TESTING &
MAINTENANCE OF
TRANSFORMER
PRESENTED BY:
SMRITI KESHARWANI
ASST PROF.
DEPARTMENT OF ELECTRICAL ENGINEERING
DR C V RAMAN UNIVERSITY, KOTA C.G.
TESTING OF TRANSFORMER
• TESTING IS CARRIED OUT AS PER IS-2026.
• ROUTINE , TYPE TESTS & SPECIAL TESTS
• ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB)
• 1.Measurement of winding resistance
• 2.Measurement of insulation resistance
• 3.Seperate source voltage withstand test (High Voltage tests on HV & LV)
• 4.Induced Over voltage Withstand test (DVDF test)
• 5.Measurement of voltage ratio
• 6.Measurement of NO LOAD LOSS & current.
• 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY &
REGULATION)
• 8.Vector Group Verification
• 9.Oil BDV test.
• 10.Tests on OLTC (if Attached)
THESE TESTS ARE CARRIED OUT ONLY ON
ONE TRANSFORMER OF THE LOT.
 All routine tests
 Type tests
1. Lightening Impulse test.
2. Temperature rise test
 Additional Impulse test
 Short circuit test
 Measurement of zero Phase sequence Impedance test.
 Measurement of acoustic noise level.
 Measurement of harmonics of the no load current.
 Magnetic balance test.
1.MEASUREMENT OF WINDING RESISTANCE
This test measures the resistance of the HV & LV
winding. The values of resistance should be balance
for all three phases and should match the designed
values.
Equipment used : Digital resistance meter.
2.MEASUREMENT OF INSULATION RESISTANCE
Measures the insulation resistance of HV & LV
windings with respect to earth (body) and between LV
& HV winding.
INSULATION TESTER OR MEGGER IS USED.
Recommended Values are
2000Mohms for HV & 500 Mohms for LV.
3.SEPERATE SOURCE VOLTAGE WITHSTAND TEST (High
Voltage tests on HV & LV)-
This test checks the insulation property between Primary to earth,
Secondary to earth and between Primary & Secondary.
HV high voltage test : LV winding connected together and earthed.
HV winding connected together and given 28 KV ( for 11KV
transformer) for 1 minute.
LV high Voltage test : HV winding connected together and earthed. LV
winding connected together and given 3 KV for 1 minute.
Equipment used : High Voltage tester ( 100KV & 3KV)
Testing of transformer
4.INDUCED OVER VOLTAGE WITHSTAND TEST
(DVDF TEST)- This test checks the inter turn
insulation.
For a 11KV/433V transformer,866 Volts are applied
at the 433V winding with the help of a Generator for
1 minute. This induces 22KV on 11KV side. The
frequency of the 866V supply is also increased to
100HZ.
Equipment used : MOTOR GENERATOR SET
Testing of transformer
5.MEASUREMENT OF VOLTAGE RATIO
This test measures the voltage ratio as per the
customer’s requirement.
V1/V2 = N1/N2
The voltage ratio is equal to the turns ratio in a
transformer. Using this principle, the turns ratio is
measured with the help of a turns ratio meter. If it is
correct , then the voltage ratio is assumed to be
correct.
Equipment used : Turns Ratiometer
6.MEASUREMENT OF NO LOAD LOSS & CURRENT-
The iron losses and no load current are measured in
this test. The 433V winding is charged at 433V
supply & the 11KV winding is left open .The power
consumed by the transformer at no load is the no load
loss in the transformer.
Effect of actual frequency must be taken into account.
Equipment used : Watt meters or power analyzer.
7.MEASUREMENT OF LOAD LOSS &
IMPEDENCE.(EFFICIENCY & REGULATION)
This test measures the power consumed by the
transformer when the 433V winding is short circuited
and The rated current is passed through the 11KV
winding.
Equipment used : Wattmeters or power analyzer.
Testing of transformer
8.VECTOR GROUP VERIFICATION TEST
This test verifies the Dyn-11 vector group of a
distribution transformer.
Equipment used : voltmeter.
Testing of transformer
 Oil BDV TEST.
Oil breakdown voltage is checked as per IS-335.
100 mm L X 70 mm B X 80 mm Ht. glass pot.
500ml Oil sample.
Spherical electrodes with gap of 2.5 mm
Recommended value : 60KV
