Testing
of
Transformer
K.N.Srinivasan
Traceabllity
Accuracy
Precision
Probability
Std. deviation
Standards
Accreditation
Insulation tests
Short ckt test
Power rating
Other tests
Overview
A MODERN TRANSFORMER IS A
COMPLEX ELECTROMAGNETIC
APPARATUS
TRANSFORMERS SERVE FOR
TRANSMISSION AND DISTRIBUTION
OF ELECTRICAL ENERGY
TRANSFORMERS (DISTRIBUTION)
ARE THE LAST MAJOR LINK
BETWEEN UTILITY & CONSUMER
Introduction
TRANSFORMERS ARE STATIC
ALTERNATING CURRENT MACHINES
PRINCIPLE IS BASED ON MUTUAL
INDUCTION BETWEEN WINDINGS
THROUGH A COMMON CORE
OIL-IMMERSED AND DRY TYPES
POWER AND DISTRIBUTION TYPES
SPECIAL TYPES
Transformer on load
ϕ
V1
I0
E2
I1I’2
I2
E = - 4.44 φmf N
 Measurement of winding resistance
 Measurement of voltage ratio
 Polarity test
 Measurement of no-load loss & no-load current
 Measurement of load-loss & short-circuit impedance
 Measurement of insulation resistance
 Dielectric tests
Routine tests
 Measurement of winding resistance
 Measurement of voltage ratio
 Polarity test
 Measurement of no-load loss & no-load current
 Measurement of load-loss & short-circuit impedance
 Measurement of insulation resistance
 Dielectric tests
 Temperature-rise test
Type tests
 Dielectric test
 Short-circuit test
 Measurement of zero-sequence
impedance of three phase transformers
 Measurement of acoustic noise level
 Measurement of harmonics of the no-load
current
 Measurement of power taken by the fans
& oil pumps
Special tests
 Dielectric test
 Short-circuit test
 Measurement of zero-sequence
impedance of three phase transformers
 Measurement of acoustic noise level
 Measurement of harmonics of the no-load
current
 Measurement of power taken by the fans
& oil pumps
Special tests
• Separate source voltage withstand test
• Induced over voltage withstand test
• Impulse voltage withstand test
Dielectric test
Terminals of windings under test connected to HV terminal of the
source . All other windings, core, frame and tank are earthed.
Duration of test is 60 secs.
Highest system voltage(kV) Power frequency voltage(kV)
1.1 3
3.6 10
7.2 20
12 28
24 50
36 70
52 95
72.5 140
Separate source voltage withstand test
 This test is useful in determining
layer insulation and inter turn
insulation of windings.
 HV is kept open & twice the rated
voltage at twice the rated frequency
is applied to the LV for a duration of
60 secs.
Induced over voltage withstand test
Testing facilities
• Impulse generator
• Discharge circuit
• Recording system
• Voltage divider for measurement
Standard Impulse wave
Impulse withstand test
Wave shape
 Standard wave shape of impulse voltage is
1.2/50µsec.
 t1 is the rise time = 1.2µsecs.
 t2 is the tail time = 50 µ secs.
 Tolerance on t1 is ±30% & ±20% on t2.
Impulse generator
 Impulse wave is generated by discharge of
capacitors charged in parallel into a wave shaping
circuit.
Connection
Fig.7.3.1.Connection diagram
lmpulse Application : (Negative Polarity).
Oscillograms : 7.3.1 Reduced full wave 100 kV (Peak)
7.3.2. 100% full wave 170 kV (Peak)
7.3.3 Reduced Chopped wave 103 kV (Peak)
7.3.4. 100% chopped wave 170 kV (Peak)
7.3.5. 100% chopped wave 170 kV (Peak)
7.3.6. 100% full wave 170 kV (Peak)
7.2.7. 100% full wave 170 kV (Peak)
Oscilograms
Oscilograms contd.
Oscilograms contd.
Fig 7.3.3 Connection diagram
Generator capacitance 0.0625 uF
Series resistance 160 ohms
Tail resistance 1040 ohms
Voltage divider 1200 pF in parallel with 100 ohms
Impulse applications : (Negative Polarity)
Oscillogram No. 7.3.15. Reduced full wave 43 kV (Peak)
7.3.16. 100% full wave - 75 kV (Peak)
7.3.17. 100% full wave 75 kV (peak)
Comparison of oscillograms 15 & 16 indicates that the second voltage wave
oscillogram has collapsed and the corresponding point of the neutral current
there are high frequency oscillations. This indicates an arc over across major
