Skip to content

Conversation

@leehinman
Copy link
Contributor

What does this PR do?

ga santa integration

  • version to 1.0.0
  • release to ga
  • kibana.version to 7.16.0
  • remove release from data_stream

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
    - [ ] I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
    - [ ] If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

Related issues

@elasticmachine
Copy link

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@elasticmachine
Copy link

elasticmachine commented Sep 13, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview preview

Expand to view the summary

Build stats

  • Start Time: 2021-09-27T18:03:39.178+0000

  • Duration: 11 min 18 sec

  • Commit: 73babec

Test stats 🧪

Test Results
Failed 0
Passed 13
Skipped 0
Total 13

🤖 GitHub comments

To re-run your PR in the CI, just comment with:

  • /test : Re-trigger the build.

- version to 1.0.0
- release to ga
- kibana.version to 7.16.0
- remove release from data_stream

Relates elastic#1562
@leehinman leehinman merged commit fde8b65 into elastic:master Sep 30, 2021
@leehinman leehinman deleted the ga_santa branch September 30, 2021 14:41
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

enhancement New feature or request

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants