Version Management inSAP ECC
6.0
• Enhancing Traceability, Compliance, and
Process Control
2.
Overview of VersionManagement
• • Robust functionality to monitor, track, and
control changes.
• • Applicable to transactional and master data
across SAP modules.
• • Enhances traceability, compliance, and
operational efficiency.
3.
Supported Modules
• •Materials Management (MM)
• • Production Planning (PP)
• • Sales and Distribution (SD)
• • Project Systems (PS)
• • Quality Management (QM)
• • Product Lifecycle Management (PLM)
4.
Technical Prerequisites
• •SAP ECC 6.0 with EHP4 or higher.
• • Kernel Version: 7.20 (Unicode) or higher.
• • Database compatibility and updated SP
levels.
• • Enable Change Document functionality.
5.
Development and Enhancements
•• ABAP Enhancements for custom workflows.
• • Field selection for version control.
• • Integration with Business Add-Ins (BAdIs) or
user exits.
6.
Implementation Considerations
• •Configure in DEV system and transport to
QAS/PRD.
• • Integration with Change Management.
• • Training and documentation for end-users.
• • Enable change logs for auditing.
7.
Advantages of Version
Management
•• Enhanced traceability.
• • Regulatory compliance.
• • Improved process control.
• • Seamless integration with workflows.
8.
Challenges and Risks
•• Complex configuration.
• • Impact on system performance.
• • Importance of user training.
9.
Test Cases forthe Energy Industry
• • Case 1: Fuel Procurement
• - Create and modify Purchase Orders.
• - Validate version creation and audit logs.
• • Case 2: Maintenance Orders
• - Track changes in order tasks and schedules.
• - Verify new versions for each modification.
• • Case 3: BOM Changes
10.
Workflow Diagram
• •Diagram: Version Management Lifecycle
• - Show stages such as Creation, Modification,
Versioning, and Auditing.
• - Add visuals for clarity, e.g., a flowchart with
input and output processes.
11.
Integration with Change
Management
•• Diagram: Integration Points
• - Diagram to show touchpoints between
Version Management and other modules (e.g.,
MM, PP).
• - Visualize workflows like Change Request
Approval.
12.
Conclusion
• • SAPVersion Management ensures process
transparency and compliance.
• • Integrated solution for operational
efficiency.
• • Recommended for industries requiring
rigorous change tracking.
13.
Appendix
• • AdditionalNotes:
• - References to SAP Notes for prerequisites.
• - Placeholder for detailed diagrams.
14.
Sample Diagrams
• •Lifecycle Workflow:
• - Visualize the process from data input to
version closure.
• • Energy Industry Test Case Diagrams:
• - Example: Fuel Procurement PO lifecycle
with version tracking.