portion of the transformer winding as a result of failure of the transformer
insulation.
Oscillograms 7.3.15 to 7.3.17
 MINOR INSULATION -conductor turns,
layers
●
enamel, paper
●
oil ducts, paper cylinders
 MAJOR INSULATION- winding, core
●
press board cylinders, oil ducts
BUSHINGS - porcelain , condenser
Power & distribution transformers must be constructed to
withstand mechanical stresses caused by external faults.
These stresses are produced due to electromagnetic forces
as a result of very high current in the windings during
short-circuits.
Short-circuit test
 Prior to the short-circuit, transformer
is subjected to routine tests.
Asymmetrical current
 The peak current that transformer is
required to withstand = Isc(peak)=K Isc
Dynamic ability to withstand short-circuit
Value of K :
x/r 1 1.5 2 3 4 5 6 8 10 >14
K 1.51 1.64 1.76 1.95 2.09 2.19 2.27 2.38 2.46 2.55
Short-circuit may be
a) Preset or
b) Post set
Duration of each test
being 0.5 sec. ( > 5 MVA 0.25 sec)
For 1φ Transformers
No. of tests = Three
one test with tap at highest voltage ratio, one test in principal taping &
one test in
lowest voltage ratio
Short-circuit testing procedure
3φ Transformers
 No. of tests = Nine
 Three tests with tap at highest voltage ratio, three
tests in principal taping & three tests in lowest voltage
ratio
Tolerances on
 Asymmetrical current = ±5 %
 Symmetrical current = ±10 %
 Test duration = ±10 %
Oscillogram of dynamic short-circuit test on
3Phase 11/0.433kV 500kVA Distribution
transformer
 All the routine tests shall be repeated
 Dielectric test shall be at 75%
 Transformer shall be untanked
 Reactance measured after s.c. test shall not
differ by more than 2% for circular coils & 7.5%
for non-circular coils.
Analysis of the results
SC Test contd.
This is to ascertain that transformer & its cooling arrangements
are effectively designed so that temp. rise of winding & cooling
medium does not exceed the permissible limits.
Temp. rise limits for Dry type transformers
Class of insulation Temp. rise °C
A 50
E 65
B 70
F 90
H 115
C 140
Temperature rise test
Temp. rise limits for oil immersed transformers
Part Temp. rise °C
External cooling medium
Air Water
Winding 55 60
(temp.rise by resistance method)
Top oil 50 55
(temp.rise by thermometer method)
a) Direct loading
b) Back-to-Back method
c) Short-circuit method
Loading methods
Duration of test
Top oil temperature-rise does not vary more than
10
C/hour during 4 consecutive hourly readings
Partial Discharge Tests
100pC
500pC
Sound pressure level 20 log10 d/0.00002 dB
d Newton per square meter
Noise Level
Testing of transformer
Testing of transformer
meter
Highest voltage
for equipment
Um
kV
(r.m.s. value)
Rated short duration
power frequency
withstand voltage
kV
(r.m.s. value)
Rated
lightning impulse
withstand voltage
kV
(peak value)
3.6 10 20
40
7.2 20 40
60
12 28 60
75
95
17.5 38 75
95
24 50 95
125
145
36 70 145
170
52 95 250
72.5 140 325
123 (185)
230
450
550
145 (185)
230
275
(450)
550
650
170 (230)
275
325
(550)
650
750
245 (275)
(325)
360
395
460
(650)
(750)
850
950
1050
Highest
voltage for
equipment
Um
kV
(r.m.s. value)
Standard switching impulse
withstand voltage
--------------------------------------
-------------------
Longitudinal Phase-to-earth
Phase-to-phase
Insulation
(ratio to the
(note 1)
phase-to-earth
kV kV
peak value)
(peak value) (peak value)
Standard
lightning impulse
withstand voltage
kV
(peak value)
300 750 750 1,50 850
950
750 850 1,50 950
1050
362 850 850 1,50 950
1050
850 950 1,50 1050
1175
420 850 850 1,60 1050
1175
950 950 1,50 1175
1300
950 1050 1,50 1300
1425
525 950 950 1,70 1175
1300
950 1050 1,60 1300
1425
950 1175 1,50 1425
1550
765 1175 1300 1,70 1675
1800
1175 1425 1,70 1800
1950
1175 1550 1,60 1950
2100

