 "An agreement enforceable by law is a contract.”
OR
 For a CONTRACT to be valid, there must be an offer
from the owner in the form of tender notice to get
some specified work to be executed and there must
be an acceptance from the contractor to execute the
work, both the offer and the acceptance must be
definite and legal.
2
1. Lump-sum contract
2. Cost plus percentage contract
3. Cost plus a fixed fee contract
4. Percentage rate contract
5. Item rate contract
6. Turn-key contract
7. Cost plus sliding scale of fees
8. Negotiated contracts
9. Target Contract
10. Labour Contract
11. Joint Venture Contract
3
1. Lump-sum contract
 In this type the general specifications and description
of different parts of building with dimensions are
included in contract agreement.
 The quantities or schedule of different items of work
are not provided, but the contractor shall have to
complete the work as per plan & specifications given
within fixed sum, within a fixed time.
 This type of contract will be useful for the works like
sanitary blocks for school building, a compound wall,
a small room for watchman, a septic tank and soak-
pit, a manhole etc.
4
BACK
 In this type actual cost plus an agreed percentage in
addition is added to allow profit
 This type is adopted when conditions like rates of
labor and materials are liable to fluctuate
 Bill of quantities has to be framed but owner should
carefully define the cost and record exactly what is
permissible in the cost of work
5
Advantages
 Suitable for urgent works
 It is suitable when work can not be executed by other type of
contract & if rates of labour and materials are fluctuating.
Disadvantages
 Close supervision and checking of delivery notes and invoice are
required .
 This is unsuitable where the necessary staff is not available.
 It is contractors advantage to make cost high by wasting material,
employing inefficient workmen, as he takes little risk and his profit
is assured.
6
BACK
 In this system a fixed fee is given as contractor’s
profit irrespective of the total cost of work.
 This is to control the tendency of the contractor to
increase the cost of the project unnecessarily as in
Cost plus % rate.
 Smaller the completion time more is the profit and
hence the contractors hurry to complete the work and
the quality of workmanship is not maintained.
 This system is not generally used.
7
Advantage
 Since fixed fee covers all the overhead charges and
profit. contractor tries to complete the work speedily
to earn fee.
Disadvantage
• Contractor shall try to complete work quickly by
purchasing material with high rate and engage labor
at high cost due to which owner will be in loss.
8
BACK
 In this system the contractors are required to quote
single percentage either higher or lower at which he
wants to execute the job.
 Here scrutiny of the tenders become easier and as
cement and steel is usually supplied by the
department, chances of manipulation is less.
 This is the most commonly adopted system of
contract in the different departments of our state.
9
 Owner knows the cost before hand.
 Detailed measurement of work is not
recorded unless there is some addition and
alteration.
 Complete picture of work from detailed
drawings and total cost is known before
hand, excellent planning efficient
management of work can be done.
 Contractor tries to complete work quickly for
the sake of payment.
10
 In this it is essential that the work should be checked
accurately and completely shown on the drawings in
the specifications and the full information about the
site condition should be available other wise it will
leads to disputes.
 Contractor is free to use the lowest cost of material
equipment, methods.
 Difficulty arises in making any intermediate payment.
 There is uncertainty about the quality ,smooth
progress, and completion of work
11
BACK
 Contractor undertakes work on item rate
basis
 Payment is done on the basis of quantities
of items done and their respective rates
 Quantities are calculated by detailed
measurements and shown in tender form.
Also called as unit price contract
 Total cost is arrived by summing up of each
items rate.
12
 As the contractor gets payment against the
actual quantities of item done by him the
methods economical because no excess
payment can be made
 As rates are item wise, contractor is not
worried about the uncertainty in the plan
and specification
 Work can be started after accepting the
tender without waiting for the detailed
drawings and specifications
13
Owner shall be interested in getting the works of such items
whose rates are lower but contractor will be interested in
works with higher prices.
There may be difficulty in classifying the work such as
ordinary sol, soil mixed with kankar or loose rock because
contractor will charge according to the classification whose
price is higher.
It becomes difficult to calculate to exactly the final cost of
construction resulting in difficulty for arrangement of funds.
Work is started before getting the final drawings and
specifications which result in demolishing of some work