Equipment used : OIL BDV TEST SET.
LIGHTENING IMPULSE TEST
 All the dielectric tests check the insulation level of the job.
 Impulse generator is used to produce the specified voltage
impulse wave of 1.2/50 micro seconds wave
 One impulse of a reduced voltage between 50 to 75% of the
full test voltage and subsequent three impulses at full voltage.
 For a three phase transformer, impulse is carried out on all
three phases in succession.
 The voltage is applied on each of the line terminal in
succession, keeping the other terminals earthed.
 The current and voltage wave shapes are recorded on the
oscilloscope and any distortion in the wave shape is the criteria
for failure.
Testing of transformer
SHORT CIRCUIT WITHSTAND ABILITY TEST-
 This tests measures the ability of the transformer to withstand
the mechanical and thermal stresses caused by the external
short circuit.
 HV terminals are connected to the supply bus of the testing
plant. The LV is short circuited. The testing plant parameters
are such adjusted to give the rated short circuit current.
 Supply is made on and closed after specified duration of short
circuit. The record of current wave form is noted.
 There should not be any mechanical distortion, fire to the
transformer during this test. Similarly no wave form
distortion. The transformer should also withstand the routine
tests after the short circuit test.
 The reactance of the winding measured before and after the
S.C. test should not vary beyond the limits stated in the
IS2026.
 Transformer is the heart of any power system.
Hence preventive maintenance is always cost
effective and time saving. Any failure to the
transformer can extremely affect the whole
functioning of the organization.
 OIL :
1. Oil level checking. Leakages to be attended.
2. Oil BDV & acidity checking at regular intervals.
If acidity is between 0.5 to 1mg KOH, oil should
be kept under observation.
3. BDV, Color and smell of oil are indicative.
1. Sludge, dust, dirt ,moisture can be removed by
filtration.
2. Oil when topped up shall be of the same make. It
may lead to sludge formation and acidic contents.
 Insulation resistance of the transformer should be
checked once in 6 months.
 Megger values along with oil values indicate the
condition of transformer.
 Periodic Dissolved Gas Analysis can be carried out.
 BUSHINGS
Bushings should be cleaned and inspected for any cracks.
Dust & dirt deposition, Salt or chemical deposition,
cement or acid fumes depositions should be carefully
noted and rectified.
 Periodic checking of any loose connections of the
terminations of HV & LV side.
 Breather examination. Dehydration of Silica gel if
necessary.
 Explosion vent diaphragm examination.
 Conservator to be cleaned from inside after every
three years.
 Regular inspection of OIL & WINDING
TEMPERATURE METER readings.
 Cleanliness in the Substation yard with all nets, vines,
shrubs removed.
 The best way of protecting a transformer is to have
good preventive maintenance schedule.
 Oil Temperature Indicators.
 Winding Temperature indicators.
 Buchholz Relay.
 Magnetic Oil level Gauge.
 Explosion Vent.
 HT fuse & D.O. fuse.
 LT circuit breaker.
 HT Circuit breaker with Over load, Earth Fault relay
tripping.
 Oil Surge Relay for OLTC.
 PRV for OLTC.
 HORN GAPS & Lightening Arrestor.
 Breather.
 Insufficient Oil level.
 Seepage of water in oil.
 Prolonged Over loading.
 Single Phase loading.
 Unbalanced loading.
 Faulty Termination (Improper sized lugs etc)
 Power Theft.
 Prolonged Short Circuit.
 Faulty operation of tap changer switch.
 Lack of installation checks.
 Faulty design
 Bad Quality of raw material.
 Transit damaged transformers.
 After failure , transformer is removed and replaced
with new/repaired one without removing the cause of
failure which results in immediate or short time failure.
Testing of transformer

More Related Content

PDF
Transformer testing
PPTX
Transformer maintenance
PDF
Testing of transformer
PDF
Testing of Transformers.
PDF
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
PPT
Testing,maintenance&protection
PPT
Operation and maintenance of transformer
PPTX
Ppt on protection of power transformers
Transformer testing
Transformer maintenance
Testing of transformer
Testing of Transformers.
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
Testing,maintenance&protection
Operation and maintenance of transformer
Ppt on protection of power transformers

What's hot (20)

PPT
POWER SYSTEM PROTECTION
PPT
Transformer basic
PPTX
Substation protection devices
PPT
Transformer
PPT
Testing and Condition Monitoring of Substation Equipments
PDF
Transformer protection
PDF
Three phase transformer ( vector groups)
PPTX
presentation on substation layout and BUS bar arrangement.
PPTX
Switchgear - complete guide
PDF
Introduction to mv switchgear
PPTX
Power Transformer Protection
PPTX
Faults on Power System
PPTX
Types of relay
PPTX
Megger
PPTX
Presentation on substations
PDF
Substation Maintenance
PDF
Chapter 02- Breakdown in liquid dielectrics
PDF
Alternator protection
PPSX
Substations
POWER SYSTEM PROTECTION
Transformer basic
Substation protection devices
Transformer
Testing and Condition Monitoring of Substation Equipments
Transformer protection
Three phase transformer ( vector groups)
presentation on substation layout and BUS bar arrangement.
Switchgear - complete guide
Introduction to mv switchgear
Power Transformer Protection
Faults on Power System
Types of relay
Megger
Presentation on substations
Substation Maintenance
Chapter 02- Breakdown in liquid dielectrics
Alternator protection
Substations
Ad

Viewers also liked (20)

PDF
Transformer Maintenance and Testing
PPTX
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
PPSX
Electrical maintenance-1
PPT
Electrical maintenance fundamentals
PPT
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
PPTX
open circuit and short circuit test on transformer
PPTX
Transformer construction,types and working
PDF
Best transformer-test-procedures-en
PPTX
transformer ppt
PPT
Sc and oc test on transformer
PPT
Transformer
PDF
Maitenance of transformer
PPTX
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
DOC
151706423 maintenance-and-troubleshooting-of-electric-motors
PPTX
transformer
PPT
Installation, Testing and Troubleshooting of Transformers
PDF
Transformer 2
PDF
Armature & field coil inspection
PDF
Why dehydration of transformer oil is important?
PDF
Transformer oil
Transformer Maintenance and Testing
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Electrical maintenance-1
Electrical maintenance fundamentals
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
open circuit and short circuit test on transformer
Transformer construction,types and working
Best transformer-test-procedures-en
transformer ppt
Sc and oc test on transformer
Transformer
Maitenance of transformer
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
151706423 maintenance-and-troubleshooting-of-electric-motors
transformer
Installation, Testing and Troubleshooting of Transformers
Transformer 2
Armature & field coil inspection
Why dehydration of transformer oil is important?
Transformer oil
Ad

Similar to Testing of transformer (20)

PPT
TESTING,MAINTENANCE&PROTECTION.ppt
PPT
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
PPT
TESTING,MAINTENANCE&PROTECTION.ppt
PPTX
Testing, Maintenace and Protection of Transformer.pptx
PPS
Distribution Transformer testing, West Bengal, India
PPTX
Testing of transformer.pptx
PDF
Chapter 5 mukesh gurjar
PDF
Power transformer testing and commissioning guidelines r
PPTX
Unit 1-2-b
PPTX
1 MVA TRANSFORMER-compressed tranformrr.pptx
PPTX
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
PPTX
Transformer ppt.
PDF
REPORT -VALLUR THERMAL POWER PLANT
PPT
6. Factory Acceptance Tests transformer.ppt
PPT
PROTECTIVE DEVICES & MAINTENANCE.ppt
PPT
Transformers pptxx.ppt
PPT
transformers.ppt
PPTX
220kv grid wapda town lahore
PPTX
MSC SOW
PPT
Installation Operation & Maintenance of 33kV & 11kV Switchgear
TESTING,MAINTENANCE&PROTECTION.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
Testing, Maintenace and Protection of Transformer.pptx
Distribution Transformer testing, West Bengal, India
Testing of transformer.pptx
Chapter 5 mukesh gurjar
Power transformer testing and commissioning guidelines r
Unit 1-2-b
1 MVA TRANSFORMER-compressed tranformrr.pptx
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
Transformer ppt.
REPORT -VALLUR THERMAL POWER PLANT
6. Factory Acceptance Tests transformer.ppt
PROTECTIVE DEVICES & MAINTENANCE.ppt
Transformers pptxx.ppt
transformers.ppt
220kv grid wapda town lahore
MSC SOW
Installation Operation & Maintenance of 33kV & 11kV Switchgear

