Contact us Heritage collections Image license terms
HOME Literature Reactors
Further reading □ Articles □ The future organisation of the UK Atomic Energy Project □ New authority for atomic energy □ Khrushchev and Bulganin charm offensive □ BEPO: Wigner Energy Release (1958) □ The miracle of atomic energy □ Biographies □ BEPO and the Turin Shroud □ Atom Harvest □ Sir John Cockcroft and Atomic Energy □ Nuclear physics in the United Kingdom 1911-1986 □ Russian spy in the Cotswolds □ Los Alamos from below □ Fateful discovery almost forgotten □ UK panel on gamma and electron irradiation: A brief history 1963-1984 □ Worlds oldest digital computer gets reboot: the Dekatron □ Haunt of the Hammer Gang □ RAF Harwell □ Before the war □ Celestial towers □ A personal history of RAF Station Harwell □ The 25th anniversary of D-Day □ Publications □ Newsletters □ Technical publications □ Committee minutes and other papers □ Other materials □ Photographs □ Films □ Ephemera □ Personal reminiscences
Contact us Heritage archives Image license terms

Search

    A.E.R.E HARWELL
⟶ Harwell ⟶ Literature
A.E.R.E HARWELL
⟶ Harwell ⟶ Literature
Further reading ⇓


Articles
□ The future organisation of the UK Atomic Energy Project □ New authority for atomic energy □ Khrushchev and Bulganin charm offensive □ BEPO: Wigner Energy Release (1958) □ The miracle of atomic energy □ Biographies □ BEPO and the Turin Shroud □ Atom Harvest □ Sir John Cockcroft and Atomic Energy □ Nuclear physics in the United Kingdom 1911-1986 □ Russian spy in the Cotswolds □ Los Alamos from below □ Fateful discovery almost forgotten □ UK panel on gamma and electron irradiation: A brief history 1963-1984 □ Worlds oldest digital computer gets reboot: the Dekatron □ Haunt of the Hammer Gang
RAF Harwell
□ Before the war □ Celestial towers □ A personal history of RAF Station Harwell □ The 25th anniversary of D-Day
Publications
□ Newsletters □ Technical publications □ Committee minutes and other papers
Other materials
□ Photographs □ Films □ Ephemera □ Personal reminiscences

Harwell technical brochures

Leaflets holder (1960s) DAPHNE Zero Energy Heavy Water Reactor (IS Leaflet no.291258 Revised, 1960s) DIDO Heavy Water Reactor (IS Leaflet no.291348, 1960s) NIRNS 50 MeV Proton Linear Accelerator (IS Leaflet no.291359, 1960s) GLEEP Graphite Low Energy Experimental Pile (IS Leaflet no.291375, 1960s) BEPO Air Cooled Graphite Moderated Reactor (IS Leaflet no.291380, 1960s) PLUTO Heavy Water Reactor (IS Leaflet no.291381, 1960s) LIDO Shielding Reactor (IS Leaflet no.291382, 1960s) Rare Gas Fission Product Rig (IS Leaflet no.291466, 1960s) 2000 degree C Fission Product Rig (IS Leaflet no.305506, 1960s) DIDO Fast Rabbit (IS Leaflet no.305605, 1960s) DIDO Rabbit Network (IS Leaflet no.305606, 1960s) High Pressure Water Loop (IS Leaflet no.305633, 1960s) Graphite Irradiation Rigs (IS Leaflet no.305646, 1960s) Ionisation Chamber Test Rig Mk.8 (1960s)

Harwell: Research Laboratory of the UKAEA (1980) Harwell: Research Laboratory of the UKAEA (1986) Computing Technology for the benefit of Industry (1984) Computing Technology for the benefit of Industry (1988)

Accelerator services (1974/1975) Accelerator beams for industry and research (1974) Atomic energy (1974) Biomedical research (1974) Fundamental research (1974) Harwell synchrocyclotron (1974) Harwell tandem generator (1974) Harwell variable energy cyclotron (1974) Industrial applications (1974) Isotope separators and ion implantation facilities (1974) Cockcroft-Walton ion implantation (1975) Electrons, protons and gamma rays (1975) Harwell linear accelerator (1975) Ion beams on the 6MV Van de Graaff (1975) Proton microbeam facility (1975) Thin layer activation for measurement of wear and corrosion (1975)

Reactor Irradiation Facilities (1978) High Neutron Dose In-Reactor Metals Creep Tests (1978) High Temperature Reactor Fuels Testing Loop (1978) Operational Power Transient Experiments (1978) Systems And Instrumentation (1978) Technical Assessment: Thermal, Hydraulic, Stress And Structure (1978) Nuclear and technical consultancy (1978)

Notes of a conversation with DW Fry (Notes on the history of accelerators for a Times Review article presumably written KEB Jay in conversation, 16 March 1954) DW Fry biographical information from Nature Notes on a conversation with D D Taylor (K Jay, 29 March 1954) Facilities for atomic energy research particle accelerators 1953-1957 (John Hendry, handwritten note with references) Facilities for atomic energy research particle accelerators 1953-1957 (John Hendry, transcript of handwritten note; references are in the handwritten version) Criteria for a power-producing thermonuclear reactor with arbitrary losses (ER Harrison, 1960?) Notes on the history of the electron synchrotron (J Kay, 10 July 1964) Interview with BL (Basil) Tozer (Worked on EMR and ZETA at Harwell; transcript included; 16 July 1981)

