Microfinance Literacy Gui...
AgileNetwork
 
Economic Impact of Data Centres to the Malaysian Economy
flintglobalapac
 
Structs to JSON: How Go Powers REST APIs
Emily Achieng
 
Responsible AI and AI Ethics - By Sylvester Ebhonu
Sylvester Ebhonu
 
Oracle AI Vector Search- Getting Started and what's new in 2025- AIOUG Yatra ...
Sandesh Rao
 
How Open Source Changed My Career by abdelrahman ismail
a0m0rajab1
 
New ThousandEyes Product Innovations: Cisco Live June 2025
ThousandEyes
 
Presentation about Hardware and Software in Computer
snehamodhawadiya
 
Research-Fundamentals-and-Topic-Development.pdf
ayesha butalia
 
A Strategic Analysis of the MVNO Wave in Emerging Markets.pdf
IPLOOK Networks
 
The Future of Artificial Intelligence (AI)
Mukul
 
MASTERDECK GRAPHSUMMIT SYDNEY (Public).pdf
Neo4j
 
IT Runs Better with ThousandEyes AI-driven Assurance
ThousandEyes
 
Software Development Methodologies in 2025
KodekX
 
Applied-Statistics-Mastering-Data-Driven-Decisions.pptx
parmaryashparmaryash
 
cloud computing vai.pptx for the project
vaibhavdobariyal79
 
Tea4chat - another LLM Project by Kerem Atam
a0m0rajab1
 
Trying to figure out MCP by actually building an app from scratch with open s...
Julien SIMON
 
AI Unleashed - Shaping the Future -Starting Today - AIOUG Yatra 2025 - For Co...
Sandesh Rao
 

Test Life Cycle - Manual Testing Concept.

  • 1. Testing Life Cycle(TLC) Test plan preparation Test case design Test execution and Test Log preparation Defect Tracking Test report preparation
  • 2. TLC Test Plan : A document that defines the overall testing approach is called Test Plan. Test Case Design : Document that defines what is selected to test,and describes the expected result is called Test Design.Set of procedures inorder to find out the defects. Test Execution : Executing the test cases.
  • 3. TLC Test log : Pass and fail information will be stored in this test log. Defect tracking : All the failed items will come under the defect tracking. (closing defect) Test report : Reports are generated during the TLC.Final test summary report. (generated at the end of testing for making decisions)
  • 4. Test Plan Preparation (manual) Test Objective : A test objective is simply a testing “goal”.It is a statement of what the tester is expected to perform during the testing activity. Test strategy : 1. Techniques that are going to be used during the testing. 2. What types of tests must be conducted. 3. What stages of testing are required.(e.g.unit,system)
  • 5. Test Risk Analysis: A risk is a condition that can result in a loss.The risk that may occur/arise during the analysis of the testing. * The probability that the negative event will occur.
  • 6. Risk identified - - - Unavailability of resources - software hardware etc . Mitigation plan - - - What are the ways to overcome
  • 7. Test schedule & Resources Task Duration Resource Test plan 3 1 Test design 5 3
  • 8. Roles and Responsibilities Test Manager - Manages the entire testing activity (approve). Test leader - Prepare the test plan, Review test case, monitor defect tracking and Reports Preparation. Test Engineer - Prepare test case design and Daily reports.
  • 9. Communications Approach The communications during the project will be informed through this communication approach.
  • 10. Test Environment The Test Bed for the Testing Activity is identified. Like, * Software Requirements. * hardware Requirements.
  • 11. Automated Test Tools Identify which tools is used for each individual test Should know the test level criteria
  • 12. Test Case Design (manual) Test case ID : Sys_xyz_o1 Test case description : A short note about the testing. Test case procedure : Each and every step has to be mentioned in test case procedure. Test inputs (or) Test Data : Input data
  • 13. Expected result : The Expected out come of the test case. Test Execution Actual result : What we have received is the actual result. Expected result = Actual result then the test is pass otherwise it is fail.
  • 14. Test Log * Failed test case are going to be the defects Fail dfgdfg Sys_xyz_01 Pass hgfhgfh Sys_xyz_02 Test status/Result Test Case Description Test Case ID
  • 15. Defect Tracking All the failed test execution/defects will come under the defect tracking. Defect Tracking Contains : Defect Id : Sys_def_xyz_o1 Test case Id : Sys_xyz_o1
  • 16. Defect Tracking Defect Description : Specify the defect. Defect Recovery procedure : Repeating the same test cases with some modifications.
  • 17. Defect Status The Current Status of the defects New Open Fixed Reopen Closed Rejected
  • 19. Defect Classification Defects that affect limited areas of functionality that either can be worked around or ignored Minor/Trivial Major functions disabled or incorrect Non-conformance to standards Defects that cause incorrect behavior with known workaround Important areas of the system are affected which would not cause operational failure Major System inoperable Implementation that does not meet the requirement Defects that may cause the system to hang, crash, produce incorrect or unexpected behavior, corrupt user data with no work around Critical
  • 20. Defects Priority High Moderate Low