This document contains summaries of common production and manufacturing concepts that may be asked about in an electrical project engineer interview:
Flow control focuses on efficiently moving materials through the production process by identifying and addressing bottlenecks. Materials requirement planning (MRP) uses computer systems to manage ordering materials to supply future production needs. Just-in-time (JIT) manufacturing aims to reduce waste by minimizing inventory and scheduling deliveries and production to optimize efficiency.