Recently uploaded (20)

PDF
Computer System Architecture 3rd Edition-M Morris Mano.pdf
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PDF
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PDF
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PDF
Present and Future of Systems Engineering: Air Combat Systems
PDF
Unit1 - AIML Chapter 1 concept and ethics
PPTX
wireless networks, mobile computing.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
PRASUNET_20240614003_231416_0000[1].pptx
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
DOC
T Pandian CV Madurai pandi kokkaf illaya
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Software Engineering and software moduleing
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PDF
Introduction to Power System StabilityPS
PDF
Beginners-Guide-to-Artificial-Intelligence.pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
Computer System Architecture 3rd Edition-M Morris Mano.pdf
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
20250617 - IR - Global Guide for HR - 51 pages.pdf
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Present and Future of Systems Engineering: Air Combat Systems
Unit1 - AIML Chapter 1 concept and ethics
wireless networks, mobile computing.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PRASUNET_20240614003_231416_0000[1].pptx
MLpara ingenieira CIVIL, meca Y AMBIENTAL
T Pandian CV Madurai pandi kokkaf illaya
Management Information system : MIS-e-Business Systems.pptx
Software Engineering and software moduleing
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Introduction to Power System StabilityPS
Beginners-Guide-to-Artificial-Intelligence.pdf
Exploratory_Data_Analysis_Fundamentals.pdf

