The document describes a validation study of an Early Requirement Testing Method (ERTM) for e-government projects. Test engineers used the ERTM, which involves reviewing requirements documents and providing feedback, on six e-government projects. The number of defects found before and after applying the ERTM and providing interventions was compared using a statistical test. The results showed that overall, there was a statistically significant reduction in the number of defects found after applying the ERTM, suggesting it is useful for improving requirements documentation. However, one project saw an increase in defects due to additional requirements added later in the project.