which increases the construction cost.
14
BACK
 It sometimes happens that the owner contemplating a
construction project desires to deal with only one party for all
services, both engineering and constructions, in connection
with the work. This is so called “turn-key or package job”
 A turnkey contract is a business arrangement in which a
project is delivered in a completed state. Rather than
contracting with an owner to develop a project in stages, the
developer is hired to finish the entire project without owner
input.
 In effect, the developer is finishing the project and “turning the
key” over to the new owner. Once the project is completed it is
handed over to the owner.
 The owner has to complete the transaction works and occupy
the structure by simply turning the key, ie. opening the door. 15
 In a turnkey contract, the owner is generally left out
of the building process entirely,as the developer
handles all decisions and problems related to
construction.
 A contract of this kind may also be used in the
residential home building industry
 With a turnkey agreement, a builder or developer
completes both the construction and the finishes in
the home before turning it over to the homeowner.
 The homeowner is often offered a chance to select
finishes, including curtains, paint colours and
carpeting.
16
 A turnkey contract also provides more time for an
owner to seek financing and investors before he is
required to pay for a completed project
 builder will construct a retail establishment for an
owner, and the builder will receive a percentage of
the gross receipts for a specific period of time.
 construction decisions are based on the long-term
needs of the project, rather than just the short-term
decisions needed to get the job done.
17
BACK
 In this type of contract the contractor is paid by the owner
the actual cost of construction plus an amount of fee
inversely variable according to the increase or decrease of
the estimated cost agreed first by both parties. thus the
higher the actual cost, lower will be the value of fee and
vice versa.
 Advantages: In this case the contractor shall not try to
increase the actual cost. The actual cost is lower and
lower, so both the owner and the contractor will be
benefited.
 Disadvantages: estimated cost should be accurate. Other
wise the contractor get more profit if the actual cost is
much higher than the estimated cost.
18
BACK
 When the work is awarded on contract by
mutual negotiation between the parties with
out call of tenders, it is said to be negotiated
contract.
 In PWD, the contract are negotiated on special
conditions like to obtain reasonable rates
and also helpful in case of emergency.
 Basic advantage by this system is that it
brings economy in expenditure, parties will
be reliable and less chance of disputes
19
BACK
20
9. Target contract
The contractor is paid a fixed fee on a prime cost
basis for the work performed under the contract
and in addition he receives a percentage on the
savings effected against either a prior agreed
estimated total cost or a target value arrived
without changing the specification.
It was presumed that by proper management of
the work, the contractor can reduce the cost of
work. But due to tremendous increase in the
cost of materials it never materialise and hence
this system is not getting popularity.
BACK
21
10. Labour contract
This is the most commonly adopted system for the
construction of private individual buildings in
small cities. The contractor arranges all
necessary labour, tools & plant and equipments
required. The materials are supplied by the
owner and he appoints an Engineer to supervise
the work to maintain the quality and economy in
construction.
This system is suitable in the works of Govt.
departments as they are in a privileged position
to buy large quantities of materials at cheap
rates.
BACK
22
11. Joint venture contract
In case of huge important projects the construction
works can be categorised into different parts and
each part can be given to a specialised
contractor in that field. This method improves
the quality of work and the project can be
completed within a short period of time.
Thus the project works can be divided among
different contractors and hence joint venture
system of contract developed.
BACK
23
12. BOT system
Build operate and transfer is a new system in which
the land is acquired by the Govt. and the
contractor is asked to build the structure and
then operate it until he collects the money he had
spent for the construction, as fees from the users.
Once the construction cost is recovered, the
structure is handed over to the owner. No
payment is made to the contractor by the
owner/Govt.
Security is provided to the builder by the Govt.
regarding law and order problems if any.
Bridges and roads are usually constructed by
adopting this system of contract. Toll is collected
from the users/vehicles passing over it by the
contractor to recover the construction cost.
SELF STUDY:
 Responsibilities of Owner / Client.
 Responsibilities of Engineer.
 Responsibilities of Contractor.
24
BACK