Atom Train (1947; travelling exhibition to educate the public about atomic energy and its implications, covering both peaceful applications and the effects of atomic weapons; organised by the British ASA (Atomic Scientists Association)) A Plain Man's Guide to Zeta (A Manchester Guardian pamphlet by John Maddox, c.1958, PDF courtesy David Brazier) A short history of CADET (RCM Barnes, 1960) Icknield Way House: Staff Club B Information for residents (probably 1960s) Guide to the AERE Library and Information Services (March 1960) Guide to the AERE Library and Information Services (September 1960) Harwell Handbook (a useful guide to AERE's work and facilities plus a few pages on Rutherford Laboratory, no date of publication but probably about 1961/2) Harwell brings new hope to heart sufferers (10 November 1975) Safety and nuclear power (1977) Harwell: Europe's largest centre for multi-disciplinary research and development (1980) Harwell: the first 40 years (Publicity brochure written by John Stubbs, 1986) Harwell Laboratory Emergency Arrangements (1988, with thanks to John Berry)

AERE: The Atomic Energy Research Establishment (1950) Proton Linear Accelerators for nuclear research and the AERE 600 MeV project (Paper by TG Pickavance published in Nuovo Cimento, 1955) The Atomic Energy Research Establishment: A brief guide (1956) Article about the PLA (extract from Engineering Review produced by Standards and Inspection Group, July 1962) Articles about the Tandem Generator and Site Engineering at Wantage (extracts from Engineering Review produced by Engineering Division, September 1963) 25 years of theoretical physics 1954-1979 / A special progress report from Theoretical Physics Division, Harwell, in recognition of the 25th anniversary of the UK Atomic Energy Authority (PDF courtesy Ludwig Schreier)

AERE Open Day for Electronics, General Physics, Health Physics and Medical Divisions (Invitation, programme and list of exhibits, 29 May 1954) AERE Open Days (Visitor's guide, 28 May to 1 June 1956) Research Reactors Division Open Days (Visitor's guide, 6 and 7 April 1962) Metallurgy Division Open Day (17 July 1965)

Apprenticeship schemes at AERE Harwell (1957, with thanks to PG) Careers in nuclear engineering (1959) Research careers in atomic energy: Harwell, Winfrith, Amersham and Wantage (1961) Research careers in atomic energy: Harwell, Culham, Amersham and Wantage (1961, courtesy Bob Loader) Summer vacation studentships at Harwell and Culham (1965) Harwell Education and Training Centre (1970) The first thirty years of Apprentice training at Harwell (1948-1978) Mathematical methods for computing courses (1984)

Our thanks to GL for many of these.

1950s
Annual Report 1954-55 Annual Report 1955-56 ATOM 1955-56 Annual Report 1956-57 ATOM 1956-57 Annual Report 1957-58 ATOM 1957-58 Annual Report 1958-59 ATOM 1958-59 Annual Report 1959-60 ATOM 1959-60
1960s
Annual Report 1960-61 ATOM 1960-61 Annual Report 1961-62 ATOM 1961-62 ATOM 1962-63 ATOM 1963-64 ATOM 1964-65 ATOM 1965-66 ATOM 1966-67 ATOM 1967-68 ATOM 1968-69 ATOM 1969-70
1970s
ATOM 1970-71 ATOM 1971-72

The future organisation of the United Kingdom Atomic Energy Authority (UKAEA, November 1953) Careers with the industrial group (UKAEA, c.1957; PDF courtesy David Brazier) The ABC of atomic energy (1958, a pamphlet published by the BBC written by Sir Christopher Hinton; PDF courtesy David Brazier) Facts about ZETA (UKAEA, 1960s) Nuclear power in Britain (UKAEA, 1962) The UKAEA (February 1963) UKAEA Services Overseas (1979) Nuclear Waste Management (1981, subsequently withdrawn) The development of atomic energy 1939 to 1984

Industrial Safety Handbook (June 1951) Safe from radiation (1960s) First aid essentials (November 1962) Basic training in radiation safety (July 1964) The system of control of radiological hazards at Harwell (October 1964) Solvents for cleaning (November 1965) Use of flammable liquids and gases in glove boxes (June 1966) Health physics notes for staff working on the Harwell Reactor Site (HL74/252, Environmental and Medical Sciences Division, January 1974)

TRE Open Days (Guidebook, 25-27 May 1948) Notes for AEA Harwell officers visiting USA with a paragraph on visits to Canada (1958) Atoms at work (1960s) Atoms at work (October 1963) Rush Common House (November 1967) On the feasibility of coal-driven power stations (1975, A tongue-in-cheek article by Otto Frisch) the Atom / Los Alamos Scientific Laboratory (January-February 1979) Nuclear fusion: power for the next century (May 1980, published by UKAEA as a contribution to the wider understanding of nuclear power) Sellafield: A natural reaction (BNFL brochure, 1980s) Thorp: The facts (BNFL brochure, 1980s) Calder Hall (A short history of the world's first industrial-scale nuclear power station, 1988, British Nuclear Fuels plc) Finding out about nuclear energy (GCSE resource book produced with assistance from UKAEA and Nirex, 1989) The mighty atom (A little book for children explaining atoms and neutrons, 1990, British Nuclear Fuels plc) Nuclear power and the greenhouse effect (UKAEA brochure, January 1990) Nuclear power and leukaemia (UKAEA brochure, March 1991) Magnox Encapsulation Plant (BNFL brochure, 1991) The Vitrification Plant (BNFL brochure, 1991) THORP: The Thermal Oxide Reprocessing Plant (BNFL brochure, 1992) Sellafield (BNFL brochure, 1993) Fusion research in the UK 1945-1960 (1993, J Hendry and JD Lawson; original source: https://scientific-publications.ukaea.uk/wp-content/uploads/Fusion-research-in-the-UK-1945-1960.pdf)

⇑ Top of page
© Chilton Computing and UKRI Science and Technology Facilities Council webmaster@chilton-computing.org.uk
Our thanks to UKRI Science and Technology Facilities Council for hosting this site