More Related Content

PPTX
Testing of transformer
PDF
Transformer testing
PDF
Testing of Transformers.
PDF
Transformer Failures and Case Studies
PPTX
Transformers
PPTX
Diesel generator
PDF
Tài liệu biến tần Siemens Sinamic V20 - Hướng dẫn sử dụng bằng Tiếng Việt
PPTX
Power Transformer Protection
Testing of transformer
Transformer testing
Testing of Transformers.
Transformer Failures and Case Studies
Transformers
Diesel generator
Tài liệu biến tần Siemens Sinamic V20 - Hướng dẫn sử dụng bằng Tiếng Việt
Power Transformer Protection

What's hot (20)

PPTX
Transformer maintenance
PPT
Testing,maintenance&protection
PPT
Transformer design and protection
PDF
PDF
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
PDF
Transformer & OLTC
PDF
Transformer Maintenance and Testing
PPT
Substation Training presentation
PPTX
Motor Test (Induction motor)
PDF
Current transformer (ct)
PDF
Transformer 2
PPT
Operation and maintenance of transformer
ODP
Transformers protection, an introduction
PPTX
open circuit and short circuit test on transformer
PPT
Transformer
PPTX
Differential Protection Relay
PPTX
Tap changer
PPTX
High voltage testing of electrical transformer
PPTX
Tan delta test for power transformers
PPS
Distribution Transformer testing, West Bengal, India
Transformer maintenance
Testing,maintenance&protection
Transformer design and protection
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
Transformer & OLTC
Transformer Maintenance and Testing
Substation Training presentation
Motor Test (Induction motor)
Current transformer (ct)
Transformer 2
Operation and maintenance of transformer
Transformers protection, an introduction
open circuit and short circuit test on transformer
Transformer
Differential Protection Relay
Tap changer
High voltage testing of electrical transformer
Tan delta test for power transformers
Distribution Transformer testing, West Bengal, India
Ad

Viewers also liked (8)

PPT
EE201 -Chapter 4
PPT
Sc and oc test on transformer
PPT
EE201 -Chapter 6
PPT
EE201 - Chapter 3 (BJT)
PPT
Lecture 8 bjt_1
PPT
TRANSISTORS
PPT
3.bipolar junction transistor (bjt)
PPTX
Transistors ppt by behin
EE201 -Chapter 4
Sc and oc test on transformer
EE201 -Chapter 6
EE201 - Chapter 3 (BJT)
Lecture 8 bjt_1
TRANSISTORS
3.bipolar junction transistor (bjt)
Transistors ppt by behin
Ad

Similar to Testing of transformer (20)

PPTX
Introduction of transfromer
PPTX
ct pt testing...........................................
PDF
Power-Transformer-Testing-Brochure-ENU.pdf
PPTX
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
PPTX
2. 1st and 2nd Session Transformer Testing procedure.pptx
PPTX
Lightning impulse test in precise
PPT
Power Transformer Differential protection
PPT
Differential protection
PPT
Transformer basic
PPTX
Switchgear & Rectifier ppt
PDF
Schneider Technical Guide - Medium Voltage Equipment Designers
PPT
6. Factory Acceptance Tests transformer.ppt
PPT
TESTING,MAINTENANCE&PROTECTION.ppt
PPT
TESTING,MAINTENANCE&PROTECTION.ppt
PPT
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
PPTX
tcee-161003100321.pptx
PDF
Power transformers rating
PDF
Ac Test Transformer
PPTX
Short circuit test in brief
PPTX
Testing, Maintenace and Protection of Transformer.pptx
Introduction of transfromer
ct pt testing...........................................
Power-Transformer-Testing-Brochure-ENU.pdf
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
2. 1st and 2nd Session Transformer Testing procedure.pptx
Lightning impulse test in precise
Power Transformer Differential protection
Differential protection
Transformer basic
Switchgear & Rectifier ppt
Schneider Technical Guide - Medium Voltage Equipment Designers
6. Factory Acceptance Tests transformer.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
tcee-161003100321.pptx
Power transformers rating
Ac Test Transformer
Short circuit test in brief
Testing, Maintenace and Protection of Transformer.pptx

Recently uploaded (20)

PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
PPTX
ai_satellite_crop_management_20250815030350.pptx
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
First part_B-Image Processing - 1 of 2).pdf
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Petroleum Refining & Petrochemicals.pptx
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
Java Basics-Introduction and program control
PDF
Cryptography and Network Security-Module-I.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Introduction to Power System StabilityPS
August -2025_Top10 Read_Articles_ijait.pdf
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
ai_satellite_crop_management_20250815030350.pptx
Information Storage and Retrieval Techniques Unit III
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
distributed database system" (DDBS) is often used to refer to both the distri...
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
First part_B-Image Processing - 1 of 2).pdf
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Petroleum Refining & Petrochemicals.pptx
MLpara ingenieira CIVIL, meca Y AMBIENTAL
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Java Basics-Introduction and program control
Cryptography and Network Security-Module-I.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Exploratory_Data_Analysis_Fundamentals.pdf
Introduction to Power System StabilityPS

Testing of transformer

  • 3. Insulation tests Short ckt test Power rating Other tests
  • 4. Overview A MODERN TRANSFORMER IS A COMPLEX ELECTROMAGNETIC APPARATUS TRANSFORMERS SERVE FOR TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY TRANSFORMERS (DISTRIBUTION) ARE THE LAST MAJOR LINK BETWEEN UTILITY & CONSUMER
  • 5. Introduction TRANSFORMERS ARE STATIC ALTERNATING CURRENT MACHINES PRINCIPLE IS BASED ON MUTUAL INDUCTION BETWEEN WINDINGS THROUGH A COMMON CORE OIL-IMMERSED AND DRY TYPES POWER AND DISTRIBUTION TYPES SPECIAL TYPES
  • 7.  Measurement of winding resistance  Measurement of voltage ratio  Polarity test  Measurement of no-load loss & no-load current  Measurement of load-loss & short-circuit impedance  Measurement of insulation resistance  Dielectric tests Routine tests
  • 8.  Measurement of winding resistance  Measurement of voltage ratio  Polarity test  Measurement of no-load loss & no-load current  Measurement of load-loss & short-circuit impedance  Measurement of insulation resistance  Dielectric tests  Temperature-rise test Type tests
  • 9.  Dielectric test  Short-circuit test  Measurement of zero-sequence impedance of three phase transformers  Measurement of acoustic noise level  Measurement of harmonics of the no-load current  Measurement of power taken by the fans & oil pumps Special tests
  • 10.  Dielectric test  Short-circuit test  Measurement of zero-sequence impedance of three phase transformers  Measurement of acoustic noise level  Measurement of harmonics of the no-load current  Measurement of power taken by the fans & oil pumps Special tests
  • 11. • Separate source voltage withstand test • Induced over voltage withstand test • Impulse voltage withstand test Dielectric test
  • 12. Terminals of windings under test connected to HV terminal of the source . All other windings, core, frame and tank are earthed. Duration of test is 60 secs. Highest system voltage(kV) Power frequency voltage(kV) 1.1 3 3.6 10 7.2 20 12 28 24 50 36 70 52 95 72.5 140 Separate source voltage withstand test
  • 13.  This test is useful in determining layer insulation and inter turn insulation of windings.  HV is kept open & twice the rated voltage at twice the rated frequency is applied to the LV for a duration of 60 secs. Induced over voltage withstand test
  • 14. Testing facilities • Impulse generator • Discharge circuit • Recording system • Voltage divider for measurement Standard Impulse wave Impulse withstand test
  • 15. Wave shape  Standard wave shape of impulse voltage is 1.2/50µsec.  t1 is the rise time = 1.2µsecs.  t2 is the tail time = 50 µ secs.  Tolerance on t1 is ±30% & ±20% on t2. Impulse generator  Impulse wave is generated by discharge of capacitors charged in parallel into a wave shaping circuit.
  • 16. Connection Fig.7.3.1.Connection diagram lmpulse Application : (Negative Polarity). Oscillograms : 7.3.1 Reduced full wave 100 kV (Peak) 7.3.2. 100% full wave 170 kV (Peak) 7.3.3 Reduced Chopped wave 103 kV (Peak) 7.3.4. 100% chopped wave 170 kV (Peak) 7.3.5. 100% chopped wave 170 kV (Peak) 7.3.6. 100% full wave 170 kV (Peak) 7.2.7. 100% full wave 170 kV (Peak)
  • 19. Oscilograms contd. Fig 7.3.3 Connection diagram Generator capacitance 0.0625 uF Series resistance 160 ohms Tail resistance 1040 ohms Voltage divider 1200 pF in parallel with 100 ohms Impulse applications : (Negative Polarity) Oscillogram No. 7.3.15. Reduced full wave 43 kV (Peak) 7.3.16. 100% full wave - 75 kV (Peak) 7.3.17. 100% full wave 75 kV (peak) Comparison of oscillograms 15 & 16 indicates that the second voltage wave oscillogram has collapsed and the corresponding point of the neutral current there are high frequency oscillations. This indicates an arc over across major portion of the transformer winding as a result of failure of the transformer insulation.
  • 21.  MINOR INSULATION -conductor turns, layers ● enamel, paper ● oil ducts, paper cylinders  MAJOR INSULATION- winding, core ● press board cylinders, oil ducts BUSHINGS - porcelain , condenser
  • 22. Power & distribution transformers must be constructed to withstand mechanical stresses caused by external faults. These stresses are produced due to electromagnetic forces as a result of very high current in the windings during short-circuits. Short-circuit test
  • 23.  Prior to the short-circuit, transformer is subjected to routine tests. Asymmetrical current  The peak current that transformer is required to withstand = Isc(peak)=K Isc Dynamic ability to withstand short-circuit Value of K : x/r 1 1.5 2 3 4 5 6 8 10 >14 K 1.51 1.64 1.76 1.95 2.09 2.19 2.27 2.38 2.46 2.55
  • 24. Short-circuit may be a) Preset or b) Post set Duration of each test being 0.5 sec. ( > 5 MVA 0.25 sec) For 1φ Transformers No. of tests = Three one test with tap at highest voltage ratio, one test in principal taping & one test in lowest voltage ratio Short-circuit testing procedure
  • 25. 3φ Transformers  No. of tests = Nine  Three tests with tap at highest voltage ratio, three tests in principal taping & three tests in lowest voltage ratio Tolerances on  Asymmetrical current = ±5 %  Symmetrical current = ±10 %  Test duration = ±10 %
  • 26. Oscillogram of dynamic short-circuit test on 3Phase 11/0.433kV 500kVA Distribution transformer
  • 27.  All the routine tests shall be repeated  Dielectric test shall be at 75%  Transformer shall be untanked  Reactance measured after s.c. test shall not differ by more than 2% for circular coils & 7.5% for non-circular coils. Analysis of the results SC Test contd.
  • 28. This is to ascertain that transformer & its cooling arrangements are effectively designed so that temp. rise of winding & cooling medium does not exceed the permissible limits. Temp. rise limits for Dry type transformers Class of insulation Temp. rise °C A 50 E 65 B 70 F 90 H 115 C 140 Temperature rise test
  • 29. Temp. rise limits for oil immersed transformers Part Temp. rise °C External cooling medium Air Water Winding 55 60 (temp.rise by resistance method) Top oil 50 55 (temp.rise by thermometer method)
  • 30. a) Direct loading b) Back-to-Back method c) Short-circuit method Loading methods Duration of test Top oil temperature-rise does not vary more than 10 C/hour during 4 consecutive hourly readings
  • 32. Sound pressure level 20 log10 d/0.00002 dB d Newton per square meter Noise Level
  • 35. meter
  • 36. Highest voltage for equipment Um kV (r.m.s. value) Rated short duration power frequency withstand voltage kV (r.m.s. value) Rated lightning impulse withstand voltage kV (peak value) 3.6 10 20 40 7.2 20 40 60 12 28 60 75 95 17.5 38 75 95 24 50 95 125 145 36 70 145 170 52 95 250 72.5 140 325 123 (185) 230 450 550 145 (185) 230 275 (450) 550 650 170 (230) 275 325 (550) 650 750 245 (275) (325) 360 395 460 (650) (750) 850 950 1050
  • 37. Highest voltage for equipment Um kV (r.m.s. value) Standard switching impulse withstand voltage -------------------------------------- ------------------- Longitudinal Phase-to-earth Phase-to-phase Insulation (ratio to the (note 1) phase-to-earth kV kV peak value) (peak value) (peak value) Standard lightning impulse withstand voltage kV (peak value) 300 750 750 1,50 850 950 750 850 1,50 950 1050 362 850 850 1,50 950 1050 850 950 1,50 1050 1175 420 850 850 1,60 1050 1175 950 950 1,50 1175 1300 950 1050 1,50 1300 1425 525 950 950 1,70 1175 1300 950 1050 1,60 1300 1425 950 1175 1,50 1425 1550 765 1175 1300 1,70 1675 1800 1175 1425 1,70 1800 1950 1175 1550 1,60 1950 2100