More Related Content

PPTX
CONTRACTS AND ITS TYPES
PPTX
Contracts and-tenders
PPTX
Tender Process | A Complete Procurement Guide
PPTX
Construction contract
PPTX
Contract Costing.pptx
PPT
Contraception
PPTX
Perunthalivar kamaraj
PPTX
Cladding
CONTRACTS AND ITS TYPES
Contracts and-tenders
Tender Process | A Complete Procurement Guide
Construction contract
Contract Costing.pptx
Contraception
Perunthalivar kamaraj
Cladding

What's hot (20)

PDF
Conditions Of Contract
DOCX
Pre qualification stages and tender selection
PPTX
Earnest Money
PPTX
Contracts and their types
PPTX
Tender & Tender Notice
PPT
contract procedure
PPTX
Estimation and Costing - Contracts
PPTX
Unit-2_Tender
DOCX
Bills of quantities
PDF
Construction contract
PPTX
Tendering in Construction
PPTX
basics of civil engineering
PPTX
Types of contracts
PPT
Construction process
PPTX
TENDER DOCUMENT
PPTX
Tenders , Invitation of tender
PPTX
Negotiated contracts
PPTX
Excavating Equipment
PPTX
Construction Contracts: Basics of Contracts and Contract Administration
Conditions Of Contract
Pre qualification stages and tender selection
Earnest Money
Contracts and their types
Tender & Tender Notice
contract procedure
Estimation and Costing - Contracts
Unit-2_Tender
Bills of quantities
Construction contract
Tendering in Construction
basics of civil engineering
Types of contracts
Construction process
TENDER DOCUMENT
Tenders , Invitation of tender
Negotiated contracts
Excavating Equipment
Construction Contracts: Basics of Contracts and Contract Administration
Ad

Similar to types of contracts (20)

PPTX
Chapter-2 Construction Contract. Subject code:3160614ptx
PPTX
civil engineering-Contracts
PPTX
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
PDF
Contract
PDF
Types of Tender and their Process
PPTX
Contract- Vijay Suryawanshi
PDF
5 Popular Types of Construction Contracts
PPTX
Types of contract
PPT
contracts-unit 3.ppt
PDF
CE-CONTRACTS-REPORT.pdf
PPTX
Final types of contracts- different types of contracts
PPTX
Unit-1_Contracts
PPTX
Construction practices
PPTX
Types and forms of contracts
PPT
Nce603 mod unit4
PPT
Contracts 2
PDF
Contracts
PPTX
1. Contracts and Tender.pptx jkbjhvjhcvhgcfgxftxtrjxgjfchchgchgkchgkchkgchgkch
PPTX
05 Contract Management.pptx . DEFINITION
PDF
Cost estimates & contract documents ce224 pdf
Chapter-2 Construction Contract. Subject code:3160614ptx
civil engineering-Contracts
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
Contract
Types of Tender and their Process
Contract- Vijay Suryawanshi
5 Popular Types of Construction Contracts
Types of contract
contracts-unit 3.ppt
CE-CONTRACTS-REPORT.pdf
Final types of contracts- different types of contracts
Unit-1_Contracts
Construction practices
Types and forms of contracts
Nce603 mod unit4
Contracts 2
Contracts
1. Contracts and Tender.pptx jkbjhvjhcvhgcfgxftxtrjxgjfchchgchgkchgkchkgchgkch
05 Contract Management.pptx . DEFINITION
Cost estimates & contract documents ce224 pdf
Ad

More from KEVINMISTRY8 (11)

PPTX
Different equipment use in pavement
PDF
Maintenance of pavement module
PDF
Design of highway pavement module
PDF
Construction of pavement module
PDF
Irc 58-2015 c c road thick design
PDF
Irc 37-2018
PPTX
Principale of super position and maxwell reciprocal therom
PPTX
Principles of building planning, principles of architecture
PPTX
contract administration PPT
PPTX
tendering
PPTX
Internship presentation 180 27 presentation-mistry kevin
Different equipment use in pavement
Maintenance of pavement module
Design of highway pavement module
Construction of pavement module
Irc 58-2015 c c road thick design
Irc 37-2018
Principale of super position and maxwell reciprocal therom
Principles of building planning, principles of architecture
contract administration PPT
tendering
Internship presentation 180 27 presentation-mistry kevin

Recently uploaded (20)

PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
DOCX
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
PPTX
Solar energy pdf of gitam songa hemant k
PDF
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PDF
Design of Material Handling Equipment Lecture Note
PPTX
Agentic Artificial Intelligence (Agentic AI).pptx
PDF
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
PPTX
AI-Reporting for Emerging Technologies(BS Computer Engineering)
PDF
Project_Mgmt_Institute_-Marc Marc Marc .pdf
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PPTX
MAD Unit - 3 User Interface and Data Management (Diploma IT)
PPT
Programmable Logic Controller PLC and Industrial Automation
PPTX
Principal presentation for NAAC (1).pptx
PPTX
Software Engineering and software moduleing
PDF
Computer organization and architecuture Digital Notes....pdf
PPTX
Amdahl’s law is explained in the above power point presentations
PPTX
Cisco Network Behaviour dibuywvdsvdtdstydsdsa
PPTX
mechattonicsand iotwith sensor and actuator
20250617 - IR - Global Guide for HR - 51 pages.pdf
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
ENVIRONMENTAL PROTECTION AND MANAGEMENT (18CVL756)
Solar energy pdf of gitam songa hemant k
VTU IOT LAB MANUAL (BCS701) Computer science and Engineering
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
Design of Material Handling Equipment Lecture Note
Agentic Artificial Intelligence (Agentic AI).pptx
VSL-Strand-Post-tensioning-Systems-Technical-Catalogue_2019-01.pdf
AI-Reporting for Emerging Technologies(BS Computer Engineering)
Project_Mgmt_Institute_-Marc Marc Marc .pdf
MLpara ingenieira CIVIL, meca Y AMBIENTAL
MAD Unit - 3 User Interface and Data Management (Diploma IT)
Programmable Logic Controller PLC and Industrial Automation
Principal presentation for NAAC (1).pptx
Software Engineering and software moduleing
Computer organization and architecuture Digital Notes....pdf
Amdahl’s law is explained in the above power point presentations
Cisco Network Behaviour dibuywvdsvdtdstydsdsa
mechattonicsand iotwith sensor and actuator