Testing of transformer

  • 1. TESTING & MAINTENANCE OF TRANSFORMER PRESENTED BY: SMRITI KESHARWANI ASST PROF. DEPARTMENT OF ELECTRICAL ENGINEERING DR C V RAMAN UNIVERSITY, KOTA C.G.
  • 2. TESTING OF TRANSFORMER • TESTING IS CARRIED OUT AS PER IS-2026. • ROUTINE , TYPE TESTS & SPECIAL TESTS • ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB) • 1.Measurement of winding resistance • 2.Measurement of insulation resistance • 3.Seperate source voltage withstand test (High Voltage tests on HV & LV) • 4.Induced Over voltage Withstand test (DVDF test) • 5.Measurement of voltage ratio • 6.Measurement of NO LOAD LOSS & current. • 7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) • 8.Vector Group Verification • 9.Oil BDV test. • 10.Tests on OLTC (if Attached)
  • 3. THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT.  All routine tests  Type tests 1. Lightening Impulse test. 2. Temperature rise test
  • 4.  Additional Impulse test  Short circuit test  Measurement of zero Phase sequence Impedance test.  Measurement of acoustic noise level.  Measurement of harmonics of the no load current.  Magnetic balance test.
  • 5. 1.MEASUREMENT OF WINDING RESISTANCE This test measures the resistance of the HV & LV winding. The values of resistance should be balance for all three phases and should match the designed values. Equipment used : Digital resistance meter.
  • 6. 2.MEASUREMENT OF INSULATION RESISTANCE Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding. INSULATION TESTER OR MEGGER IS USED. Recommended Values are 2000Mohms for HV & 500 Mohms for LV.
  • 7. 3.SEPERATE SOURCE VOLTAGE WITHSTAND TEST (High Voltage tests on HV & LV)- This test checks the insulation property between Primary to earth, Secondary to earth and between Primary & Secondary. HV high voltage test : LV winding connected together and earthed. HV winding connected together and given 28 KV ( for 11KV transformer) for 1 minute. LV high Voltage test : HV winding connected together and earthed. LV winding connected together and given 3 KV for 1 minute. Equipment used : High Voltage tester ( 100KV & 3KV)
  • 9. 4.INDUCED OVER VOLTAGE WITHSTAND TEST (DVDF TEST)- This test checks the inter turn insulation. For a 11KV/433V transformer,866 Volts are applied at the 433V winding with the help of a Generator for 1 minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to 100HZ. Equipment used : MOTOR GENERATOR SET
  • 11. 5.MEASUREMENT OF VOLTAGE RATIO This test measures the voltage ratio as per the customer’s requirement. V1/V2 = N1/N2 The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct. Equipment used : Turns Ratiometer
  • 12. 6.MEASUREMENT OF NO LOAD LOSS & CURRENT- The iron losses and no load current are measured in this test. The 433V winding is charged at 433V supply & the 11KV winding is left open .The power consumed by the transformer at no load is the no load loss in the transformer. Effect of actual frequency must be taken into account. Equipment used : Watt meters or power analyzer.
  • 13. 7.MEASUREMENT OF LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION) This test measures the power consumed by the transformer when the 433V winding is short circuited and The rated current is passed through the 11KV winding. Equipment used : Wattmeters or power analyzer.
  • 15. 8.VECTOR GROUP VERIFICATION TEST This test verifies the Dyn-11 vector group of a distribution transformer. Equipment used : voltmeter.
  • 17.  Oil BDV TEST. Oil breakdown voltage is checked as per IS-335. 100 mm L X 70 mm B X 80 mm Ht. glass pot. 500ml Oil sample. Spherical electrodes with gap of 2.5 mm Recommended value : 60KV Equipment used : OIL BDV TEST SET.
  • 18. LIGHTENING IMPULSE TEST  All the dielectric tests check the insulation level of the job.  Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds wave  One impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three impulses at full voltage.  For a three phase transformer, impulse is carried out on all three phases in succession.  The voltage is applied on each of the line terminal in succession, keeping the other terminals earthed.  The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the wave shape is the criteria for failure.
  • 20. SHORT CIRCUIT WITHSTAND ABILITY TEST-  This tests measures the ability of the transformer to withstand the mechanical and thermal stresses caused by the external short circuit.  HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The testing plant parameters are such adjusted to give the rated short circuit current.  Supply is made on and closed after specified duration of short circuit. The record of current wave form is noted.  There should not be any mechanical distortion, fire to the transformer during this test. Similarly no wave form distortion. The transformer should also withstand the routine tests after the short circuit test.  The reactance of the winding measured before and after the S.C. test should not vary beyond the limits stated in the IS2026.
  • 21.  Transformer is the heart of any power system. Hence preventive maintenance is always cost effective and time saving. Any failure to the transformer can extremely affect the whole functioning of the organization.
  • 22.  OIL : 1. Oil level checking. Leakages to be attended. 2. Oil BDV & acidity checking at regular intervals. If acidity is between 0.5 to 1mg KOH, oil should be kept under observation. 3. BDV, Color and smell of oil are indicative.
  • 23. 1. Sludge, dust, dirt ,moisture can be removed by filtration. 2. Oil when topped up shall be of the same make. It may lead to sludge formation and acidic contents.  Insulation resistance of the transformer should be checked once in 6 months.  Megger values along with oil values indicate the condition of transformer.  Periodic Dissolved Gas Analysis can be carried out.
  • 24.  BUSHINGS Bushings should be cleaned and inspected for any cracks. Dust & dirt deposition, Salt or chemical deposition, cement or acid fumes depositions should be carefully noted and rectified.
  • 25.  Periodic checking of any loose connections of the terminations of HV & LV side.  Breather examination. Dehydration of Silica gel if necessary.  Explosion vent diaphragm examination.  Conservator to be cleaned from inside after every three years.  Regular inspection of OIL & WINDING TEMPERATURE METER readings.  Cleanliness in the Substation yard with all nets, vines, shrubs removed.
  • 26.  The best way of protecting a transformer is to have good preventive maintenance schedule.  Oil Temperature Indicators.  Winding Temperature indicators.  Buchholz Relay.  Magnetic Oil level Gauge.  Explosion Vent.
  • 27.  HT fuse & D.O. fuse.  LT circuit breaker.  HT Circuit breaker with Over load, Earth Fault relay tripping.  Oil Surge Relay for OLTC.  PRV for OLTC.  HORN GAPS & Lightening Arrestor.  Breather.
  • 28.  Insufficient Oil level.  Seepage of water in oil.  Prolonged Over loading.  Single Phase loading.  Unbalanced loading.  Faulty Termination (Improper sized lugs etc)  Power Theft.  Prolonged Short Circuit.  Faulty operation of tap changer switch.  Lack of installation checks.
  • 29.  Faulty design  Bad Quality of raw material.  Transit damaged transformers.  After failure , transformer is removed and replaced with new/repaired one without removing the cause of failure which results in immediate or short time failure.