types of contracts

  • 1. 1
  • 2.  "An agreement enforceable by law is a contract.” OR  For a CONTRACT to be valid, there must be an offer from the owner in the form of tender notice to get some specified work to be executed and there must be an acceptance from the contractor to execute the work, both the offer and the acceptance must be definite and legal. 2
  • 3. 1. Lump-sum contract 2. Cost plus percentage contract 3. Cost plus a fixed fee contract 4. Percentage rate contract 5. Item rate contract 6. Turn-key contract 7. Cost plus sliding scale of fees 8. Negotiated contracts 9. Target Contract 10. Labour Contract 11. Joint Venture Contract 3
  • 4. 1. Lump-sum contract  In this type the general specifications and description of different parts of building with dimensions are included in contract agreement.  The quantities or schedule of different items of work are not provided, but the contractor shall have to complete the work as per plan & specifications given within fixed sum, within a fixed time.  This type of contract will be useful for the works like sanitary blocks for school building, a compound wall, a small room for watchman, a septic tank and soak- pit, a manhole etc. 4 BACK
  • 5.  In this type actual cost plus an agreed percentage in addition is added to allow profit  This type is adopted when conditions like rates of labor and materials are liable to fluctuate  Bill of quantities has to be framed but owner should carefully define the cost and record exactly what is permissible in the cost of work 5
  • 6. Advantages  Suitable for urgent works  It is suitable when work can not be executed by other type of contract & if rates of labour and materials are fluctuating. Disadvantages  Close supervision and checking of delivery notes and invoice are required .  This is unsuitable where the necessary staff is not available.  It is contractors advantage to make cost high by wasting material, employing inefficient workmen, as he takes little risk and his profit is assured. 6 BACK
  • 7.  In this system a fixed fee is given as contractor’s profit irrespective of the total cost of work.  This is to control the tendency of the contractor to increase the cost of the project unnecessarily as in Cost plus % rate.  Smaller the completion time more is the profit and hence the contractors hurry to complete the work and the quality of workmanship is not maintained.  This system is not generally used. 7
  • 8. Advantage  Since fixed fee covers all the overhead charges and profit. contractor tries to complete the work speedily to earn fee. Disadvantage • Contractor shall try to complete work quickly by purchasing material with high rate and engage labor at high cost due to which owner will be in loss. 8 BACK
  • 9.  In this system the contractors are required to quote single percentage either higher or lower at which he wants to execute the job.  Here scrutiny of the tenders become easier and as cement and steel is usually supplied by the department, chances of manipulation is less.  This is the most commonly adopted system of contract in the different departments of our state. 9
  • 10.  Owner knows the cost before hand.  Detailed measurement of work is not recorded unless there is some addition and alteration.  Complete picture of work from detailed drawings and total cost is known before hand, excellent planning efficient management of work can be done.  Contractor tries to complete work quickly for the sake of payment. 10
  • 11.  In this it is essential that the work should be checked accurately and completely shown on the drawings in the specifications and the full information about the site condition should be available other wise it will leads to disputes.  Contractor is free to use the lowest cost of material equipment, methods.  Difficulty arises in making any intermediate payment.  There is uncertainty about the quality ,smooth progress, and completion of work 11 BACK
  • 12.  Contractor undertakes work on item rate basis  Payment is done on the basis of quantities of items done and their respective rates  Quantities are calculated by detailed measurements and shown in tender form. Also called as unit price contract  Total cost is arrived by summing up of each items rate. 12
  • 13.  As the contractor gets payment against the actual quantities of item done by him the methods economical because no excess payment can be made  As rates are item wise, contractor is not worried about the uncertainty in the plan and specification  Work can be started after accepting the tender without waiting for the detailed drawings and specifications 13
  • 14. Owner shall be interested in getting the works of such items whose rates are lower but contractor will be interested in works with higher prices. There may be difficulty in classifying the work such as ordinary sol, soil mixed with kankar or loose rock because contractor will charge according to the classification whose price is higher. It becomes difficult to calculate to exactly the final cost of construction resulting in difficulty for arrangement of funds. Work is started before getting the final drawings and specifications which result in demolishing of some work which increases the construction cost. 14 BACK
  • 15.  It sometimes happens that the owner contemplating a construction project desires to deal with only one party for all services, both engineering and constructions, in connection with the work. This is so called “turn-key or package job”  A turnkey contract is a business arrangement in which a project is delivered in a completed state. Rather than contracting with an owner to develop a project in stages, the developer is hired to finish the entire project without owner input.  In effect, the developer is finishing the project and “turning the key” over to the new owner. Once the project is completed it is handed over to the owner.  The owner has to complete the transaction works and occupy the structure by simply turning the key, ie. opening the door. 15
  • 16.  In a turnkey contract, the owner is generally left out of the building process entirely,as the developer handles all decisions and problems related to construction.  A contract of this kind may also be used in the residential home building industry  With a turnkey agreement, a builder or developer completes both the construction and the finishes in the home before turning it over to the homeowner.  The homeowner is often offered a chance to select finishes, including curtains, paint colours and carpeting. 16
  • 17.  A turnkey contract also provides more time for an owner to seek financing and investors before he is required to pay for a completed project  builder will construct a retail establishment for an owner, and the builder will receive a percentage of the gross receipts for a specific period of time.  construction decisions are based on the long-term needs of the project, rather than just the short-term decisions needed to get the job done. 17 BACK
  • 18.  In this type of contract the contractor is paid by the owner the actual cost of construction plus an amount of fee inversely variable according to the increase or decrease of the estimated cost agreed first by both parties. thus the higher the actual cost, lower will be the value of fee and vice versa.  Advantages: In this case the contractor shall not try to increase the actual cost. The actual cost is lower and lower, so both the owner and the contractor will be benefited.  Disadvantages: estimated cost should be accurate. Other wise the contractor get more profit if the actual cost is much higher than the estimated cost. 18 BACK
  • 19.  When the work is awarded on contract by mutual negotiation between the parties with out call of tenders, it is said to be negotiated contract.  In PWD, the contract are negotiated on special conditions like to obtain reasonable rates and also helpful in case of emergency.  Basic advantage by this system is that it brings economy in expenditure, parties will be reliable and less chance of disputes 19 BACK
  • 20. 20 9. Target contract The contractor is paid a fixed fee on a prime cost basis for the work performed under the contract and in addition he receives a percentage on the savings effected against either a prior agreed estimated total cost or a target value arrived without changing the specification. It was presumed that by proper management of the work, the contractor can reduce the cost of work. But due to tremendous increase in the cost of materials it never materialise and hence this system is not getting popularity. BACK
  • 21. 21 10. Labour contract This is the most commonly adopted system for the construction of private individual buildings in small cities. The contractor arranges all necessary labour, tools & plant and equipments required. The materials are supplied by the owner and he appoints an Engineer to supervise the work to maintain the quality and economy in construction. This system is suitable in the works of Govt. departments as they are in a privileged position to buy large quantities of materials at cheap rates. BACK
  • 22. 22 11. Joint venture contract In case of huge important projects the construction works can be categorised into different parts and each part can be given to a specialised contractor in that field. This method improves the quality of work and the project can be completed within a short period of time. Thus the project works can be divided among different contractors and hence joint venture system of contract developed. BACK
  • 23. 23 12. BOT system Build operate and transfer is a new system in which the land is acquired by the Govt. and the contractor is asked to build the structure and then operate it until he collects the money he had spent for the construction, as fees from the users. Once the construction cost is recovered, the structure is handed over to the owner. No payment is made to the contractor by the owner/Govt. Security is provided to the builder by the Govt. regarding law and order problems if any. Bridges and roads are usually constructed by adopting this system of contract. Toll is collected from the users/vehicles passing over it by the contractor to recover the construction cost.
  • 24. SELF STUDY:  Responsibilities of Owner / Client.  Responsibilities of Engineer.  Responsibilities of Contractor. 24 BACK